Canterbury Earthquakes Royal Commission Te Komihana Rūwhenua o Waitaha Canterbury Earthquakes Royal Commission – Te Komihana Rūwhenua o Waitaha

Those who lost relatives and friends in the 22 February earthquake can be assured that there will be a very thorough inquiry into the failure of buildings that resulted in loss of life.
Chair, Justice Mark Cooper

Document library

Document categories

Additional filter options

Choose 1 or more filters then press 'Apply filter'
Reset

Search results

Published No sorted Title Not sorted Author(s) Not sorted Category Sorted ascending Subject(s) Not sorted Building(s) Not sorted Action
2011-10-21-14- 08-5121 October 2011System of Building Controls - Appendix A, Section 3: Development of structural design and standards - Overview timeline of standards relating to determination of loads and methods of determining loads: Technical report compiled by Standards New Zealand, August 2011System of Building Controls - Appendix A, Section 3: Development of structural design and standards - Overview timeline of standards relating to determination of loads and methods of determining loads: Technical report compiled by Standards New Zealand, August 2011
  • Department of Building and Housing
  • Standards New Zealand
    Technical Report
    Standards and Regulation
    2011-11-07-14- 27-1107 November 2011Report into Building Safety Evaluation in the Central Business District Following the 4 September 2010 Earthquake: Technical Report by the Christchurch City Council, August 2011, Part 1 of 5, Page 1-80Report into Building Safety Evaluation in the Central Business District Following the 4 September 2010 Earthquake: Technical Report by the Christchurch City Council, August 2011, Part 1 of 5, Page 1-80
      Christchurch City Council
      Technical Report
      Placarding (Stickering)
      2012-10-26-16- 15-1826 October 2012Detailed Engineering Evaluation of Christchurch Women's Hospital provided to the Royal Commission by Holmes Consulting Group in May 2012Detailed Engineering Evaluation of Christchurch Women's Hospital provided to the Royal Commission by Holmes Consulting Group in May 2012
        Holmes Consulting Group
        Technical Report
        Buildings - Representative Sample
        Riccarton Ave 2
      2012-10-26-12- 23-2926 October 2012Independent Assessment on Earthquake Performance of Gallery Apartments - 62 Gloucester Street: Report by Peter Smith and Vaughan England of Spencer Holmes Limited, February 2012Independent Assessment on Earthquake Performance of Gallery Apartments - 62 Gloucester Street: Report by Peter Smith and Vaughan England of Spencer Holmes Limited, February 2012
      • Smith, Peter
      • Spencer Holmes Ltd
        Technical Report
        Buildings - Representative Sample
        Gloucester 62
      2012-01-17-15- 43-1517 January 2012Hotel Grand Chancellor hearing: Report on the Structural Performance of the Hotel Grand Chancellor in the Earthquake of 22 February 2011Hotel Grand Chancellor hearing: Report on the Structural Performance of the Hotel Grand Chancellor in the Earthquake of 22 February 2011
        Dunning Thornton Consultants Ltd
        Technical Report
      • Buildings - Representative Sample
      • Structural Performance
        Cashel 161
      2011-10-21-13- 23-1421 October 2011System of Building Controls - Regulation of the Engineering Profession - Chartered Professional Engineers of New Zealand Act 2002 and Rules (no 2) 2002: Technical Report by New Zealand Cabinet, October 2006System of Building Controls - Regulation of the Engineering Profession - Chartered Professional Engineers of New Zealand Act 2002 and Rules (no 2) 2002: Technical Report by New Zealand Cabinet, October 2006
      • Department of Building and Housing
      • New Zealand Cabinet
        Technical Report
      • Standards and Regulation
      • Training and Education
        2011-11-03-16- 06-0303 November 2011Performance of Unreinforced Masonry Buildings in the 2010/2011 Canterbury Earthquake Swarm: Peer Review by Bret Lizundia, September 2011Performance of Unreinforced Masonry Buildings in the 2010/2011 Canterbury Earthquake Swarm: Peer Review by Bret Lizundia, September 2011
        • Lizundia, Bret
        • Rutherford & Chekene
          Technical Report
          Unreinforced Masonry Buildings (URM)
          2011-12-02-15- 26-4302 December 2011Standards and Regulation for Building Construction in New Zealand by the Institution of Professional Engineers New Zealand, August 2011Standards and Regulation for Building Construction in New Zealand by the Institution of Professional Engineers New Zealand, August 2011
            Institution of Professional Engineers New Zealand (IPENZ)
            Technical Report
            Standards and Regulation
            2011-11-28-16- 20-1128 November 2011Building Safety Evaluation Following the Canterbury Earthquakes: Technical report by the New Zealand Society for Earthquake Engineering, September 2011Building Safety Evaluation Following the Canterbury Earthquakes: Technical report by the New Zealand Society for Earthquake Engineering, September 2011
            • Brunsdon, Dave
            • New Zealand Society for Earthquake Engineering
              Technical Report
            • Building Failure
            • Safety Evaluation
              2012-10-26-11- 59-4526 October 2012Independent Assessment on Earthquake Performance of Bedford Row car park building - 20 Bedford Row: Report by Peter Smith and Jonathan Devine of Spencer Holmes Limited, January 2012Independent Assessment on Earthquake Performance of Bedford Row car park building - 20 Bedford Row: Report by Peter Smith and Jonathan Devine of Spencer Holmes Limited, January 2012
              • Devine, Jonathan
              • Smith, Peter
              • Spencer Holmes Ltd
                Technical Report
                Buildings - Representative Sample
                Bedford 20
              2011-11-07-14- 24-3007 November 2011Report into Building Safety Evaluation Processes in the Central Business District Following the 4 September 2010 Earthquake: Technical Report by the Christchurch City Council, August 2011Report into Building Safety Evaluation Processes in the Central Business District Following the 4 September 2010 Earthquake: Technical Report by the Christchurch City Council, August 2011
                Christchurch City Council
                Technical Report
                Placarding (Stickering)
                2012-10-26-14- 47-0126 October 2012Seismic Performance Investigation Draft Report of Clarendon Tower - 78 Worcester Street: Report by Bill Holmes and Reid Zimmerman of Rutherford & Chekene, February 2012Seismic Performance Investigation Draft Report of Clarendon Tower - 78 Worcester Street: Report by Bill Holmes and Reid Zimmerman of Rutherford & Chekene, February 2012
                • Holmes, William T
                • Rutherford & Chekene
                • Zimmerman, Reid
                  Technical Report
                  Buildings - Representative Sample
                  Worcester 78
                2011-10-21-14- 29-0521 October 2011System of Building Controls - Appendix A, Section 4: Building Act tools for the upgrading of the structural performance of buildings - references and appendices for assessment and improvement of the structural performance of buildings in earthquakes: Technical report by New Zealand Cabinet, June 2006System of Building Controls - Appendix A, Section 4: Building Act tools for the upgrading of the structural performance of buildings - references and appendices for assessment and improvement of the structural performance of buildings in earthquakes: Technical report by New Zealand Cabinet, June 2006
                • Department of Building and Housing
                • New Zealand Cabinet
                  Technical Report
                  Standards and Regulation
                  2012-10-26-12- 16-2826 October 2012Independent Assessment on Earthquake Performance of 151 Worcester Street: Report by Peter Smith and Jonathan Devine of Spencer Holmes Limited, December 2011Independent Assessment on Earthquake Performance of 151 Worcester Street: Report by Peter Smith and Jonathan Devine of Spencer Holmes Limited, December 2011
                  • Devine, Jonathan
                  • Smith, Peter
                  • Spencer Holmes Ltd
                    Technical Report
                    Buildings - Representative Sample
                    Worcester 151
                  2011-11-03-16- 05-2703 November 2011The Performance of Earthquake Strengthened URM Buildings in the Christchurch CBD in the 22 February 2011 Earthquake: Addendum Report by Associate Professor Jason M. Ingham and Professor Michael C. Griffith, October 2011The Performance of Earthquake Strengthened URM Buildings in the Christchurch CBD in the 22 February 2011 Earthquake: Addendum Report by Associate Professor Jason M. Ingham and Professor Michael C. Griffith, October 2011
                  • Griffith, Michael C
                  • Ingham, Jason M
                  • University of Auckland
                    Technical Report
                    Unreinforced Masonry Buildings (URM)
                    2012-03-12-13- 10-0812 March 2012Historical Review of Masonry Standards in New Zealand: Technical report prepared by Peter C Smith and Jonathan W Devine of Spencer Holmes Ltd, August 2011 Historical Review of Masonry Standards in New Zealand: Technical report prepared by Peter C Smith and Jonathan W Devine of Spencer Holmes Ltd, August 2011
                    • Devine, Jonathan
                    • Smith, Peter
                    • Spencer Holmes Ltd
                      Technical Report
                    • Standards and Regulation
                    • Unreinforced Masonry Buildings (URM)
                      2012-11-27-16- 30-3527 November 2012New Zealand Building Code Handbook Third Edition by the Department of Building and HousingNew Zealand Building Code Handbook Third Edition by the Department of Building and Housing
                        Department of Building and Housing
                        Technical Report
                      • Standards and Regulation
                      • Unreinforced Masonry Buildings (URM)
                        2011-10-21-11- 33-0721 October 2011Z-factor Graph: Technical Report by GNS Science, October 2011Z-factor Graph: Technical Report by GNS Science, October 2011
                        • GNS Science
                        • Webb, T H (Terry)
                          Technical Report
                          Seismicity
                          2011-11-07-14- 28-1507 November 2011Report into Building Safety Evaluation in the Central Business District Following the 4 September 2010 Earthquake: Technical Report by the Christchurch City Council, August 2011, Part 3 of 5, Page 118 -146Report into Building Safety Evaluation in the Central Business District Following the 4 September 2010 Earthquake: Technical Report by the Christchurch City Council, August 2011, Part 3 of 5, Page 118 -146
                            Christchurch City Council
                            Technical Report
                            Placarding (Stickering)
                            2011-10-21-13- 21-3721 October 2011Canterbury Earthquake Sequence and Implications for Seismic Design Levels: Peer Review by Professor Norman Abrahamson, July 2011Canterbury Earthquake Sequence and Implications for Seismic Design Levels: Peer Review by Professor Norman Abrahamson, July 2011
                              Abrahamson, Norman
                              Technical Report
                              Seismicity

                              Search results navigation

                              Displaying 1210 - 1229 of 1356 items arrow left First arrow left Prev arrow right Next arrow right Last