Canterbury Earthquakes Royal Commission Te Komihana Rūwhenua o Waitaha Canterbury Earthquakes Royal Commission – Te Komihana Rūwhenua o Waitaha

Those who lost relatives and friends in the 22 February earthquake can be assured that there will be a very thorough inquiry into the failure of buildings that resulted in loss of life.
Chair, Justice Mark Cooper

Document library

Document categories

Additional filter options

Choose 1 or more filters then press 'Apply filter'
Reset

Search results

Published No sorted Title Not sorted Author(s) Not sorted Category Sorted ascending Subject(s) Not sorted Building(s) Not sorted Action
2012-08-06-10- 08-4106 August 20122012-08-02 CTV Building hearing transcript2012-08-02 CTV Building hearing transcript
    Speakers - Various
    Transcript
    Buildings - Representative Sample
    Madras 249
2012-08-02-10- 01-1402 August 20122012-07-31 CTV Building hearing transcript2012-07-31 CTV Building hearing transcript
    Speakers - Various
    Transcript
    Buildings - Representative Sample
    Madras 249
2012-08-06-09- 46-1406 August 20122012-08-01 CTV Building hearing transcript2012-08-01 CTV Building hearing transcript
    Speakers - Various
    Transcript
    Buildings - Representative Sample
    Madras 249
2012-07-25-11- 20-5825 July 20122012-07-23 CTV Building hearing transcript2012-07-23 CTV Building hearing transcript
    Speakers - Various
    Transcript
    Buildings - Representative Sample
    Madras 249
2012-07-27-09- 12-4327 July 20122012-07-25 CTV Building hearing transcript2012-07-25 CTV Building hearing transcript
    Speakers - Various
    Transcript
    Buildings - Representative Sample
    Madras 249
2012-02-17-09- 38-3617 February 20122012-02-15 Individual Buildings (Except CTV & PGC) Whose Failure Resulted in Loss of Life hearing transcript2012-02-15 Individual Buildings (Except CTV & PGC) Whose Failure Resulted in Loss of Life hearing transcript
    Speakers - Various
    Transcript
    Buildings - Representative Sample
  • Gloucester 194
  • High 246
2012-03-01-09- 59-1901 March 20122012-02-28 Individual Buildings (Except CTV & PGC) Whose Failure Resulted in Loss of Life hearing transcript2012-02-28 Individual Buildings (Except CTV & PGC) Whose Failure Resulted in Loss of Life hearing transcript
    Speakers - Various
    Transcript
    Buildings - Representative Sample
    Manchester 265-271
2012-09-05-09- 07-1505 September 20122012-09-03 Building Management after Earthquakes hearing transcript2012-09-03 Building Management after Earthquakes hearing transcript
    Speakers - Various
    Transcript
    Building assessments after earthquakes
    2012-09-14-14- 09-5414 September 20122012-09-12 Roles and Responsibilities hearing transcript2012-09-12 Roles and Responsibilities hearing transcript
      Speakers - Various
      Transcript
      Roles and Responsibilities
      2012-03-12-13- 20-0712 March 2012Lichfield 116 hearing: Documents in ChronologyLichfield 116 hearing: Documents in Chronology
        Various
      • Exhibit
      • Opening Statement
        Buildings - Representative Sample
        Lichfield 116
      2012-07-10-12- 13-0710 July 2012CTV Building hearing: Non Linear Time Analysis Model of CTV BuildingCTV Building hearing: Non Linear Time Analysis Model of CTV Building
      • Hyland Consultants Ltd
      • Hyland, Clark
      • Smith, Ashley
      • Structure Smith Consulting Engineers
      • Exhibit
      • Physical copy only
        Buildings - Representative Sample
        Madras 249
      2012-03-13-10- 57-2513 March 2012Submission on the Paper "Design of Conventional Structural Systems Following the Canterbury Earthquakes" by Colin Ashby of Ashby Consulting Engineering Ltd, March 2012Submission on the Paper "Design of Conventional Structural Systems Following the Canterbury Earthquakes" by Colin Ashby of Ashby Consulting Engineering Ltd, March 2012
      • Ashby Consulting Engineering Ltd
      • Ashby, Colin
      • Exhibit
      • Submission
      • New Building Technologies
      • Standards and Regulation
        2012-03-12-13- 05-4612 March 2012Requirement for Future Buildings: Submission by Rod Fulford on behalf of Precast New Zealand Inc, December 2011Requirement for Future Buildings: Submission by Rod Fulford on behalf of Precast New Zealand Inc, December 2011
        • Fulford, Rod
        • Precast New Zealand Inc
        • Exhibit
        • Submission
        • Engineering
        • New Building Technologies
          2011-10-27-16- 52-3627 October 2011Unreinforced masonry and other earthquake prone buildings - Requirements for seismic strengthening: Submission by Joe Arts, October 2011Unreinforced masonry and other earthquake prone buildings - Requirements for seismic strengthening: Submission by Joe Arts, October 2011
            Arts, Joe
          • Exhibit
          • Submission
            Unreinforced Masonry Buildings (URM)
            High 137-139
          2012-03-12-13- 05-4612 March 2012Requirement for Future Buildings: Submission by Rod Fulford on behalf of Precast New Zealand Inc, December 2011Requirement for Future Buildings: Submission by Rod Fulford on behalf of Precast New Zealand Inc, December 2011
          • Fulford, Rod
          • Precast New Zealand Inc
          • Exhibit
          • Submission
          • Engineering
          • New Building Technologies
            2012-11-26-16- 55-5026 November 2012CTV Building hearing: An Alternative Collapse Scenario for the CTV Building: Submission to the Royal Commission from John ManderCTV Building hearing: An Alternative Collapse Scenario for the CTV Building: Submission to the Royal Commission from John Mander
              Mander, John
            • Exhibit
            • Submission
              Buildings - Representative Sample
              Madras 249
            2011-11-28-16- 20-1128 November 2011Building Safety Evaluation Following the Canterbury Earthquakes: Technical report by the New Zealand Society for Earthquake Engineering, September 2011Building Safety Evaluation Following the Canterbury Earthquakes: Technical report by the New Zealand Society for Earthquake Engineering, September 2011
            • Brunsdon, Dave
            • New Zealand Society for Earthquake Engineering
            • Exhibit
            • Technical Report
            • Building Failure
            • Safety Evaluation
              2012-03-12-12- 39-1612 March 2012Department of Building and Housing Technical Investigation Reports: Peer review by William Holmes, November 2011Department of Building and Housing Technical Investigation Reports: Peer review by William Holmes, November 2011
              • Holmes, William T
              • Rutherford & Chekene
              • Exhibit
              • Technical Report
              • Building Failure
              • Buildings - Representative Sample
              • Central Business District (CBD)
              • Cambridge 233
              • Cashel 161
              • Colombo 764
              2011-10-21-13- 05-1421 October 2011Canterbury Earthquake Sequence and Implications for Seismic Design Levels: Peer Review by Professor Ralph Archuleta, October 2011Canterbury Earthquake Sequence and Implications for Seismic Design Levels: Peer Review by Professor Ralph Archuleta, October 2011
                Archuleta, Ralph J
              • Exhibit
              • Technical Report
                Seismicity
                2012-03-12-12- 21-2812 March 2012Foundations on Deep Alluvial Soils: Peer Review by Jonathan D Bray, October 2011Foundations on Deep Alluvial Soils: Peer Review by Jonathan D Bray, October 2011
                  Bray, Jonathan D
                • Exhibit
                • Technical Report
                  Geotechnical

                  Search results navigation

                  Displaying 1268 - 1287 of 1327 Items arrow left First arrow left Prev arrow right Next arrow right Last