Canterbury Earthquakes Royal Commission Te Komihana Rūwhenua o Waitaha Canterbury Earthquakes Royal Commission – Te Komihana Rūwhenua o Waitaha

Those who lost relatives and friends in the 22 February earthquake can be assured that there will be a very thorough inquiry into the failure of buildings that resulted in loss of life.
Chair, Justice Mark Cooper

Document library

Document categories

Additional filter options

Choose 1 or more filters then press 'Apply filter'
Reset

Search results

Published No sorted Title Not sorted Author(s) Not sorted Category Not sorted Subject(s) Not sorted Building(s) Sorted ascending Action
2012-03-1212 March 2012Department of Building and Housing Technical Investigation Reports: Peer review by William Holmes, November 2011Department of Building and Housing Technical Investigation Reports: Peer review by William Holmes, November 2011
  • Holmes, William T
  • Rutherford & Chekene
  • Exhibit
  • Technical Report
  • Building Failure
  • Buildings - Representative Sample
  • Central Business District (CBD)
    Cashel 161
2012-01-1717 January 2012Hotel Grand Chancellor hearing: Report on the Structural Performance of the Hotel Grand Chancellor in the Earthquake of 22 February 2011Hotel Grand Chancellor hearing: Report on the Structural Performance of the Hotel Grand Chancellor in the Earthquake of 22 February 2011
    Dunning Thornton Consultants Ltd
    Technical Report
  • Buildings - Representative Sample
  • Structural Performance
    Cashel 161
2012-09-1010 September 2012Materials Testing in Buildings of Interest - Gallery Apartments, Westpac Centre, IRD Building: Report prepared by Holmes Solutions, November 2011Materials Testing in Buildings of Interest - Gallery Apartments, Westpac Centre, IRD Building: Report prepared by Holmes Solutions, November 2011
  • Allington, Chris
  • Holmes Solutions
    Technical Report
    Buildings - Representative Sample
    Cashel 166
2012-10-2525 October 2012Independent Assessment on Earthquake Performance of Westpac Tower - 166 Cashel Street: Report by Peter Smith and Vaughan England of Spencer Holmes Limited, February 2012 Independent Assessment on Earthquake Performance of Westpac Tower - 166 Cashel Street: Report by Peter Smith and Vaughan England of Spencer Holmes Limited, February 2012
  • England, Vaughan
  • Smith, Peter
  • Spencer Holmes Ltd
    Technical Report
    Buildings - Representative Sample
    Cashel 166
2012-09-1010 September 2012Materials Testing in Buildings of Interest - Gallery Apartments, Westpac Centre, IRD Building: Report prepared by Holmes Solutions, November 2011Materials Testing in Buildings of Interest - Gallery Apartments, Westpac Centre, IRD Building: Report prepared by Holmes Solutions, November 2011
  • Allington, Chris
  • Holmes Solutions
    Technical Report
    Buildings - Representative Sample
    Cashel 224
2012-10-2626 October 2012 Independent Assessment of Earthquake Performance of Inland Revenue Building - 224 Cashel Street: Report prepared by Peter Smith and Jonathan Devine of Spencer Holmes Limited Independent Assessment of Earthquake Performance of Inland Revenue Building - 224 Cashel Street: Report prepared by Peter Smith and Jonathan Devine of Spencer Holmes Limited
  • Devine, Jonathan
  • Smith, Peter
  • Spencer Holmes Ltd
    Technical Report
    Buildings - Representative Sample
    Cashel 224
2011-12-0202 December 2011Department of Building and Housing Expert Panel Report on the PGC, Forsyth Barr and Hotel Grand Chancellor Buildings, released 30 September 2011Department of Building and Housing Expert Panel Report on the PGC, Forsyth Barr and Hotel Grand Chancellor Buildings, released 30 September 2011
    Department of Building and Housing
    Technical Report
  • Building Failure
  • Buildings - Representative Sample
    Colombo 764
2012-03-1212 March 2012Department of Building and Housing Technical Investigation Reports: Peer review by William Holmes, November 2011Department of Building and Housing Technical Investigation Reports: Peer review by William Holmes, November 2011
  • Holmes, William T
  • Rutherford & Chekene
  • Exhibit
  • Technical Report
  • Building Failure
  • Buildings - Representative Sample
  • Central Business District (CBD)
    Colombo 764
2011-11-1515 November 2011Letter from the Department of Building and Housing about the Forsyth Barr building report, November 2011Letter from the Department of Building and Housing about the Forsyth Barr building report, November 2011
  • Department of Building and Housing
  • Hopkins, David
    Technical Report
  • Buildings - Representative Sample
  • RFI and EOI
    Colombo 764
2012-09-1010 September 2012Materials Testing in Buildings of Interest - Gallery Apartments, Westpac Centre, IRD Building: Report prepared by Holmes Solutions, November 2011Materials Testing in Buildings of Interest - Gallery Apartments, Westpac Centre, IRD Building: Report prepared by Holmes Solutions, November 2011
  • Allington, Chris
  • Holmes Solutions
    Technical Report
    Buildings - Representative Sample
    Gloucester 62
2012-10-2626 October 2012Independent Assessment on Earthquake Performance of Gallery Apartments - 62 Gloucester Street: Report by Peter Smith and Vaughan England of Spencer Holmes Limited, February 2012Independent Assessment on Earthquake Performance of Gallery Apartments - 62 Gloucester Street: Report by Peter Smith and Vaughan England of Spencer Holmes Limited, February 2012
  • Smith, Peter
  • Spencer Holmes Ltd
    Technical Report
    Buildings - Representative Sample
    Gloucester 62
2012-10-2424 October 2012Independent Earthquake Performance Assessment of Christchurch Central Police Station - 48 Hereford Street: Report by Dr Nicholas Brooke of Compusoft Engineering Limited, February 2012Independent Earthquake Performance Assessment of Christchurch Central Police Station - 48 Hereford Street: Report by Dr Nicholas Brooke of Compusoft Engineering Limited, February 2012
    Compusoft Engineering
    Technical Report
    Buildings - Representative Sample
    Hereford 48
2012-10-2424 October 2012Independent Earthquake Performance Assessment of Christchurch Civic Building - 53 Hereford Street: Report by Dr Nicholas Brooke of Compusoft Engineering Limited, March 2012Independent Earthquake Performance Assessment of Christchurch Civic Building - 53 Hereford Street: Report by Dr Nicholas Brooke of Compusoft Engineering Limited, March 2012
  • Brooke, Nicholas
  • Compusoft Engineering
    Technical Report
    Buildings - Representative Sample
    Hereford 53
2012-10-2626 October 2012Seismic Performance Summary draft report for Christchurch Town Hall - 100 Kilmore Street: Prepared by Rutherford & Chekene, April 2012Seismic Performance Summary draft report for Christchurch Town Hall - 100 Kilmore Street: Prepared by Rutherford & Chekene, April 2012
    Rutherford & Chekene
    Technical Report
    Buildings - Representative Sample
    Kilmore 100
2012-02-1414 February 2012CTV Building Collapse Investigation reports prepared for the Department of Building and Housing CTV Building Collapse Investigation reports prepared for the Department of Building and Housing
  • Department of Building and Housing
  • Hyland Consultants Ltd
  • Structure Smith Consulting Engineers
    Technical Report
  • Building Failure
  • Buildings - Representative Sample
    Madras 249
2012-06-2525 June 2012CTV Building hearing: CTV Building Collapse Investigation Report by Dr Clark Hyland and Ashley Smith, January 2012CTV Building hearing: CTV Building Collapse Investigation Report by Dr Clark Hyland and Ashley Smith, January 2012
  • Hyland Consultants Ltd
  • Hyland, Clark
  • Smith, Ashley
  • Structure Smith Consulting Engineers
  • Exhibit
  • Technical Report
    Buildings - Representative Sample
    Madras 249
2012-10-2626 October 2012Detailed Engineering Evaluation of Christchurch Women's Hospital provided to the Royal Commission by Holmes Consulting Group in May 2012Detailed Engineering Evaluation of Christchurch Women's Hospital provided to the Royal Commission by Holmes Consulting Group in May 2012
    Holmes Consulting Group
    Technical Report
    Buildings - Representative Sample
    Riccarton Ave 2
2012-10-2626 October 2012Independent Assessment on Earthquake Performance of 151 Worcester Street: Report by Peter Smith and Jonathan Devine of Spencer Holmes Limited, December 2011Independent Assessment on Earthquake Performance of 151 Worcester Street: Report by Peter Smith and Jonathan Devine of Spencer Holmes Limited, December 2011
  • Devine, Jonathan
  • Smith, Peter
  • Spencer Holmes Ltd
    Technical Report
    Buildings - Representative Sample
    Worcester 151
2012-10-2626 October 2012Seismic Performance Investigation Draft Report of Clarendon Tower - 78 Worcester Street: Report by Bill Holmes and Reid Zimmerman of Rutherford & Chekene, February 2012Seismic Performance Investigation Draft Report of Clarendon Tower - 78 Worcester Street: Report by Bill Holmes and Reid Zimmerman of Rutherford & Chekene, February 2012
  • Holmes, William T
  • Rutherford & Chekene
  • Zimmerman, Reid
    Technical Report
    Buildings - Representative Sample
    Worcester 78
2011-10-2121 October 2011Stairs and Access Ramps Between Floors in Multi-Storey Buildings: Technical Report by Des Bull, August 2011Stairs and Access Ramps Between Floors in Multi-Storey Buildings: Technical Report by Des Bull, August 2011
  • Bull, Des
  • Holmes Consulting Group
    Technical Report
  • Engineering
  • Stairs and Floors

    Search results navigation

    Displaying 7 - 26 of 82 items arrow left First arrow left Prev arrow right Next arrow right Last