Canterbury Earthquakes Royal Commission Te Komihana Rūwhenua o Waitaha Canterbury Earthquakes Royal Commission – Te Komihana Rūwhenua o Waitaha

Those who lost relatives and friends in the 22 February earthquake can be assured that there will be a very thorough inquiry into the failure of buildings that resulted in loss of life.
Chair, Justice Mark Cooper

Document library

Document categories

Additional filter options

Choose 1 or more filters then press 'Apply filter'
Reset

Search results

Published No sorted Title Not sorted Author(s) Sorted descending Category Not sorted Subject(s) Not sorted Building(s) Not sorted Action
2012-08-17-14- 11-0417 August 2012Building Management after Earthquakes: Submission by IPENZ on Royal Commission Discussion PaperBuilding Management after Earthquakes: Submission by IPENZ on Royal Commission Discussion Paper
    Institution of Professional Engineers New Zealand (IPENZ)
    Submission
  • Building assessments after earthquakes
  • Placarding (Stickering)
  • Safety Evaluation
    2012-09-07-15- 06-3907 September 2012CTV Building hearing: Chapter 4 of The Institution of Professional Engineers Code of Ethics, 1989CTV Building hearing: Chapter 4 of The Institution of Professional Engineers Code of Ethics, 1989
      Institution of Professional Engineers New Zealand (IPENZ)
      Referenced Document
    • Buildings - Representative Sample
    • Standards and Regulation
      2012-09-06-16- 36-1206 September 2012CTV Building hearing: IPENZ credentials of Graeme Tapper and Bryan Bluck CTV Building hearing: IPENZ credentials of Graeme Tapper and Bryan Bluck
        Institution of Professional Engineers New Zealand (IPENZ)
        Referenced Document
        Buildings - Representative Sample
        Madras 249
      2012-01-30-15- 47-2330 January 2012Rating System for Buildings Earthquake Resilience: Submission by Don Holden of INLAW Group, November 2011Rating System for Buildings Earthquake Resilience: Submission by Don Holden of INLAW Group, November 2011
        INLAW Group
        Submission
      • New Building Technologies
      • Unreinforced Masonry Buildings (URM)
        2011-11-07-15- 54-3107 November 2011Performance of Unreinforced Masonry Buildings in the 2010/2011 Canterbury Earthquakes - Part 4: Presentation by Jason Ingham, University of Auckland, November 2011Performance of Unreinforced Masonry Buildings in the 2010/2011 Canterbury Earthquakes - Part 4: Presentation by Jason Ingham, University of Auckland, November 2011
          Ingham, Jason M
          Exhibit
          Unreinforced Masonry Buildings (URM)
          2011-11-07-11- 31-2407 November 2011Jason Maxwell Ingham, Associate Professor and Deputy HOD, Civil and Environmental Engineering, University of AucklandJason Maxwell Ingham, Associate Professor and Deputy HOD, Civil and Environmental Engineering, University of Auckland
            Ingham, Jason M
            Speaker Profile
            Profile
            2011-11-07-15- 53-3707 November 2011Performance of Unreinforced Masonry Buildings in the 2010/2011 Canterbury Earthquakes - Part 3: Presentation by Jason Ingham, University of Auckland, November 2011Performance of Unreinforced Masonry Buildings in the 2010/2011 Canterbury Earthquakes - Part 3: Presentation by Jason Ingham, University of Auckland, November 2011
              Ingham, Jason M
              Exhibit
              Unreinforced Masonry Buildings (URM)
              2011-11-03-16- 05-4003 November 2011Performance of Unreinforced Masonry in the 2010/2011 Canterbury Earthquake Swarm: Technical Report by Associate Professor Jason M Ingham and Professor Michael C Griffith, August 2011Performance of Unreinforced Masonry in the 2010/2011 Canterbury Earthquake Swarm: Technical Report by Associate Professor Jason M Ingham and Professor Michael C Griffith, August 2011
                Ingham, Jason M
                Technical Report
                Unreinforced Masonry Buildings (URM)
                2011-11-07-15- 52-2307 November 2011Performance of Unreinforced Masonry Buildings in the 2010/2011 Canterbury Earthquakes Part 1: Presentation by Jason Ingham, University of Auckland, November 2011Performance of Unreinforced Masonry Buildings in the 2010/2011 Canterbury Earthquakes Part 1: Presentation by Jason Ingham, University of Auckland, November 2011
                  Ingham, Jason M
                  Exhibit
                  Unreinforced Masonry Buildings (URM)
                  2011-11-07-15- 55-2707 November 2011Performance of Unreinforced Masonry Buildings in the 2010/2011 Canterbury Earthquakes - Part 5: Presentation by Jason Ingham, University of Auckland, November 2011Performance of Unreinforced Masonry Buildings in the 2010/2011 Canterbury Earthquakes - Part 5: Presentation by Jason Ingham, University of Auckland, November 2011
                    Ingham, Jason M
                    Exhibit
                    Unreinforced Masonry Buildings (URM)
                    2011-11-15-09- 08-4015 November 20112011-11-08 Unreinforced Masonry (URM) Buildings and Earthquake-Prone Policies hearing transcript2011-11-08 Unreinforced Masonry (URM) Buildings and Earthquake-Prone Policies hearing transcript
                      Ingham, Jason M
                      Transcript
                      Unreinforced Masonry Buildings (URM)
                      2011-11-03-16- 05-2703 November 2011The Performance of Earthquake Strengthened URM Buildings in the Christchurch CBD in the 22 February 2011 Earthquake: Addendum Report by Associate Professor Jason M. Ingham and Professor Michael C. Griffith, October 2011The Performance of Earthquake Strengthened URM Buildings in the Christchurch CBD in the 22 February 2011 Earthquake: Addendum Report by Associate Professor Jason M. Ingham and Professor Michael C. Griffith, October 2011
                        Ingham, Jason M
                        Technical Report
                        Unreinforced Masonry Buildings (URM)
                        2011-11-07-16- 02-0807 November 2011Performance of Unreinforced Masonry Buildings in the 2010/2011 Canterbury Earthquakes - Part 2: Presentation by Jason Ingham, University of Auckland, November 2011Performance of Unreinforced Masonry Buildings in the 2010/2011 Canterbury Earthquakes - Part 2: Presentation by Jason Ingham, University of Auckland, November 2011
                          Ingham, Jason M
                          Exhibit
                          Unreinforced Masonry Buildings (URM)
                          2011-11-15-09- 17-0315 November 20112011-11-07 Unreinforced Masonry (URM) Buildings and Earthquake-Prone Policies hearing transcript2011-11-07 Unreinforced Masonry (URM) Buildings and Earthquake-Prone Policies hearing transcript
                            Ingham, Jason M
                            Transcript
                            Unreinforced Masonry Buildings (URM)
                            2012-08-17-17- 00-3117 August 2012CTV Building: Statement of Evidence of Russell Warren IbbotsonCTV Building: Statement of Evidence of Russell Warren Ibbotson
                              Ibbotson, R W
                              Exhibit
                              Buildings - Representative Sample
                              Madras 249
                            2012-07-02-15- 01-0702 July 2012CTV Building hearing: Email from John Drew to Ibbotson Cooney Limited regarding insurance claims for windows and green stickering of the building, September 2010CTV Building hearing: Email from John Drew to Ibbotson Cooney Limited regarding insurance claims for windows and green stickering of the building, September 2010
                              Ibbotson Cooney Ltd
                              Exhibit
                              Buildings - Representative Sample
                              Madras 249
                            2012-07-10-15- 38-0710 July 2012CTV Building hearing: Interview of Ron Godkin regarding CTV Building by Clark Hyland and Ashley SmithCTV Building hearing: Interview of Ron Godkin regarding CTV Building by Clark Hyland and Ashley Smith
                              Hyland, Clark
                              Exhibit
                              Buildings - Representative Sample
                              Madras 249
                            2012-11-23-11- 37-2923 November 2012CTV Building hearing: Joint report of Elastic Response Spectra Analysis PanelCTV Building hearing: Joint report of Elastic Response Spectra Analysis Panel
                              Hyland, Clark
                              Exhibit
                              Buildings - Representative Sample
                              Madras 249
                            2012-06-25-15- 39-0425 June 2012CTV Building hearing: CTV Building Collapse Investigation Report by Dr Clark Hyland and Ashley Smith, January 2012CTV Building hearing: CTV Building Collapse Investigation Report by Dr Clark Hyland and Ashley Smith, January 2012
                              Hyland, Clark
                            • Exhibit
                            • Technical Report
                              Buildings - Representative Sample
                              Madras 249
                            2012-11-26-14- 41-3826 November 2012CTV Building hearing: Transcript of interview with Bill Jones, ex-foreman on the CTV building, on 20 September 2011CTV Building hearing: Transcript of interview with Bill Jones, ex-foreman on the CTV building, on 20 September 2011
                              Hyland, Clark
                              Exhibit
                            • Buildings - Representative Sample
                            • Interviews
                              Madras 249

                            Search results navigation

                            Displaying 965 - 984 of 1948 items arrow left First arrow left Prev arrow right Next arrow right Last