Canterbury Earthquakes Royal Commission Te Komihana Rūwhenua o Waitaha Canterbury Earthquakes Royal Commission – Te Komihana Rūwhenua o Waitaha

Those who lost relatives and friends in the 22 February earthquake can be assured that there will be a very thorough inquiry into the failure of buildings that resulted in loss of life.
Chair, Justice Mark Cooper

Document library

Document categories

Additional filter options

Choose 1 or more filters then press 'Apply filter'
Reset

Search results

Published No sorted Title Not sorted Author(s) Sorted ascending Category Not sorted Subject(s) Not sorted Building(s) Not sorted Action
2011-11-14-13- 42-5814 November 2011Steel Building Damage From The Christchurch Earthquake Series of 2010 and 2011: Technical Report by Charles Clifton, Michel Bruneau, Alistair Fussell, Roberto Leon and Greg MacRae, November 2011Steel Building Damage From The Christchurch Earthquake Series of 2010 and 2011: Technical Report by Charles Clifton, Michel Bruneau, Alistair Fussell, Roberto Leon and Greg MacRae, November 2011
    Fussell, Alistair
    Technical Report
  • Buildings - Representative Sample
  • Engineering
    2012-01-30-11- 39-0930 January 2012Submission by Steel Construction New Zealand Inc, November 2011Submission by Steel Construction New Zealand Inc, November 2011
      Fussell, Alistair
      Submission
    • Engineering
    • New Building Technologies
      2012-07-12-15- 54-4612 July 2012CTV Building hearing: Design of Concrete Structures: Research Report by R Park, T Pauley, MJN Priestley and L Gaerty, July 1986CTV Building hearing: Design of Concrete Structures: Research Report by R Park, T Pauley, MJN Priestley and L Gaerty, July 1986
        Gaerty, L
        Exhibit
        Buildings - Representative Sample
        Madras 249
      2012-08-16-17- 30-4716 August 2012CTV Building hearing: Statement of Evidence of Robert GaimsterCTV Building hearing: Statement of Evidence of Robert Gaimster
        Gaimster, Robert
        Exhibit
        Buildings - Representative Sample
        Madras 249
      2012-11-26-15- 46-1726 November 2012 CTV Building hearing: CCANZ presentation to the Royal Commission by Rob Gaimster CTV Building hearing: CCANZ presentation to the Royal Commission by Rob Gaimster
        Gaimster, Robert
        Exhibit
        Engineering
        Madras 249
      2012-11-27-16- 03-1427 November 2012 Building Safety Evaluation After the February 22, 2011 Christchurch, New Zealand Earthquake: Observations by the ATC Reconnaissance Team Building Safety Evaluation After the February 22, 2011 Christchurch, New Zealand Earthquake: Observations by the ATC Reconnaissance Team
        Gallagher, Ronald
        Referenced Document
        Building assessments after earthquakes
        2012-08-15-13- 07-0815 August 2012Building Management After Earthquakes: Submission by Bruce Galloway and John Hare of Holmes Consulting Group on the Royal Commission Discussion Paper, July 2012Building Management After Earthquakes: Submission by Bruce Galloway and John Hare of Holmes Consulting Group on the Royal Commission Discussion Paper, July 2012
          Galloway, Bruce
          Submission
        • Building assessments after earthquakes
        • Central Business District (CBD)
        • Engineering
        • Placarding (Stickering)
        • Safety Evaluation
        • Standards and Regulation
          2012-02-15-15- 39-2515 February 2012High 246 hearing: Brief of Evidence of Bruce Duncan GallowayHigh 246 hearing: Brief of Evidence of Bruce Duncan Galloway
            Galloway, Bruce
            Exhibit
            Buildings - Representative Sample
            High 246
          2012-11-27-15- 54-4827 November 2012Assessment of hollow-core floors for seismic performance - research reportAssessment of hollow-core floors for seismic performance - research report
            Gardiner, Debra
            Referenced Document
            Engineering
            2012-01-23-15- 41-4723 January 2012Lichfield 116 hearing: Statement of Evidence of Sean GardinerLichfield 116 hearing: Statement of Evidence of Sean Gardiner
              Gardiner, Sean
              Exhibit
              Buildings - Representative Sample
              Lichfield 116
            2011-10-25-16- 03-3125 October 2011Foundations on Deep Alluvial Soils: Presentation by Misko Cubrinovski on 25 October 2011 (session 2) - pages 35-40Foundations on Deep Alluvial Soils: Presentation by Misko Cubrinovski on 25 October 2011 (session 2) - pages 35-40
              Geotech Consulting Ltd
              Exhibit
              Geotechnical
              2011-10-21-14- 38-1521 October 2011Foundations on Deep Alluvial Soils: Technical Report by Professor Misko Cubrinovski and Ian McCahon, August 2011Foundations on Deep Alluvial Soils: Technical Report by Professor Misko Cubrinovski and Ian McCahon, August 2011
                Geotech Consulting Ltd
                Technical Report
                Geotechnical
                2011-10-25-14- 15-0825 October 2011Foundations on Deep Alluvial Soils - Presentation by Dr. Misko Cubrinovski on 25 October 2011 - Pages 1-35Foundations on Deep Alluvial Soils - Presentation by Dr. Misko Cubrinovski on 25 October 2011 - Pages 1-35
                  Geotech Consulting Ltd
                  Exhibit
                  Geotechnical
                  2011-10-28-13- 25-0328 October 2011Foundations on Deep Alluvial Soils - Presentation by Misko Cubrinovksi on 25 October 2011 (Session 3) - pages 41-46Foundations on Deep Alluvial Soils - Presentation by Misko Cubrinovksi on 25 October 2011 (Session 3) - pages 41-46
                    Geotech Consulting Ltd
                    Exhibit
                    Geotechnical
                    2012-02-27-11- 36-0527 February 2012Lichfield 43 hearing: Design features report and structural and floor plan of car park by Lovell-Smith & Cusiel Ltd, geotechnical report by Geotech Consulting Limited and Rapid Assessment Form - Level 1Lichfield 43 hearing: Design features report and structural and floor plan of car park by Lovell-Smith & Cusiel Ltd, geotechnical report by Geotech Consulting Limited and Rapid Assessment Form - Level 1
                      Geotech Consulting Ltd
                      Opening Statement
                      Buildings - Representative Sample
                      Lichfield 43
                    2012-12-05-23- 38-4605 December 2012Site Investigation Report (Geotech Consulting, November 2011 ) and Structural engineering inspections and assessments (Buchanan & Fletcher Ltd, May 2011) for 79 Cambridge Terrace, Bradley Nuttal HouseSite Investigation Report (Geotech Consulting, November 2011 ) and Structural engineering inspections and assessments (Buchanan & Fletcher Ltd, May 2011) for 79 Cambridge Terrace, Bradley Nuttal House
                      Geotech Consulting Ltd
                        Buildings - Representative Sample
                        Cambridge 79
                      2011-10-19-17- 53-2919 October 2011Aftershock info for Geonet website: Number of aftershocks per day vs modelled daily number of aftershocks greater than magnitude 5Aftershock info for Geonet website: Number of aftershocks per day vs modelled daily number of aftershocks greater than magnitude 5
                        Gerstenberger, Matthew
                        Exhibit
                        Seismicity
                        2011-10-19-17- 45-2419 October 2011Aftershock information for Geonet website - Aftershock DefinitionAftershock information for Geonet website - Aftershock Definition
                          Gerstenberger, Matthew
                          Exhibit
                          Seismicity
                          2011-10-19-17- 29-0219 October 2011Email from Matthew Gerstenberger to Dr Terry Webb regarding aftershock information for the Geonet websiteEmail from Matthew Gerstenberger to Dr Terry Webb regarding aftershock information for the Geonet website
                            Gerstenberger, Matthew
                            Exhibit
                            Seismicity
                            2011-10-19-17- 50-1019 October 2011Aftershock info for Geonet website: Expected number of aftershocks per day of magnitude 4.0-4.9 and expected number of aftershocks per day of magnitude 5 and largerAftershock info for Geonet website: Expected number of aftershocks per day of magnitude 4.0-4.9 and expected number of aftershocks per day of magnitude 5 and larger
                              Gerstenberger, Matthew
                              Exhibit
                              Seismicity

                              Search results navigation

                              Displaying 697 - 716 of 1948 items arrow left First arrow left Prev arrow right Next arrow right Last