Canterbury Earthquakes Royal Commission Te Komihana Rūwhenua o Waitaha Canterbury Earthquakes Royal Commission – Te Komihana Rūwhenua o Waitaha

Those who lost relatives and friends in the 22 February earthquake can be assured that there will be a very thorough inquiry into the failure of buildings that resulted in loss of life.
Chair, Justice Mark Cooper

Document library

Document categories

Additional filter options

Choose 1 or more filters then press 'Apply filter'
Reset

Search results

Published Title Author(s) Sorted descending Category Not sorted Subject(s) Not sorted Building(s) Not sorted Action
2011-10-2121 October 2011System of Building Controls - Appendix A, Section 2: The building regulatory system - Performance-based building regulatory systems: Principles and experiences: Technical Report by Inter-Jurisdictional Regulatory Collaboration Committee, February 2010System of Building Controls - Appendix A, Section 2: The building regulatory system - Performance-based building regulatory systems: Principles and experiences: Technical Report by Inter-Jurisdictional Regulatory Collaboration Committee, February 2010
    Inter-jurisdictional Regulatory Collaboration Committee (IRCC)
    Technical Report
    Standards and Regulation
    2011-12-0202 December 2011Standards and Regulation for Building Construction in New Zealand by the Institution of Professional Engineers New Zealand, August 2011Standards and Regulation for Building Construction in New Zealand by the Institution of Professional Engineers New Zealand, August 2011
      Institution of Professional Engineers New Zealand (IPENZ)
    • Referenced Document
    • Submission
    • Technical Report
      Standards and Regulation
      2011-11-0303 November 2011Performance of Unreinforced Masonry in the 2010/2011 Canterbury Earthquake Swarm: Technical Report by Associate Professor Jason M Ingham and Professor Michael C Griffith, August 2011Performance of Unreinforced Masonry in the 2010/2011 Canterbury Earthquake Swarm: Technical Report by Associate Professor Jason M Ingham and Professor Michael C Griffith, August 2011
        Ingham, Jason M
        Technical Report
        Unreinforced Masonry Buildings (URM)
        2011-11-0303 November 2011The Performance of Earthquake Strengthened URM Buildings in the Christchurch CBD in the 22 February 2011 Earthquake: Addendum Report by Associate Professor Jason M. Ingham and Professor Michael C. Griffith, October 2011The Performance of Earthquake Strengthened URM Buildings in the Christchurch CBD in the 22 February 2011 Earthquake: Addendum Report by Associate Professor Jason M. Ingham and Professor Michael C. Griffith, October 2011
          Ingham, Jason M
          Technical Report
          Unreinforced Masonry Buildings (URM)
          2012-06-2525 June 2012CTV Building hearing: CTV Building Collapse Investigation Report by Dr Clark Hyland and Ashley Smith, January 2012CTV Building hearing: CTV Building Collapse Investigation Report by Dr Clark Hyland and Ashley Smith, January 2012
            Hyland, Clark
          • Exhibit
          • Technical Report
            Buildings - Representative Sample
            Madras 249
          2012-02-1414 February 2012CTV Building Collapse Investigation reports prepared for the Department of Building and Housing CTV Building Collapse Investigation reports prepared for the Department of Building and Housing
            Hyland Consultants Ltd
            Technical Report
          • Building Failure
          • Buildings - Representative Sample
            Madras 249
          2012-06-2525 June 2012CTV Building hearing: CTV Building Collapse Investigation Report by Dr Clark Hyland and Ashley Smith, January 2012CTV Building hearing: CTV Building Collapse Investigation Report by Dr Clark Hyland and Ashley Smith, January 2012
            Hyland Consultants Ltd
          • Exhibit
          • Technical Report
            Buildings - Representative Sample
            Madras 249
          2011-11-1515 November 2011Letter from the Department of Building and Housing about the Forsyth Barr building report, November 2011Letter from the Department of Building and Housing about the Forsyth Barr building report, November 2011
            Hopkins, David
            Technical Report
          • Buildings - Representative Sample
          • RFI and EOI
            Colombo 764
          2012-03-1212 March 2012Department of Building and Housing Technical Investigation Reports: Peer review by William Holmes, November 2011Department of Building and Housing Technical Investigation Reports: Peer review by William Holmes, November 2011
            Holmes, William T
          • Exhibit
          • Technical Report
          • Building Failure
          • Buildings - Representative Sample
          • Central Business District (CBD)
          • Cambridge 233
          • Cashel 161
          • Colombo 764
          2012-10-2626 October 2012Seismic Performance Investigation Draft Report of Clarendon Tower - 78 Worcester Street: Report by Bill Holmes and Reid Zimmerman of Rutherford & Chekene, February 2012Seismic Performance Investigation Draft Report of Clarendon Tower - 78 Worcester Street: Report by Bill Holmes and Reid Zimmerman of Rutherford & Chekene, February 2012
            Holmes, William T
            Technical Report
            Buildings - Representative Sample
            Worcester 78
          2012-09-1010 September 2012Materials Testing in Buildings of Interest - Gallery Apartments, Westpac Centre, IRD Building: Report prepared by Holmes Solutions, November 2011Materials Testing in Buildings of Interest - Gallery Apartments, Westpac Centre, IRD Building: Report prepared by Holmes Solutions, November 2011
            Holmes Solutions
            Technical Report
            Buildings - Representative Sample
          • Cashel 166
          • Cashel 224
          • Gloucester 62
          2011-10-2121 October 2011Stairs and Access Ramps Between Floors in Multi-Storey Buildings: Technical Report by Des Bull, August 2011Stairs and Access Ramps Between Floors in Multi-Storey Buildings: Technical Report by Des Bull, August 2011
            Holmes Consulting Group
            Technical Report
          • Engineering
          • Stairs and Floors
            2011-10-2121 October 2011Heritage earthquake prone building strengthening cost study: Technical report by John Hare of Holmes Consulting Group, June 2009Heritage earthquake prone building strengthening cost study: Technical report by John Hare of Holmes Consulting Group, June 2009
              Holmes Consulting Group
              Technical Report
            • Culture and Heritage
            • Engineering
              2012-10-2626 October 2012Detailed Engineering Evaluation of Christchurch Women's Hospital provided to the Royal Commission by Holmes Consulting Group in May 2012Detailed Engineering Evaluation of Christchurch Women's Hospital provided to the Royal Commission by Holmes Consulting Group in May 2012
                Holmes Consulting Group
                Technical Report
                Buildings - Representative Sample
                Riccarton Ave 2
              2011-10-2121 October 2011Heritage earthquake prone building strengthening cost study: Technical report by John Hare of Holmes Consulting Group, June 2009Heritage earthquake prone building strengthening cost study: Technical report by John Hare of Holmes Consulting Group, June 2009
                Hare, John
                Technical Report
              • Culture and Heritage
              • Engineering
                2011-11-0303 November 2011Performance of Unreinforced Masonry in the 2010/2011 Canterbury Earthquake Swarm: Technical Report by Associate Professor Jason M Ingham and Professor Michael C Griffith, August 2011Performance of Unreinforced Masonry in the 2010/2011 Canterbury Earthquake Swarm: Technical Report by Associate Professor Jason M Ingham and Professor Michael C Griffith, August 2011
                  Griffith, Michael C
                  Technical Report
                  Unreinforced Masonry Buildings (URM)
                  2011-11-0303 November 2011The Performance of Earthquake Strengthened URM Buildings in the Christchurch CBD in the 22 February 2011 Earthquake: Addendum Report by Associate Professor Jason M. Ingham and Professor Michael C. Griffith, October 2011The Performance of Earthquake Strengthened URM Buildings in the Christchurch CBD in the 22 February 2011 Earthquake: Addendum Report by Associate Professor Jason M. Ingham and Professor Michael C. Griffith, October 2011
                    Griffith, Michael C
                    Technical Report
                    Unreinforced Masonry Buildings (URM)
                    2011-11-0404 November 2011Building Evaluation Transition Team - Processes Used and Lessons Learnt Following the Darfield Earthquake of 4 September 2010: Technical Report by Esther Griffiths of Sisirc Consulting Limited and Deane McNulty of McNulty Engineering Management Limited, January 2011 Building Evaluation Transition Team - Processes Used and Lessons Learnt Following the Darfield Earthquake of 4 September 2010: Technical Report by Esther Griffiths of Sisirc Consulting Limited and Deane McNulty of McNulty Engineering Management Limited, January 2011
                      Griffiths, Esther
                      Technical Report
                      Christchurch Recovery
                      2011-10-2121 October 2011Probabilities of aftershocks and larger events for the 2010 Darfield earthquake based on average behaviour of New Zealand earthquakes: Technical Report by GNS Science, 2011Probabilities of aftershocks and larger events for the 2010 Darfield earthquake based on average behaviour of New Zealand earthquakes: Technical Report by GNS Science, 2011
                        GNS Science
                      • Exhibit
                      • Technical Report
                        Seismicity
                        2011-10-2121 October 2011Canterbury Earthquake Sequence and Implications for Seismic Design Levels: Technical Report compiled by Dr Terry Webb of GNS Science, July 2011Canterbury Earthquake Sequence and Implications for Seismic Design Levels: Technical Report compiled by Dr Terry Webb of GNS Science, July 2011
                          GNS Science
                          Technical Report
                          Seismicity

                          Search results navigation

                          Displaying 61 - 80 of 141 items arrow left First arrow left Prev arrow right Next arrow right Last