Canterbury Earthquakes Royal Commission Te Komihana Rūwhenua o Waitaha Canterbury Earthquakes Royal Commission – Te Komihana Rūwhenua o Waitaha

Those who lost relatives and friends in the 22 February earthquake can be assured that there will be a very thorough inquiry into the failure of buildings that resulted in loss of life.
Chair, Justice Mark Cooper

Document library

Document categories

Additional filter options

Choose 1 or more filters then press 'Apply filter'
Reset

Search results

Published No sorted Title Not sorted Author(s) Not sorted Category Not sorted Subject(s) Not sorted Building(s) Sorted descending Action
2012-09-07-16- 31-5407 September 2012Submission from Dr Barry Davison on The Improvement of Building Design Through the Modification of the Certification ProcessSubmission from Dr Barry Davison on The Improvement of Building Design Through the Modification of the Certification Process
    Davidson, Barry
    Submission
    Engineering
    2012-11-27-16- 03-1427 November 2012 Building Safety Evaluation After the February 22, 2011 Christchurch, New Zealand Earthquake: Observations by the ATC Reconnaissance Team Building Safety Evaluation After the February 22, 2011 Christchurch, New Zealand Earthquake: Observations by the ATC Reconnaissance Team
    • Barnes, Jim
    • Gallagher, Ronald
    • Lizundia, Bret
      Referenced Document
      Building assessments after earthquakes
      2011-11-07-14- 28-1507 November 2011Report into Building Safety Evaluation in the Central Business District Following the 4 September 2010 Earthquake: Technical Report by the Christchurch City Council, August 2011, Part 3 of 5, Page 118 -146Report into Building Safety Evaluation in the Central Business District Following the 4 September 2010 Earthquake: Technical Report by the Christchurch City Council, August 2011, Part 3 of 5, Page 118 -146
        Christchurch City Council
        Technical Report
        Placarding (Stickering)
        2012-11-27-16- 25-3427 November 2012Guidance for Engineers Assessing the Seismic Performance of Non-residential and Multi-unit Residential Buildings in Greater Christchurch, by the former Department of Building and HousingGuidance for Engineers Assessing the Seismic Performance of Non-residential and Multi-unit Residential Buildings in Greater Christchurch, by the former Department of Building and Housing
          Department of Building and Housing
          Referenced Document
        • Building assessments after earthquakes
        • Engineering
          2011-11-14-14- 47-5014 November 2011Proposed Earthquake-Prone and Insanitary Buildings Policy 2010Proposed Earthquake-Prone and Insanitary Buildings Policy 2010
            Christchurch City Council
            Exhibit
          • Standards and Regulation
          • Unreinforced Masonry Buildings (URM)
            2011-10-20-10- 15-4520 October 2011Christchurch area showing waterways, swamps & vegetation cover in 1856 mapChristchurch area showing waterways, swamps & vegetation cover in 1856 map
            • Cass, Thomas
            • Thomas, J
              Submission
              Seismicity
              2012-11-27-16- 03-5327 November 2012National Civil Defence and Emergency Management StrategyNational Civil Defence and Emergency Management Strategy
                Ministry of Civil Defence & Emergency Management
                Referenced Document
              • Civil Defence
              • Emergency Powers and Procedures
                2012-08-22-12- 46-2222 August 2012Roles and Responsibilities: Submission from Wellington City Council on the Royal Commission Discussion Paper, August 2012Roles and Responsibilities: Submission from Wellington City Council on the Royal Commission Discussion Paper, August 2012
                  Wellington City Council
                  Submission
                • Roles and Responsibilities
                • Standards and Regulation
                  2011-10-21-13- 21-3721 October 2011Canterbury Earthquake Sequence and Implications for Seismic Design Levels: Peer Review by Professor Norman Abrahamson, July 2011Canterbury Earthquake Sequence and Implications for Seismic Design Levels: Peer Review by Professor Norman Abrahamson, July 2011
                    Abrahamson, Norman
                    Technical Report
                    Seismicity
                    2012-08-15-15- 42-4015 August 2012Building Management after Earthquakes: Submission by the Ministry of Civil Defence & Emergency Management on the Royal Commission Discussion Paper, July 2012Building Management after Earthquakes: Submission by the Ministry of Civil Defence & Emergency Management on the Royal Commission Discussion Paper, July 2012
                      Ministry of Civil Defence & Emergency Management
                      Submission
                    • Building assessments after earthquakes
                    • Placarding (Stickering)
                    • Safety Evaluation
                      2012-08-15-15- 52-5615 August 2012Building Management After Earthquakes: Submission from Auckland Council on the Royal Commission Discussion Paper, July 2012Building Management After Earthquakes: Submission from Auckland Council on the Royal Commission Discussion Paper, July 2012
                      • Cummuskey, Patrick
                      • Weight, Tim
                        Submission
                      • Building assessments after earthquakes
                      • Placarding (Stickering)
                      • Safety Evaluation
                        2011-10-28-10- 43-0328 October 2011Scientific Understanding of the Canterbury Crustal Earthquakes from 4 September 2010 to their Closure on 21 June 2011: Submission by James Quinwallace, September 2011Scientific Understanding of the Canterbury Crustal Earthquakes from 4 September 2010 to their Closure on 21 June 2011: Submission by James Quinwallace, September 2011
                          Quinwallace, James
                          Submission
                          Seismicity
                          2011-10-20-13- 19-0620 October 2011GNS Science - The Canterbury Earthquake Sequence - Shaking measures by instruments versus distance, compared to NZ model - Presentation to the Canterbury Earthquakes Royal Commission by Dr Terry WebbGNS Science - The Canterbury Earthquake Sequence - Shaking measures by instruments versus distance, compared to NZ model - Presentation to the Canterbury Earthquakes Royal Commission by Dr Terry Webb
                          • GNS Science
                          • Webb, T H (Terry)
                            Exhibit
                            Seismicity
                            2012-11-27-15- 44-3427 November 2012Draft Central City Plan, August 2011, Volume 1Draft Central City Plan, August 2011, Volume 1
                              Christchurch City Council
                              Referenced Document
                            • Architecture
                            • Central Business District (CBD)
                            • Christchurch Recovery
                            • Culture and Heritage
                              2011-11-10-10- 02-3810 November 2011Letter from Opotiki District Council about unreinforced masonry (URM) and earthquake-prone building policiesLetter from Opotiki District Council about unreinforced masonry (URM) and earthquake-prone building policies
                                Chapman, Stu
                                RFI Response
                                Standards and Regulation
                                2012-03-12-14- 36-2812 March 2012Biography of Jarg Didier Pettinga, Holmes Consulting GroupBiography of Jarg Didier Pettinga, Holmes Consulting Group
                                  Pettinga, Didier
                                  Exhibit
                                • New Building Technologies
                                • Profile
                                  2012-11-23-09- 51-3923 November 2012CTV Building hearing: Damage, Death and Downtime Risk Attenuation in the 2011Christchurch Earthquake; Paper written by John Mander and Y HuangCTV Building hearing: Damage, Death and Downtime Risk Attenuation in the 2011Christchurch Earthquake; Paper written by John Mander and Y Huang
                                  • Huang, Y
                                  • Mander, John
                                    Exhibit
                                  • Building Failure
                                  • Fatality and Injury
                                  • Structural Performance
                                    2011-11-10-10- 04-0910 November 2011Letter from Napier City Council about unreinforced masonry (URM) and earthquake-prone building policiesLetter from Napier City Council about unreinforced masonry (URM) and earthquake-prone building policies
                                    • Napier City Council
                                    • Taylor, Neil
                                      RFI Response
                                      Standards and Regulation
                                      2012-07-31-15- 45-3131 July 2012CTV Building hearing: NZS 3101 Part 1: 1982 Code of practice for the Design of Concrete StructuresCTV Building hearing: NZS 3101 Part 1: 1982 Code of practice for the Design of Concrete Structures
                                        Standards New Zealand
                                        Exhibit
                                        Standards and Regulation
                                        2011-11-02-12- 48-2502 November 2011Letter from David Nummy of Unitec to the Royal Commission regarding engineering qualificationsLetter from David Nummy of Unitec to the Royal Commission regarding engineering qualifications
                                        • Nummy, David
                                        • Unitec
                                        • Submission
                                        • Technical Report
                                          Engineering

                                          Search results navigation

                                          Displaying 322 - 341 of 1517 items arrow left First arrow left Prev arrow right Next arrow right Last