Canterbury Earthquakes Royal Commission Te Komihana Rūwhenua o Waitaha Canterbury Earthquakes Royal Commission – Te Komihana Rūwhenua o Waitaha

Those who lost relatives and friends in the 22 February earthquake can be assured that there will be a very thorough inquiry into the failure of buildings that resulted in loss of life.
Chair, Justice Mark Cooper

Document library

Document categories

Additional filter options

Choose 1 or more filters then press 'Apply filter'
Reset

Search results

Published Sorted ascending Title Not sorted Author(s) Not sorted Category Not sorted Subject(s) Not sorted Building(s) Not sorted Action
2011-10-2121 October 2011Canterbury Earthquake Sequence and Implications for Seismic Design Levels: Technical Report compiled by Dr Terry Webb of GNS Science, July 2011Canterbury Earthquake Sequence and Implications for Seismic Design Levels: Technical Report compiled by Dr Terry Webb of GNS Science, July 2011
  • GNS Science
  • Webb, T H (Terry)
    Technical Report
    Seismicity
    2011-10-2121 October 2011System of Building Controls - Appendix A, Section 3: Development of structural design and standards - Overview timeline of standards relating to determination of loads and methods of determining loads: Technical report compiled by Standards New Zealand, August 2011System of Building Controls - Appendix A, Section 3: Development of structural design and standards - Overview timeline of standards relating to determination of loads and methods of determining loads: Technical report compiled by Standards New Zealand, August 2011
    • Department of Building and Housing
    • Standards New Zealand
      Technical Report
      Standards and Regulation
      2011-10-2121 October 2011System of Building Controls - Appendix A, Section 4: Building Act tools for the upgrading of the structural performance of buildings - references and appendices for assessment and improvement of the structural performance of buildings in earthquakes: Technical report by New Zealand Cabinet, June 2006System of Building Controls - Appendix A, Section 4: Building Act tools for the upgrading of the structural performance of buildings - references and appendices for assessment and improvement of the structural performance of buildings in earthquakes: Technical report by New Zealand Cabinet, June 2006
      • Department of Building and Housing
      • New Zealand Cabinet
        Technical Report
        Standards and Regulation
        2011-10-2121 October 2011Foundations on Deep Alluvial Soils: Summary by Canterbury Earthquakes Royal Commission, August 2011Foundations on Deep Alluvial Soils: Summary by Canterbury Earthquakes Royal Commission, August 2011
          Canterbury Earthquakes Royal Commission
          Technical Report
          Geotechnical
          2011-10-2121 October 2011System of Building Controls - Regulation of the Engineering Profession - Chartered Professional Engineers of New Zealand Act 2002 and Rules (no 2) 2002: Technical Report by New Zealand Cabinet, October 2006System of Building Controls - Regulation of the Engineering Profession - Chartered Professional Engineers of New Zealand Act 2002 and Rules (no 2) 2002: Technical Report by New Zealand Cabinet, October 2006
          • Department of Building and Housing
          • New Zealand Cabinet
            Technical Report
          • Standards and Regulation
          • Training and Education
            2011-10-2121 October 2011Z-factor Graph: Technical Report by GNS Science, October 2011Z-factor Graph: Technical Report by GNS Science, October 2011
            • GNS Science
            • Webb, T H (Terry)
            • Exhibit
            • Technical Report
              Seismicity
              2011-11-0202 November 2011Letter from David Nummy of Unitec to the Royal Commission regarding engineering qualificationsLetter from David Nummy of Unitec to the Royal Commission regarding engineering qualifications
              • Nummy, David
              • Unitec
              • Submission
              • Technical Report
                Engineering
                2011-11-0202 November 2011Canterbury Earthquakes Royal Commission summary of the IPENZ report 'Standards and Regulation for Building Construction in New Zealand'Canterbury Earthquakes Royal Commission summary of the IPENZ report 'Standards and Regulation for Building Construction in New Zealand'
                  Canterbury Earthquakes Royal Commission
                  Technical Report
                  Standards and Regulation
                  2011-11-0202 November 2011Structural and Geotechnical Engineering Education: Submission by Faculty of Engineering, University of Auckland, August 2011Structural and Geotechnical Engineering Education: Submission by Faculty of Engineering, University of Auckland, August 2011
                  • Davies, Michael C R
                  • Pender, Michael
                  • Quenneville, Pierre
                  • Submission
                  • Technical Report
                    Training and Education
                    2011-11-0303 November 2011Performance of Unreinforced Masonry in the 2010/2011 Canterbury Earthquake Swarm: Technical Report by Associate Professor Jason M Ingham and Professor Michael C Griffith, August 2011Performance of Unreinforced Masonry in the 2010/2011 Canterbury Earthquake Swarm: Technical Report by Associate Professor Jason M Ingham and Professor Michael C Griffith, August 2011
                    • Griffith, Michael C
                    • Ingham, Jason M
                      Technical Report
                      Unreinforced Masonry Buildings (URM)
                      2011-11-0303 November 2011Performance of Unreinforced Masonry Buildings in the 2010/2011 Canterbury Earthquake Swarm: Peer Review by Bret Lizundia, September 2011Performance of Unreinforced Masonry Buildings in the 2010/2011 Canterbury Earthquake Swarm: Peer Review by Bret Lizundia, September 2011
                      • Lizundia, Bret
                      • Rutherford & Chekene
                        Technical Report
                        Unreinforced Masonry Buildings (URM)
                        2011-11-0303 November 2011The Performance of Earthquake Strengthened URM Buildings in the Christchurch CBD in the 22 February 2011 Earthquake: Addendum Report by Associate Professor Jason M. Ingham and Professor Michael C. Griffith, October 2011The Performance of Earthquake Strengthened URM Buildings in the Christchurch CBD in the 22 February 2011 Earthquake: Addendum Report by Associate Professor Jason M. Ingham and Professor Michael C. Griffith, October 2011
                        • Griffith, Michael C
                        • Ingham, Jason M
                        • University of Auckland
                          Technical Report
                          Unreinforced Masonry Buildings (URM)
                          2011-11-0303 November 2011Performance of Unreinforced Masonry Buildings in the 2010/2011 Canterbury Earthquake Swarm: Peer Review by Fred Turner, September 2011Performance of Unreinforced Masonry Buildings in the 2010/2011 Canterbury Earthquake Swarm: Peer Review by Fred Turner, September 2011
                            Turner, Fred
                            Technical Report
                            Unreinforced Masonry Buildings (URM)
                            2011-11-0404 November 2011Building Evaluation Transition Team - Processes Used and Lessons Learnt Following the Darfield Earthquake of 4 September 2010: Technical Report by Esther Griffiths of Sisirc Consulting Limited and Deane McNulty of McNulty Engineering Management Limited, January 2011 Building Evaluation Transition Team - Processes Used and Lessons Learnt Following the Darfield Earthquake of 4 September 2010: Technical Report by Esther Griffiths of Sisirc Consulting Limited and Deane McNulty of McNulty Engineering Management Limited, January 2011
                            • Griffiths, Esther
                            • McNulty, Deane
                              Technical Report
                              Christchurch Recovery
                              2011-11-0404 November 2011The Civil Defence Emergency Management Framework and Response to the 22 February Christchurch Earthquake: Technical report by the Ministry of Civil Defence & Emergency Management, October 2011The Civil Defence Emergency Management Framework and Response to the 22 February Christchurch Earthquake: Technical report by the Ministry of Civil Defence & Emergency Management, October 2011
                                Ministry of Civil Defence and Emergency
                                Technical Report
                              • Emergency Powers and Procedures
                              • Safety Evaluation
                              • Standards and Regulation
                                2011-11-0707 November 2011Independent Review of the Response to the Canterbury Earthquake, 4 September 2010: Technical report commissioned by Ministry of Civil Defence & Emergency Management, May 2011Independent Review of the Response to the Canterbury Earthquake, 4 September 2010: Technical report commissioned by Ministry of Civil Defence & Emergency Management, May 2011
                                • Middleton, David
                                • Westlake, Richard
                                  Technical Report
                                  Christchurch Recovery
                                  2011-11-0707 November 2011Report into Building Safety Evaluation in the Central Business District Following the 4 September 2010 Earthquake: Technical Report by the Christchurch City Council, August 2011, Part 1 of 5, Page 1-80Report into Building Safety Evaluation in the Central Business District Following the 4 September 2010 Earthquake: Technical Report by the Christchurch City Council, August 2011, Part 1 of 5, Page 1-80
                                    Christchurch City Council
                                    Technical Report
                                    Placarding (Stickering)
                                    2011-11-0707 November 2011Report into Building Safety Evaluation in the Central Business District Following the 4 September 2010 Earthquake: Technical Report by the Christchurch City Council, August 2011, Part 5 of 5, Page 171-196Report into Building Safety Evaluation in the Central Business District Following the 4 September 2010 Earthquake: Technical Report by the Christchurch City Council, August 2011, Part 5 of 5, Page 171-196
                                      Christchurch City Council
                                      Technical Report
                                      Placarding (Stickering)
                                      2011-11-0707 November 2011Report into Building Safety Evaluation in the Central Business District Following the 4 September 2010 Earthquake: Technical Report by the Christchurch City Council, August 2011, Part 2 of 5, Page 81-117Report into Building Safety Evaluation in the Central Business District Following the 4 September 2010 Earthquake: Technical Report by the Christchurch City Council, August 2011, Part 2 of 5, Page 81-117
                                        Christchurch City Council
                                        Technical Report
                                        Placarding (Stickering)
                                        2011-11-0707 November 2011Report into Building Safety Evaluation in the Central Business District Following the 4 September 2010 Earthquake: Technical Report by the Christchurch City Council, August 2011, Part 3 of 5, Page 118 -146Report into Building Safety Evaluation in the Central Business District Following the 4 September 2010 Earthquake: Technical Report by the Christchurch City Council, August 2011, Part 3 of 5, Page 118 -146
                                          Christchurch City Council
                                          Technical Report
                                          Placarding (Stickering)

                                          Search results navigation

                                          Displaying 21 - 40 of 76 items arrow left First arrow left Prev arrow right Next arrow right Last