Canterbury Earthquakes Royal Commission Te Komihana Rūwhenua o Waitaha Canterbury Earthquakes Royal Commission – Te Komihana Rūwhenua o Waitaha

Those who lost relatives and friends in the 22 February earthquake can be assured that there will be a very thorough inquiry into the failure of buildings that resulted in loss of life.
Chair, Justice Mark Cooper

Document library

Document categories

Additional filter options

Choose 1 or more filters then press 'Apply filter'
Reset

Search results

Published No sorted Title Not sorted Author(s) Not sorted Category Sorted descending Subject(s) Not sorted Building(s) Not sorted Action
2011-10-21-14- 14-0321 October 2011System of Building Controls - Exhibit A and appendix A of the Briefing to Royal Commission of Inquiry into building failure caused by Canterbury Earthquakes about the Building Regulatory Framework: Technical report by Department of Building and Housing, May 2011System of Building Controls - Exhibit A and appendix A of the Briefing to Royal Commission of Inquiry into building failure caused by Canterbury Earthquakes about the Building Regulatory Framework: Technical report by Department of Building and Housing, May 2011
    Department of Building and Housing
    Technical Report
    Standards and Regulation
    2011-11-15-13- 35-2515 November 2011Review of NZ Building Codes of Practice: Technical report by Gregory MacRae, Charles Clifton and Les Megget, August 2011Review of NZ Building Codes of Practice: Technical report by Gregory MacRae, Charles Clifton and Les Megget, August 2011
    • Clifton, Charles
    • MacRae, Gregory
    • Megget, Lee
      Technical Report
      Standards and Regulation
      2011-12-01-09- 09-1901 December 2011Management of Earthquake Risk by Canterbury Regional Council and Christchurch City Council - Obligations and Responses under RMA: Technical Report by Enfocus Ltd, November 2011Management of Earthquake Risk by Canterbury Regional Council and Christchurch City Council - Obligations and Responses under RMA: Technical Report by Enfocus Ltd, November 2011
        Enfocus Ltd
        Technical Report
        Standards and Regulation
        2011-10-21-14- 05-2021 October 2011System of Building Controls - Appendix A, Section 4: Building Act tools for the upgrading of the structural performance of buildings assessment and improvement of the structural performance of buildings in earthquakes: Technical report by New Zealand Society for Earthquake Engineering, June 2006System of Building Controls - Appendix A, Section 4: Building Act tools for the upgrading of the structural performance of buildings assessment and improvement of the structural performance of buildings in earthquakes: Technical report by New Zealand Society for Earthquake Engineering, June 2006
        • Department of Building and Housing
        • New Zealand Society for Earthquake Engineering
          Technical Report
        • Standards and Regulation
        • Unreinforced Masonry Buildings (URM)
          2011-10-21-14- 27-2521 October 2011System of Building Controls - Regulation of Registered Architects - Registered Architects Act 2005 and Registered Architects Rules 2006: Technical Report by New Zealand Cabinet, 2006System of Building Controls - Regulation of Registered Architects - Registered Architects Act 2005 and Registered Architects Rules 2006: Technical Report by New Zealand Cabinet, 2006
          • Department of Building and Housing
          • New Zealand Cabinet
            Technical Report
          • Standards and Regulation
          • Training and Education
            2012-03-12-12- 21-2812 March 2012Foundations on Deep Alluvial Soils: Peer Review by Jonathan D Bray, October 2011Foundations on Deep Alluvial Soils: Peer Review by Jonathan D Bray, October 2011
              Bray, Jonathan D
              Technical Report
              Geotechnical
              2011-11-07-14- 26-5407 November 2011Report into Building Safety Evaluation in the Central Business District Following the 4 September 2010 Earthquake: Technical Report by the Christchurch City Council, August 2011, Part 5 of 5, Page 171-196Report into Building Safety Evaluation in the Central Business District Following the 4 September 2010 Earthquake: Technical Report by the Christchurch City Council, August 2011, Part 5 of 5, Page 171-196
                Christchurch City Council
                Technical Report
                Placarding (Stickering)
                2011-11-07-14- 27-4207 November 2011Report into Building Safety Evaluation in the Central Business District Following the 4 September 2010 Earthquake: Technical Report by the Christchurch City Council, August 2011, Part 2 of 5, Page 81-117Report into Building Safety Evaluation in the Central Business District Following the 4 September 2010 Earthquake: Technical Report by the Christchurch City Council, August 2011, Part 2 of 5, Page 81-117
                  Christchurch City Council
                  Technical Report
                  Placarding (Stickering)
                  2012-06-25-15- 39-0425 June 2012CTV Building hearing: CTV Building Collapse Investigation Report by Dr Clark Hyland and Ashley Smith, January 2012CTV Building hearing: CTV Building Collapse Investigation Report by Dr Clark Hyland and Ashley Smith, January 2012
                  • Hyland Consultants Ltd
                  • Hyland, Clark
                  • Smith, Ashley
                  • Structure Smith Consulting Engineers
                    Technical Report
                    Buildings - Representative Sample
                    Madras 249
                  2012-10-25-14- 46-4625 October 2012Independent Assessment on Earthquake Performance of Craigs Investment Partners House - 90 Armagh Street: Report prepared by Peter Smith and Jonathan Devine of Spencer Holmes Limited, February 2012Independent Assessment on Earthquake Performance of Craigs Investment Partners House - 90 Armagh Street: Report prepared by Peter Smith and Jonathan Devine of Spencer Holmes Limited, February 2012
                  • Devine, Jonathan
                  • Smith, Peter
                  • Spencer Holmes Ltd
                    Technical Report
                    Buildings - Representative Sample
                    Armagh 90
                  2011-10-21-14- 08-5121 October 2011System of Building Controls - Appendix A, Section 3: Development of structural design and standards - Overview timeline of standards relating to determination of loads and methods of determining loads: Technical report compiled by Standards New Zealand, August 2011System of Building Controls - Appendix A, Section 3: Development of structural design and standards - Overview timeline of standards relating to determination of loads and methods of determining loads: Technical report compiled by Standards New Zealand, August 2011
                  • Department of Building and Housing
                  • Standards New Zealand
                    Technical Report
                    Standards and Regulation
                    2011-11-07-14- 27-1107 November 2011Report into Building Safety Evaluation in the Central Business District Following the 4 September 2010 Earthquake: Technical Report by the Christchurch City Council, August 2011, Part 1 of 5, Page 1-80Report into Building Safety Evaluation in the Central Business District Following the 4 September 2010 Earthquake: Technical Report by the Christchurch City Council, August 2011, Part 1 of 5, Page 1-80
                      Christchurch City Council
                      Technical Report
                      Placarding (Stickering)
                      2012-10-26-16- 15-1826 October 2012Detailed Engineering Evaluation of Christchurch Women's Hospital provided to the Royal Commission by Holmes Consulting Group in May 2012Detailed Engineering Evaluation of Christchurch Women's Hospital provided to the Royal Commission by Holmes Consulting Group in May 2012
                        Holmes Consulting Group
                        Technical Report
                        Buildings - Representative Sample
                        Riccarton Ave 2
                      2012-10-26-12- 23-2926 October 2012Independent Assessment on Earthquake Performance of Gallery Apartments - 62 Gloucester Street: Report by Peter Smith and Vaughan England of Spencer Holmes Limited, February 2012Independent Assessment on Earthquake Performance of Gallery Apartments - 62 Gloucester Street: Report by Peter Smith and Vaughan England of Spencer Holmes Limited, February 2012
                      • Smith, Peter
                      • Spencer Holmes Ltd
                        Technical Report
                        Buildings - Representative Sample
                        Gloucester 62
                      2012-01-17-15- 43-1517 January 2012Hotel Grand Chancellor hearing: Report on the Structural Performance of the Hotel Grand Chancellor in the Earthquake of 22 February 2011Hotel Grand Chancellor hearing: Report on the Structural Performance of the Hotel Grand Chancellor in the Earthquake of 22 February 2011
                        Dunning Thornton Consultants Ltd
                        Technical Report
                      • Buildings - Representative Sample
                      • Structural Performance
                        Cashel 161
                      2011-10-21-13- 23-1421 October 2011System of Building Controls - Regulation of the Engineering Profession - Chartered Professional Engineers of New Zealand Act 2002 and Rules (no 2) 2002: Technical Report by New Zealand Cabinet, October 2006System of Building Controls - Regulation of the Engineering Profession - Chartered Professional Engineers of New Zealand Act 2002 and Rules (no 2) 2002: Technical Report by New Zealand Cabinet, October 2006
                      • Department of Building and Housing
                      • New Zealand Cabinet
                        Technical Report
                      • Standards and Regulation
                      • Training and Education
                        2011-11-03-16- 06-0303 November 2011Performance of Unreinforced Masonry Buildings in the 2010/2011 Canterbury Earthquake Swarm: Peer Review by Bret Lizundia, September 2011Performance of Unreinforced Masonry Buildings in the 2010/2011 Canterbury Earthquake Swarm: Peer Review by Bret Lizundia, September 2011
                        • Lizundia, Bret
                        • Rutherford & Chekene
                          Technical Report
                          Unreinforced Masonry Buildings (URM)
                          2011-12-02-15- 26-4302 December 2011Standards and Regulation for Building Construction in New Zealand by the Institution of Professional Engineers New Zealand, August 2011Standards and Regulation for Building Construction in New Zealand by the Institution of Professional Engineers New Zealand, August 2011
                            Institution of Professional Engineers New Zealand (IPENZ)
                            Technical Report
                            Standards and Regulation
                            2011-11-28-16- 20-1128 November 2011Building Safety Evaluation Following the Canterbury Earthquakes: Technical report by the New Zealand Society for Earthquake Engineering, September 2011Building Safety Evaluation Following the Canterbury Earthquakes: Technical report by the New Zealand Society for Earthquake Engineering, September 2011
                            • Brunsdon, Dave
                            • New Zealand Society for Earthquake Engineering
                              Technical Report
                            • Building Failure
                            • Safety Evaluation
                              2012-10-26-11- 59-4526 October 2012Independent Assessment on Earthquake Performance of Bedford Row car park building - 20 Bedford Row: Report by Peter Smith and Jonathan Devine of Spencer Holmes Limited, January 2012Independent Assessment on Earthquake Performance of Bedford Row car park building - 20 Bedford Row: Report by Peter Smith and Jonathan Devine of Spencer Holmes Limited, January 2012
                              • Devine, Jonathan
                              • Smith, Peter
                              • Spencer Holmes Ltd
                                Technical Report
                                Buildings - Representative Sample
                                Bedford 20

                              Search results navigation

                              Displaying 138 - 157 of 1356 items arrow left First arrow left Prev arrow right Next arrow right Last