Search results

Published No sorted Title Not sorted Author(s) Not sorted Category Not sorted Subject(s) Not sorted Building(s) Sorted ascending Action
2011-11-0707 November 2011Report into Building Safety Evaluation in the Central Business District Following the 4 September 2010 Earthquake: Technical Report by the Christchurch City Council, August 2011, Part 1 of 5, Page 1-80Report into Building Safety Evaluation in the Central Business District Following the 4 September 2010 Earthquake: Technical Report by the Christchurch City Council, August 2011, Part 1 of 5, Page 1-80
    Christchurch City Council
    Technical Report
    Placarding (Stickering)
    2011-10-2121 October 2011System of Building Controls - Regulation of the Engineering Profession - Chartered Professional Engineers of New Zealand Act 2002 and Rules (no 2) 2002: Technical Report by New Zealand Cabinet, October 2006System of Building Controls - Regulation of the Engineering Profession - Chartered Professional Engineers of New Zealand Act 2002 and Rules (no 2) 2002: Technical Report by New Zealand Cabinet, October 2006
    • Department of Building and Housing
    • New Zealand Cabinet
      Technical Report
    • Standards and Regulation
    • Training and Education
      2011-11-0303 November 2011Performance of Unreinforced Masonry Buildings in the 2010/2011 Canterbury Earthquake Swarm: Peer Review by Bret Lizundia, September 2011Performance of Unreinforced Masonry Buildings in the 2010/2011 Canterbury Earthquake Swarm: Peer Review by Bret Lizundia, September 2011
      • Lizundia, Bret
      • Rutherford & Chekene
        Technical Report
        Unreinforced Masonry Buildings (URM)
        2011-12-0202 December 2011Standards and Regulation for Building Construction in New Zealand by the Institution of Professional Engineers New Zealand, August 2011Standards and Regulation for Building Construction in New Zealand by the Institution of Professional Engineers New Zealand, August 2011
          Institution of Professional Engineers New Zealand (IPENZ)
        • Referenced Document
        • Submission
        • Technical Report
          Standards and Regulation
          2011-11-2828 November 2011Building Safety Evaluation Following the Canterbury Earthquakes: Technical report by the New Zealand Society for Earthquake Engineering, September 2011Building Safety Evaluation Following the Canterbury Earthquakes: Technical report by the New Zealand Society for Earthquake Engineering, September 2011
          • Brunsdon, Dave
          • New Zealand Society for Earthquake Engineering
          • Exhibit
          • Technical Report
          • Building Failure
          • Safety Evaluation
            2011-11-0707 November 2011Report into Building Safety Evaluation Processes in the Central Business District Following the 4 September 2010 Earthquake: Technical Report by the Christchurch City Council, August 2011Report into Building Safety Evaluation Processes in the Central Business District Following the 4 September 2010 Earthquake: Technical Report by the Christchurch City Council, August 2011
              Christchurch City Council
              Technical Report
              Placarding (Stickering)
              2011-10-2121 October 2011System of Building Controls - Appendix A, Section 4: Building Act tools for the upgrading of the structural performance of buildings - references and appendices for assessment and improvement of the structural performance of buildings in earthquakes: Technical report by New Zealand Cabinet, June 2006System of Building Controls - Appendix A, Section 4: Building Act tools for the upgrading of the structural performance of buildings - references and appendices for assessment and improvement of the structural performance of buildings in earthquakes: Technical report by New Zealand Cabinet, June 2006
              • Department of Building and Housing
              • New Zealand Cabinet
                Technical Report
                Standards and Regulation
                2011-11-0303 November 2011The Performance of Earthquake Strengthened URM Buildings in the Christchurch CBD in the 22 February 2011 Earthquake: Addendum Report by Associate Professor Jason M. Ingham and Professor Michael C. Griffith, October 2011The Performance of Earthquake Strengthened URM Buildings in the Christchurch CBD in the 22 February 2011 Earthquake: Addendum Report by Associate Professor Jason M. Ingham and Professor Michael C. Griffith, October 2011
                • Griffith, Michael C
                • Ingham, Jason M
                • University of Auckland
                  Technical Report
                  Unreinforced Masonry Buildings (URM)
                  2012-03-1212 March 2012Historical Review of Masonry Standards in New Zealand: Technical report prepared by Peter C Smith and Jonathan W Devine of Spencer Holmes Ltd, August 2011 Historical Review of Masonry Standards in New Zealand: Technical report prepared by Peter C Smith and Jonathan W Devine of Spencer Holmes Ltd, August 2011
                  • Devine, Jonathan
                  • Smith, Peter
                  • Spencer Holmes Ltd
                    Technical Report
                  • Standards and Regulation
                  • Unreinforced Masonry Buildings (URM)
                    2012-11-2727 November 2012New Zealand Building Code Handbook Third Edition by the Department of Building and HousingNew Zealand Building Code Handbook Third Edition by the Department of Building and Housing
                      Department of Building and Housing
                    • Referenced Document
                    • Technical Report
                    • Standards and Regulation
                    • Unreinforced Masonry Buildings (URM)
                      2011-10-2121 October 2011Z-factor Graph: Technical Report by GNS Science, October 2011Z-factor Graph: Technical Report by GNS Science, October 2011
                      • GNS Science
                      • Webb, T H (Terry)
                      • Exhibit
                      • Technical Report
                        Seismicity
                        2011-11-0707 November 2011Report into Building Safety Evaluation in the Central Business District Following the 4 September 2010 Earthquake: Technical Report by the Christchurch City Council, August 2011, Part 3 of 5, Page 118 -146Report into Building Safety Evaluation in the Central Business District Following the 4 September 2010 Earthquake: Technical Report by the Christchurch City Council, August 2011, Part 3 of 5, Page 118 -146
                          Christchurch City Council
                          Technical Report
                          Placarding (Stickering)
                          2011-10-2121 October 2011Canterbury Earthquake Sequence and Implications for Seismic Design Levels: Peer Review by Professor Norman Abrahamson, July 2011Canterbury Earthquake Sequence and Implications for Seismic Design Levels: Peer Review by Professor Norman Abrahamson, July 2011
                            Abrahamson, Norman
                            Technical Report
                            Seismicity
                            2011-11-0202 November 2011Letter from David Nummy of Unitec to the Royal Commission regarding engineering qualificationsLetter from David Nummy of Unitec to the Royal Commission regarding engineering qualifications
                            • Nummy, David
                            • Unitec
                            • Submission
                            • Technical Report
                              Engineering
                              2011-10-2121 October 2011Foundations on Deep Alluvial Soils: Summary by Canterbury Earthquakes Royal Commission, August 2011Foundations on Deep Alluvial Soils: Summary by Canterbury Earthquakes Royal Commission, August 2011
                                Canterbury Earthquakes Royal Commission
                                Technical Report
                                Geotechnical
                                2011-11-0707 November 2011Report into Building Safety Evaluation in the Central Business District Following the 4 September 2010 Earthquake: Technical Report by the Christchurch City Council, August 2011, Part 4 of 5, Page 147-170Report into Building Safety Evaluation in the Central Business District Following the 4 September 2010 Earthquake: Technical Report by the Christchurch City Council, August 2011, Part 4 of 5, Page 147-170
                                  Christchurch City Council
                                  Technical Report
                                  Placarding (Stickering)
                                  2011-10-2121 October 2011Canterbury Earthquake Sequence and Implications for Seismic Design Levels: Technical Report compiled by Dr Terry Webb of GNS Science, July 2011Canterbury Earthquake Sequence and Implications for Seismic Design Levels: Technical Report compiled by Dr Terry Webb of GNS Science, July 2011
                                  • GNS Science
                                  • Webb, T H (Terry)
                                    Technical Report
                                    Seismicity
                                    2011-11-0707 November 2011Independent Review of the Response to the Canterbury Earthquake, 4 September 2010: Technical report commissioned by Ministry of Civil Defence & Emergency Management, May 2011Independent Review of the Response to the Canterbury Earthquake, 4 September 2010: Technical report commissioned by Ministry of Civil Defence & Emergency Management, May 2011
                                    • Middleton, David
                                    • Westlake, Richard
                                      Technical Report
                                    • Building assessments after earthquakes
                                    • Christchurch Recovery
                                    • Civil Defence
                                    • Emergency Powers and Procedures
                                    • Placarding (Stickering)
                                    • Safety Evaluation
                                      2011-11-0303 November 2011Performance of Unreinforced Masonry Buildings in the 2010/2011 Canterbury Earthquake Swarm: Peer Review by Fred Turner, September 2011Performance of Unreinforced Masonry Buildings in the 2010/2011 Canterbury Earthquake Swarm: Peer Review by Fred Turner, September 2011
                                        Turner, Fred
                                        Technical Report
                                        Unreinforced Masonry Buildings (URM)
                                        2011-11-0202 November 2011Canterbury Earthquakes Royal Commission summary of the IPENZ report 'Standards and Regulation for Building Construction in New Zealand'Canterbury Earthquakes Royal Commission summary of the IPENZ report 'Standards and Regulation for Building Construction in New Zealand'
                                          Canterbury Earthquakes Royal Commission
                                          Technical Report
                                          Standards and Regulation

                                          Search results navigation