Canterbury Earthquakes Royal Commission Te Komihana Rūwhenua o Waitaha Canterbury Earthquakes Royal Commission – Te Komihana Rūwhenua o Waitaha

Those who lost relatives and friends in the 22 February earthquake can be assured that there will be a very thorough inquiry into the failure of buildings that resulted in loss of life.
Chair, Justice Mark Cooper

Document library

Document categories

Additional filter options

Choose 1 or more filters then press 'Apply filter'
Reset

Search results

Published No sorted Title Not sorted Author(s) Sorted descending Category Not sorted Subject(s) Not sorted Building(s) Not sorted Action
2012-03-13-16- 28-2713 March 2012New Technologies in Timber Buildings: Presentation by Professor Andy Buchanan from the University of Canterbury, March 2012New Technologies in Timber Buildings: Presentation by Professor Andy Buchanan from the University of Canterbury, March 2012
    Buchanan, Andrew H
    Exhibit
    New Building Technologies
    2012-01-26-13- 29-5226 January 2012Manchester 200-204 hearing: Email from Andy Buchanan, University of Canterbury to the Royal Commission commenting on 26 December 2010 inspection of building and enclosing photographManchester 200-204 hearing: Email from Andy Buchanan, University of Canterbury to the Royal Commission commenting on 26 December 2010 inspection of building and enclosing photograph
      Buchanan, Andrew H
      Exhibit
      Buildings - Representative Sample
      Manchester 200
    2012-12-05-23- 38-4605 December 2012Site Investigation Report (Geotech Consulting, November 2011 ) and Structural engineering inspections and assessments (Buchanan & Fletcher Ltd, May 2011) for 79 Cambridge Terrace, Bradley Nuttal HouseSite Investigation Report (Geotech Consulting, November 2011 ) and Structural engineering inspections and assessments (Buchanan & Fletcher Ltd, May 2011) for 79 Cambridge Terrace, Bradley Nuttal House
      Buchanan Fletcher Ltd
        Buildings - Representative Sample
        Cambridge 79
      2012-11-28-12- 06-1728 November 2012CTV Building hearing: Closing submissions of counsel for David CoatsworthCTV Building hearing: Closing submissions of counsel for David Coatsworth
        Bryant, Christina
        Closing Statement
        Buildings - Representative Sample
        Madras 249
      2012-09-03-13- 33-0303 September 2012Building Management after Earthquakes hearing: Presentation by Dave Brunsdon, FIPENZ on the Evaluation and Management of Buildings Following EarthquakesBuilding Management after Earthquakes hearing: Presentation by Dave Brunsdon, FIPENZ on the Evaluation and Management of Buildings Following Earthquakes
        Brunsdon, Dave
        Exhibit
        Building assessments after earthquakes
        2011-11-28-16- 20-1128 November 2011Building Safety Evaluation Following the Canterbury Earthquakes: Technical report by the New Zealand Society for Earthquake Engineering, September 2011Building Safety Evaluation Following the Canterbury Earthquakes: Technical report by the New Zealand Society for Earthquake Engineering, September 2011
          Brunsdon, Dave
        • Exhibit
        • Technical Report
        • Building Failure
        • Safety Evaluation
          2012-09-03-14- 08-3303 September 2012 Building Management after Earthquakes hearing: Curriculum vitae of Dave Brundsdon Building Management after Earthquakes hearing: Curriculum vitae of Dave Brundsdon
            Brunsdon, Dave
            Speaker Profile
            Building assessments after earthquakes
            2012-11-27-16- 22-4427 November 2012Rapid Evaluation of Building Safety: Learnings from the December 2007 Gisborne Earthquake, presentation by David BrunsdonRapid Evaluation of Building Safety: Learnings from the December 2007 Gisborne Earthquake, presentation by David Brunsdon
              Brunsdon, Dave
              Referenced Document
            • Building assessments after earthquakes
            • Placarding (Stickering)
            • Safety Evaluation
              2012-11-27-16- 48-5627 November 2012Planning for Development of Land on or Close to Active Faults, report by GNS SciencePlanning for Development of Land on or Close to Active Faults, report by GNS Science
                Brunsdon, Dave
                Referenced Document
              • Seismicity
              • Standards and Regulation
                2012-02-16-15- 41-0716 February 2012Integrating Professional Engineering Within Emergency Management Planning and Response in New Zealand: Submission by David Brunsdon, February 2012Integrating Professional Engineering Within Emergency Management Planning and Response in New Zealand: Submission by David Brunsdon, February 2012
                  Brunsdon, Dave
                  Submission
                  Training and Education
                  2011-11-14-13- 42-5814 November 2011Steel Building Damage From The Christchurch Earthquake Series of 2010 and 2011: Technical Report by Charles Clifton, Michel Bruneau, Alistair Fussell, Roberto Leon and Greg MacRae, November 2011Steel Building Damage From The Christchurch Earthquake Series of 2010 and 2011: Technical Report by Charles Clifton, Michel Bruneau, Alistair Fussell, Roberto Leon and Greg MacRae, November 2011
                    Bruneau, Michel
                    Technical Report
                  • Buildings - Representative Sample
                  • Engineering
                    2012-06-26-18- 00-5426 June 2012CTV Building hearing: Statement of Evidence of Peter James BrownCTV Building hearing: Statement of Evidence of Peter James Brown
                      Brown, Peter
                      Exhibit
                      Buildings - Representative Sample
                      Madras 249
                    2012-01-24-15- 11-5924 January 2012Cashel 89/91/93 hearing: Statement of Evidence of Andrew BrownCashel 89/91/93 hearing: Statement of Evidence of Andrew Brown
                      Brown, Andrew
                      Exhibit
                      Buildings - Representative Sample
                    • Cashel 89
                    • Cashel 91
                    • Cashel 93
                    2012-02-16-13- 25-4616 February 2012Colombo 603 and 605-613 hearing: Statement of Ann BrowerColombo 603 and 605-613 hearing: Statement of Ann Brower
                      Brower, Ann
                      Exhibit
                      Buildings - Representative Sample
                      Colombo 605
                    2012-01-24-11- 05-5624 January 2012Cashel 89/91/93 hearing: Statement of Beverley Francis BroomhallCashel 89/91/93 hearing: Statement of Beverley Francis Broomhall
                      Broomhall, Beverley
                      Exhibit
                      Buildings - Representative Sample
                    • Cashel 89
                    • Cashel 91
                    • Cashel 93
                    2012-08-08-11- 26-1308 August 2012CTV Building hearing: Statement of Evidence of Michael John Brooks CTV Building hearing: Statement of Evidence of Michael John Brooks
                      Brooks, Michael
                      Exhibit
                      Buildings - Representative Sample
                      Madras 249
                    2012-09-06-16- 25-4406 September 2012CTV Building hearing: Structural detail drawings by Michael BrooksCTV Building hearing: Structural detail drawings by Michael Brooks
                      Brooks, Michael
                      Referenced Document
                      Engineering
                      Madras 249
                    2012-03-26-09- 14-1426 March 2012Response to SESOC Practice Note: Design of Conventional Structural Systems Following the Canterbury Earthquakes: Submission by Compusoft Engineering, March 2012Response to SESOC Practice Note: Design of Conventional Structural Systems Following the Canterbury Earthquakes: Submission by Compusoft Engineering, March 2012
                      Brooke, Nicholas
                      Submission
                      Standards and Regulation
                      2012-07-26-11- 49-4726 July 2012CTV Building hearing: CTV Building Non-Linear Time History Analysis (NLTHA) Report: second draft issue prepared by Compusoft Engineering LimitedCTV Building hearing: CTV Building Non-Linear Time History Analysis (NLTHA) Report: second draft issue prepared by Compusoft Engineering Limited
                        Brooke, Nicholas
                        Exhibit
                        Buildings - Representative Sample
                        Madras 249
                      2012-07-26-12- 04-4126 July 2012CTV Building hearing: CTV Building Non-Linear Time History Analysis (NTHLA) Report: first draft issue prepared by Compusoft Engineering LimitedCTV Building hearing: CTV Building Non-Linear Time History Analysis (NTHLA) Report: first draft issue prepared by Compusoft Engineering Limited
                        Brooke, Nicholas
                        Exhibit
                        Buildings - Representative Sample
                        Madras 249

                      Search results navigation