Canterbury Earthquakes Royal Commission Te Komihana Rūwhenua o Waitaha Canterbury Earthquakes Royal Commission – Te Komihana Rūwhenua o Waitaha

Those who lost relatives and friends in the 22 February earthquake can be assured that there will be a very thorough inquiry into the failure of buildings that resulted in loss of life.
Chair, Justice Mark Cooper

Document library

Document categories

Additional filter options

Choose 1 or more filters then press 'Apply filter'
Reset

Search results

Published No sorted Title Not sorted Author(s) Not sorted Category Not sorted Subject(s) Not sorted Building(s) Sorted descending Action
2012-09-12-17- 17-0912 September 20122012-09-10 Training and Education of Engineers hearing transcript2012-09-10 Training and Education of Engineers hearing transcript
    Speakers - Various
    Transcript
    Training and Education
    2012-03-12-12- 59-5912 March 20122011-10-19 Seismicity hearing transcript2011-10-19 Seismicity hearing transcript
    • Abrahamson, Norman
    • Berryman, K
    • McVerry, Graeme
      Transcript
    • Geotechnical
    • Seismicity
      2011-12-06-10- 53-2106 December 20112011-10-17 Seismicity hearing transcript2011-10-17 Seismicity hearing transcript
      • Hampton, Nigel
      • Webb, T H (Terry)
        Transcript
      • Geotechnical
      • Seismicity
        2011-12-01-13- 41-0501 December 20112011-11-14 Unreinforced Masonry (URM) Buildings and Earthquake-Prone Policies hearing transcript2011-11-14 Unreinforced Masonry (URM) Buildings and Earthquake-Prone Policies hearing transcript
          Speakers - Various
          Transcript
          Unreinforced Masonry Buildings (URM)
          2012-01-26-14- 51-3026 January 2012Drainage Scheme for Christchurch and the Suburbs by William Clark, 1878: Submission by Ken Sibly, September 2011Drainage Scheme for Christchurch and the Suburbs by William Clark, 1878: Submission by Ken Sibly, September 2011
            Clark, William
            Submission
            Geotechnical
            2011-11-03-16- 05-5003 November 2011Performance of Unreinforced Masonry Buildings in the 2010/2011 Canterbury Earthquake Swarm: Peer Review by Fred Turner, September 2011Performance of Unreinforced Masonry Buildings in the 2010/2011 Canterbury Earthquake Swarm: Peer Review by Fred Turner, September 2011
              Turner, Fred
              Technical Report
              Unreinforced Masonry Buildings (URM)
              2011-10-21-14- 08-5121 October 2011System of Building Controls - Appendix A, Section 3: Development of structural design and standards - Overview timeline of standards relating to determination of loads and methods of determining loads: Technical report compiled by Standards New Zealand, August 2011System of Building Controls - Appendix A, Section 3: Development of structural design and standards - Overview timeline of standards relating to determination of loads and methods of determining loads: Technical report compiled by Standards New Zealand, August 2011
              • Department of Building and Housing
              • Standards New Zealand
                Technical Report
                Standards and Regulation
                2011-10-21-14- 29-0521 October 2011System of Building Controls - Appendix A, Section 4: Building Act tools for the upgrading of the structural performance of buildings - references and appendices for assessment and improvement of the structural performance of buildings in earthquakes: Technical report by New Zealand Cabinet, June 2006System of Building Controls - Appendix A, Section 4: Building Act tools for the upgrading of the structural performance of buildings - references and appendices for assessment and improvement of the structural performance of buildings in earthquakes: Technical report by New Zealand Cabinet, June 2006
                • Department of Building and Housing
                • New Zealand Cabinet
                  Technical Report
                  Standards and Regulation
                  2012-03-12-13- 10-0812 March 2012Historical Review of Masonry Standards in New Zealand: Technical report prepared by Peter C Smith and Jonathan W Devine of Spencer Holmes Ltd, August 2011 Historical Review of Masonry Standards in New Zealand: Technical report prepared by Peter C Smith and Jonathan W Devine of Spencer Holmes Ltd, August 2011
                  • Devine, Jonathan
                  • Smith, Peter
                  • Spencer Holmes Ltd
                    Technical Report
                  • Standards and Regulation
                  • Unreinforced Masonry Buildings (URM)
                    2011-10-28-10- 50-1128 October 2011Canterbury Earthquakes - Scientific Answers to Critical Questions: Submission by The Royal Society of New Zealand, October 2011Canterbury Earthquakes - Scientific Answers to Critical Questions: Submission by The Royal Society of New Zealand, October 2011
                      The Royal Society of New Zealand
                      Submission
                      Seismicity
                      2012-09-04-16- 00-2204 September 2012Building Management after Earthquakes: Submission from Edward BlaikieBuilding Management after Earthquakes: Submission from Edward Blaikie
                        Blaikie, Edward L (Ted)
                        Submission
                      • Building assessments after earthquakes
                      • Placarding (Stickering)
                      • Safety Evaluation
                        2011-11-09-15- 40-4609 November 2011Earthquake-prone building provisions of the Building Act 2004: Policy guidance for Territorial AuthoritiesEarthquake-prone building provisions of the Building Act 2004: Policy guidance for Territorial Authorities
                          Department of Building and Housing
                          Exhibit
                        • Standards and Regulation
                        • Unreinforced Masonry Buildings (URM)
                          2011-10-19-17- 29-0219 October 2011Email from Matthew Gerstenberger to Dr Terry Webb regarding aftershock information for the Geonet websiteEmail from Matthew Gerstenberger to Dr Terry Webb regarding aftershock information for the Geonet website
                          • Gerstenberger, Matthew
                          • GNS Science
                            Exhibit
                            Seismicity
                            2011-10-28-11- 21-5428 October 2011Standards Council Submission (B) - Issue 3 of the Notice of IssuesStandards Council Submission (B) - Issue 3 of the Notice of Issues
                              Standards Council
                              Submission
                              Standards and Regulation
                              2011-11-15-09- 23-2215 November 20112011-10-17 Opening Address for The Commission of Inquiry from Counsel Assisting the Commission Stephen Mills, QC 2011-10-17 Opening Address for The Commission of Inquiry from Counsel Assisting the Commission Stephen Mills, QC
                              • Canterbury Earthquakes Royal Commission
                              • Mills, Stephen
                                Transcript
                                Opening Statement
                                2011-11-10-10- 12-0910 November 2011Letter from Kapiti Coast District Council about unreinforced masonry (URM) and earthquake-prone building policiesLetter from Kapiti Coast District Council about unreinforced masonry (URM) and earthquake-prone building policies
                                  Smith, Ken
                                  RFI Response
                                  Standards and Regulation
                                  2011-10-18-17- 34-4718 October 2011Structural Design Actions-Part 5 Earthquake Actions New Zealand from Standards New Zealand. Sec 2: Verification, Sec 3: Site Hazard SpectraStructural Design Actions-Part 5 Earthquake Actions New Zealand from Standards New Zealand. Sec 2: Verification, Sec 3: Site Hazard Spectra
                                    Standards New Zealand
                                    Exhibit
                                    Standards and Regulation
                                    2011-11-10-10- 02-3810 November 2011Letter from Opotiki District Council about unreinforced masonry (URM) and earthquake-prone building policiesLetter from Opotiki District Council about unreinforced masonry (URM) and earthquake-prone building policies
                                      Chapman, Stu
                                      RFI Response
                                      Standards and Regulation
                                      2011-11-10-10- 24-0110 November 2011Request for information response from Hastings District Council about unreinforced masonry (URM) and earthquake-prone building policiesRequest for information response from Hastings District Council about unreinforced masonry (URM) and earthquake-prone building policies
                                        Hastings District Council
                                        RFI Response
                                      • RFI and EOI
                                      • Unreinforced Masonry Buildings (URM)
                                        2011-11-10-10- 04-0910 November 2011Letter from Napier City Council about unreinforced masonry (URM) and earthquake-prone building policiesLetter from Napier City Council about unreinforced masonry (URM) and earthquake-prone building policies
                                        • Napier City Council
                                        • Taylor, Neil
                                          RFI Response
                                          Standards and Regulation

                                          Search results navigation

                                          Displaying 277 - 296 of 1517 items arrow left First arrow left Prev arrow right Next arrow right Last