Canterbury Earthquakes Royal Commission Te Komihana Rūwhenua o Waitaha Canterbury Earthquakes Royal Commission – Te Komihana Rūwhenua o Waitaha

Those who lost relatives and friends in the 22 February earthquake can be assured that there will be a very thorough inquiry into the failure of buildings that resulted in loss of life.
Chair, Justice Mark Cooper

Document library

Document categories

Additional filter options

Choose 1 or more filters then press 'Apply filter'
Reset

Search results

Published No sorted Title Not sorted Author(s) Not sorted Category Not sorted Subject(s) Sorted ascending Building(s) Not sorted Action
2012-02-03-08- 41-2503 February 2012Education of Structural and Geotechnical Engineers at the University of Canterbury: Report by Professor Andy Buchanan and Associate Professor Roger Nokes, August 2011Education of Structural and Geotechnical Engineers at the University of Canterbury: Report by Professor Andy Buchanan and Associate Professor Roger Nokes, August 2011
    University of Canterbury
    Submission,Technical Report
    Training and Education
    2011-11-02-12- 48-1102 November 2011Structural and Geotechnical Engineering Education: Submission by Faculty of Engineering, University of Auckland, August 2011Structural and Geotechnical Engineering Education: Submission by Faculty of Engineering, University of Auckland, August 2011
    • Davies, Michael C R
    • Pender, Michael
    • Quenneville, Pierre
      Submission,Technical Report
      Training and Education
      2011-11-09-13- 54-1209 November 2011Photos of the Mt Eden Road Shopping Centre, Auckland supplied by Joe Arts - full sized slidesPhotos of the Mt Eden Road Shopping Centre, Auckland supplied by Joe Arts - full sized slides
        Arts, Joe
        Exhibit
        Unreinforced Masonry Buildings (URM)
        2012-02-27-13- 51-3227 February 2012Additional Christchurch City Council submissions on legal requirements for earthquake-prone buildings and related matters (issues 3(b) to 3(d) Additional Christchurch City Council submissions on legal requirements for earthquake-prone buildings and related matters (issues 3(b) to 3(d)
          Christchurch City Council
          Submission
          Unreinforced Masonry Buildings (URM)
          2011-11-03-16- 05-4003 November 2011Performance of Unreinforced Masonry in the 2010/2011 Canterbury Earthquake Swarm: Technical Report by Associate Professor Jason M Ingham and Professor Michael C Griffith, August 2011Performance of Unreinforced Masonry in the 2010/2011 Canterbury Earthquake Swarm: Technical Report by Associate Professor Jason M Ingham and Professor Michael C Griffith, August 2011
          • Griffith, Michael C
          • Ingham, Jason M
            Technical Report
            Unreinforced Masonry Buildings (URM)
            2011-10-21-14- 25-0921 October 2011Performance of Unreinforced Masonry in the 2010/2011 Canterbury Earthquake Swarm: Peer Review by Fred Turner, August 2011Performance of Unreinforced Masonry in the 2010/2011 Canterbury Earthquake Swarm: Peer Review by Fred Turner, August 2011
              Turner, Fred
              Technical Report
              Unreinforced Masonry Buildings (URM)
              2011-10-27-16- 52-3627 October 2011Unreinforced masonry and other earthquake prone buildings - Requirements for seismic strengthening: Submission by Joe Arts, October 2011Unreinforced masonry and other earthquake prone buildings - Requirements for seismic strengthening: Submission by Joe Arts, October 2011
                Arts, Joe
                Exhibit,Submission
                Unreinforced Masonry Buildings (URM)
                High 137-139
              2011-11-14-14- 28-5214 November 2011Benson Chen Holdings Ltd application for building consent for 605 Colombo StreetBenson Chen Holdings Ltd application for building consent for 605 Colombo Street
                Christchurch City Council
                Exhibit
                Unreinforced Masonry Buildings (URM)
                Colombo 605
              2011-11-07-15- 52-2307 November 2011Performance of Unreinforced Masonry Buildings in the 2010/2011 Canterbury Earthquakes Part 1: Presentation by Jason Ingham, University of Auckland, November 2011Performance of Unreinforced Masonry Buildings in the 2010/2011 Canterbury Earthquakes Part 1: Presentation by Jason Ingham, University of Auckland, November 2011
                Ingham, Jason M
                Exhibit
                Unreinforced Masonry Buildings (URM)
                2011-11-07-15- 53-3707 November 2011Performance of Unreinforced Masonry Buildings in the 2010/2011 Canterbury Earthquakes - Part 3: Presentation by Jason Ingham, University of Auckland, November 2011Performance of Unreinforced Masonry Buildings in the 2010/2011 Canterbury Earthquakes - Part 3: Presentation by Jason Ingham, University of Auckland, November 2011
                  Ingham, Jason M
                  Exhibit
                  Unreinforced Masonry Buildings (URM)
                  2011-11-07-16- 02-0807 November 2011Performance of Unreinforced Masonry Buildings in the 2010/2011 Canterbury Earthquakes - Part 2: Presentation by Jason Ingham, University of Auckland, November 2011Performance of Unreinforced Masonry Buildings in the 2010/2011 Canterbury Earthquakes - Part 2: Presentation by Jason Ingham, University of Auckland, November 2011
                    Ingham, Jason M
                    Exhibit
                    Unreinforced Masonry Buildings (URM)
                    2011-11-07-15- 54-3107 November 2011Performance of Unreinforced Masonry Buildings in the 2010/2011 Canterbury Earthquakes - Part 4: Presentation by Jason Ingham, University of Auckland, November 2011Performance of Unreinforced Masonry Buildings in the 2010/2011 Canterbury Earthquakes - Part 4: Presentation by Jason Ingham, University of Auckland, November 2011
                      Ingham, Jason M
                      Exhibit
                      Unreinforced Masonry Buildings (URM)
                      2011-11-07-15- 55-2707 November 2011Performance of Unreinforced Masonry Buildings in the 2010/2011 Canterbury Earthquakes - Part 5: Presentation by Jason Ingham, University of Auckland, November 2011Performance of Unreinforced Masonry Buildings in the 2010/2011 Canterbury Earthquakes - Part 5: Presentation by Jason Ingham, University of Auckland, November 2011
                        Ingham, Jason M
                        Exhibit
                        Unreinforced Masonry Buildings (URM)
                        2011-11-09-11- 59-1309 November 2011Statement of Evidence from Daniel Steven Newman of Property Council New Zealand to the Canterbury Earthquakes Royal CommissionStatement of Evidence from Daniel Steven Newman of Property Council New Zealand to the Canterbury Earthquakes Royal Commission
                          Newman, Daniel
                          Exhibit
                          Unreinforced Masonry Buildings (URM)
                          2011-11-03-16- 06-0303 November 2011Performance of Unreinforced Masonry Buildings in the 2010/2011 Canterbury Earthquake Swarm: Peer Review by Bret Lizundia, September 2011Performance of Unreinforced Masonry Buildings in the 2010/2011 Canterbury Earthquake Swarm: Peer Review by Bret Lizundia, September 2011
                          • Lizundia, Bret
                          • Rutherford & Chekene
                            Technical Report
                            Unreinforced Masonry Buildings (URM)
                            2012-04-05-14- 02-2405 April 2012Heritage Buildings, Earthquake Strengthening and Damage: The Canterbury Earthquakes September 2010-January 2012: Technical report by Robert McClean and NZHPTHeritage Buildings, Earthquake Strengthening and Damage: The Canterbury Earthquakes September 2010-January 2012: Technical report by Robert McClean and NZHPT
                              New Zealand Historic Places Trust
                              Technical Report
                              Unreinforced Masonry Buildings (URM)
                              2011-11-15-09- 17-0315 November 20112011-11-07 Unreinforced Masonry (URM) Buildings and Earthquake-Prone Policies hearing transcript2011-11-07 Unreinforced Masonry (URM) Buildings and Earthquake-Prone Policies hearing transcript
                              • Chapman, Bruce
                              • Ingham, Jason M
                                Transcript
                                Unreinforced Masonry Buildings (URM)
                                2011-11-15-09- 08-4015 November 20112011-11-08 Unreinforced Masonry (URM) Buildings and Earthquake-Prone Policies hearing transcript2011-11-08 Unreinforced Masonry (URM) Buildings and Earthquake-Prone Policies hearing transcript
                                • Ingham, Jason M
                                • Lizundia, Bret
                                • Turner, Fred
                                  Transcript
                                  Unreinforced Masonry Buildings (URM)
                                  2011-11-15-09- 07-5115 November 20112011-11-09 Unreinforced Masonry (URM) Buildings and Earthquake-Prone Policies hearing transcript2011-11-09 Unreinforced Masonry (URM) Buildings and Earthquake-Prone Policies hearing transcript
                                    Speakers - Various
                                    Transcript
                                    Unreinforced Masonry Buildings (URM)
                                    2011-11-03-16- 05-2703 November 2011The Performance of Earthquake Strengthened URM Buildings in the Christchurch CBD in the 22 February 2011 Earthquake: Addendum Report by Associate Professor Jason M. Ingham and Professor Michael C. Griffith, October 2011The Performance of Earthquake Strengthened URM Buildings in the Christchurch CBD in the 22 February 2011 Earthquake: Addendum Report by Associate Professor Jason M. Ingham and Professor Michael C. Griffith, October 2011
                                    • Griffith, Michael C
                                    • Ingham, Jason M
                                    • University of Auckland
                                      Technical Report
                                      Unreinforced Masonry Buildings (URM)

                                      Search results navigation

                                      Displaying 1028 - 1047 of 1356 items arrow left First arrow left Prev arrow right Next arrow right Last