Canterbury Earthquakes Royal Commission Te Komihana Rūwhenua o Waitaha Canterbury Earthquakes Royal Commission – Te Komihana Rūwhenua o Waitaha

Those who lost relatives and friends in the 22 February earthquake can be assured that there will be a very thorough inquiry into the failure of buildings that resulted in loss of life.
Chair, Justice Mark Cooper

Document library

Document categories

Additional filter options

Choose 1 or more filters then press 'Apply filter'
Reset

Search results

Published No sorted Title Not sorted Author(s) Not sorted Category Not sorted Subject(s) Sorted descending Building(s) Not sorted Action
2012-08-15-13- 07-0815 August 2012Building Management After Earthquakes: Submission by Bruce Galloway and John Hare of Holmes Consulting Group on the Royal Commission Discussion Paper, July 2012Building Management After Earthquakes: Submission by Bruce Galloway and John Hare of Holmes Consulting Group on the Royal Commission Discussion Paper, July 2012
  • Galloway, Bruce
  • Hare, John
  • Holmes Consulting Group
    Submission
  • Building assessments after earthquakes
  • Central Business District (CBD)
  • Engineering
  • Placarding (Stickering)
  • Safety Evaluation
  • Standards and Regulation
    2012-02-14-11- 39-1814 February 2012Colombo 601/601A hearing: Engineers inspection of damaged buildingsColombo 601/601A hearing: Engineers inspection of damaged buildings
      Campbell, Paul
      Exhibit
    • Building assessments after earthquakes
    • Buildings - Representative Sample
    • Colombo 601
    • Colombo 601A
    2012-07-10-12- 29-1110 July 2012CTV Building hearing: CTV Building Collapse Technical Investigation - presentation by Dr Clark Hyland and Ashley SmithCTV Building hearing: CTV Building Collapse Technical Investigation - presentation by Dr Clark Hyland and Ashley Smith
    • Hyland, Clark
    • Smith, Ashley
      Exhibit
    • Building assessments after earthquakes
    • Buildings - Representative Sample
    • Engineering
      Madras 249
    2012-03-09-17- 37-0809 March 2012Architectural Implications of New Technologies (in seismic resistant design): Presentation by Associate Professor Andrew W Charleson, Victoria University, for the hearing on New Building TechnologiesArchitectural Implications of New Technologies (in seismic resistant design): Presentation by Associate Professor Andrew W Charleson, Victoria University, for the hearing on New Building Technologies
      Charleson, Andrew W
      Exhibit
    • Architecture
    • New Building Technologies
      2012-11-27-15- 39-3627 November 2012Dr John Wilson's Contextual Historical Overview of Christchurch City, 2005.Dr John Wilson's Contextual Historical Overview of Christchurch City, 2005.
        Wilson, John
        Referenced Document
      • Architecture
      • Central Business District (CBD)
      • Christchurch Recovery
      • Culture and Heritage
        2012-11-27-15- 44-3427 November 2012Draft Central City Plan, August 2011, Volume 1Draft Central City Plan, August 2011, Volume 1
          Christchurch City Council
          Referenced Document
        • Architecture
        • Central Business District (CBD)
        • Christchurch Recovery
        • Culture and Heritage
          2011-11-09-13- 54-1209 November 2011Photos of the Mt Eden Road Shopping Centre, Auckland supplied by Joe Arts - full sized slidesPhotos of the Mt Eden Road Shopping Centre, Auckland supplied by Joe Arts - full sized slides
            Arts, Joe
            Exhibit
            Unreinforced Masonry Buildings (URM)
            2012-02-27-13- 51-3227 February 2012Additional Christchurch City Council submissions on legal requirements for earthquake-prone buildings and related matters (issues 3(b) to 3(d) Additional Christchurch City Council submissions on legal requirements for earthquake-prone buildings and related matters (issues 3(b) to 3(d)
              Christchurch City Council
              Submission
              Unreinforced Masonry Buildings (URM)
              2011-11-03-16- 05-4003 November 2011Performance of Unreinforced Masonry in the 2010/2011 Canterbury Earthquake Swarm: Technical Report by Associate Professor Jason M Ingham and Professor Michael C Griffith, August 2011Performance of Unreinforced Masonry in the 2010/2011 Canterbury Earthquake Swarm: Technical Report by Associate Professor Jason M Ingham and Professor Michael C Griffith, August 2011
              • Griffith, Michael C
              • Ingham, Jason M
                Technical Report
                Unreinforced Masonry Buildings (URM)
                2011-10-21-14- 25-0921 October 2011Performance of Unreinforced Masonry in the 2010/2011 Canterbury Earthquake Swarm: Peer Review by Fred Turner, August 2011Performance of Unreinforced Masonry in the 2010/2011 Canterbury Earthquake Swarm: Peer Review by Fred Turner, August 2011
                  Turner, Fred
                  Technical Report
                  Unreinforced Masonry Buildings (URM)
                  2011-10-27-16- 52-3627 October 2011Unreinforced masonry and other earthquake prone buildings - Requirements for seismic strengthening: Submission by Joe Arts, October 2011Unreinforced masonry and other earthquake prone buildings - Requirements for seismic strengthening: Submission by Joe Arts, October 2011
                    Arts, Joe
                  • Exhibit
                  • Submission
                    Unreinforced Masonry Buildings (URM)
                    High 137-139
                  2011-11-14-14- 28-5214 November 2011Benson Chen Holdings Ltd application for building consent for 605 Colombo StreetBenson Chen Holdings Ltd application for building consent for 605 Colombo Street
                    Christchurch City Council
                    Exhibit
                    Unreinforced Masonry Buildings (URM)
                    Colombo 605
                  2011-11-07-15- 52-2307 November 2011Performance of Unreinforced Masonry Buildings in the 2010/2011 Canterbury Earthquakes Part 1: Presentation by Jason Ingham, University of Auckland, November 2011Performance of Unreinforced Masonry Buildings in the 2010/2011 Canterbury Earthquakes Part 1: Presentation by Jason Ingham, University of Auckland, November 2011
                    Ingham, Jason M
                    Exhibit
                    Unreinforced Masonry Buildings (URM)
                    2011-11-07-15- 53-3707 November 2011Performance of Unreinforced Masonry Buildings in the 2010/2011 Canterbury Earthquakes - Part 3: Presentation by Jason Ingham, University of Auckland, November 2011Performance of Unreinforced Masonry Buildings in the 2010/2011 Canterbury Earthquakes - Part 3: Presentation by Jason Ingham, University of Auckland, November 2011
                      Ingham, Jason M
                      Exhibit
                      Unreinforced Masonry Buildings (URM)
                      2011-11-07-16- 02-0807 November 2011Performance of Unreinforced Masonry Buildings in the 2010/2011 Canterbury Earthquakes - Part 2: Presentation by Jason Ingham, University of Auckland, November 2011Performance of Unreinforced Masonry Buildings in the 2010/2011 Canterbury Earthquakes - Part 2: Presentation by Jason Ingham, University of Auckland, November 2011
                        Ingham, Jason M
                        Exhibit
                        Unreinforced Masonry Buildings (URM)
                        2011-11-07-15- 54-3107 November 2011Performance of Unreinforced Masonry Buildings in the 2010/2011 Canterbury Earthquakes - Part 4: Presentation by Jason Ingham, University of Auckland, November 2011Performance of Unreinforced Masonry Buildings in the 2010/2011 Canterbury Earthquakes - Part 4: Presentation by Jason Ingham, University of Auckland, November 2011
                          Ingham, Jason M
                          Exhibit
                          Unreinforced Masonry Buildings (URM)
                          2011-11-07-15- 55-2707 November 2011Performance of Unreinforced Masonry Buildings in the 2010/2011 Canterbury Earthquakes - Part 5: Presentation by Jason Ingham, University of Auckland, November 2011Performance of Unreinforced Masonry Buildings in the 2010/2011 Canterbury Earthquakes - Part 5: Presentation by Jason Ingham, University of Auckland, November 2011
                            Ingham, Jason M
                            Exhibit
                            Unreinforced Masonry Buildings (URM)
                            2011-11-09-11- 59-1309 November 2011Statement of Evidence from Daniel Steven Newman of Property Council New Zealand to the Canterbury Earthquakes Royal CommissionStatement of Evidence from Daniel Steven Newman of Property Council New Zealand to the Canterbury Earthquakes Royal Commission
                              Newman, Daniel
                              Exhibit
                              Unreinforced Masonry Buildings (URM)
                              2011-11-03-16- 06-0303 November 2011Performance of Unreinforced Masonry Buildings in the 2010/2011 Canterbury Earthquake Swarm: Peer Review by Bret Lizundia, September 2011Performance of Unreinforced Masonry Buildings in the 2010/2011 Canterbury Earthquake Swarm: Peer Review by Bret Lizundia, September 2011
                              • Lizundia, Bret
                              • Rutherford & Chekene
                                Technical Report
                                Unreinforced Masonry Buildings (URM)
                                2012-04-05-14- 02-2405 April 2012Heritage Buildings, Earthquake Strengthening and Damage: The Canterbury Earthquakes September 2010-January 2012: Technical report by Robert McClean and NZHPTHeritage Buildings, Earthquake Strengthening and Damage: The Canterbury Earthquakes September 2010-January 2012: Technical report by Robert McClean and NZHPT
                                  New Zealand Historic Places Trust
                                  Technical Report
                                  Unreinforced Masonry Buildings (URM)

                                  Search results navigation

                                  Displaying 269 - 288 of 1327 Items arrow left First arrow left Prev arrow right Next arrow right Last