Canterbury Earthquakes Royal Commission Te Komihana Rūwhenua o Waitaha Canterbury Earthquakes Royal Commission – Te Komihana Rūwhenua o Waitaha

Those who lost relatives and friends in the 22 February earthquake can be assured that there will be a very thorough inquiry into the failure of buildings that resulted in loss of life.
Chair, Justice Mark Cooper

Document library

Document categories

Additional filter options

Choose 1 or more filters then press 'Apply filter'
Reset

Search results

Published No sorted Title Not sorted Author(s) Not sorted Category Sorted ascending Subject(s) Not sorted Building(s) Not sorted Action
2011-10-21-14- 23-0421 October 2011Heritage earthquake prone building strengthening cost study: Technical report by John Hare of Holmes Consulting Group, June 2009Heritage earthquake prone building strengthening cost study: Technical report by John Hare of Holmes Consulting Group, June 2009
  • Hare, John
  • Holmes Consulting Group
    Technical Report
  • Culture and Heritage
  • Engineering
    2012-02-28-16- 23-5828 February 2012Structural Design for Earthquake Resistance - Past, Present and Future of Seismic Design: Technical Report by Associate Professor Rajesh P Dhakal, August 2011Structural Design for Earthquake Resistance - Past, Present and Future of Seismic Design: Technical Report by Associate Professor Rajesh P Dhakal, August 2011
      Dhakal, Rajesh P
      Technical Report
    • Engineering
    • New Building Technologies
      2011-10-21-13- 54-5921 October 2011Stairs and Access Ramps Between Floors in Multi-Storey Buildings: Technical Report by Des Bull, August 2011Stairs and Access Ramps Between Floors in Multi-Storey Buildings: Technical Report by Des Bull, August 2011
      • Bull, Des
      • Holmes Consulting Group
        Technical Report
      • Engineering
      • Stairs and Floors
        2011-11-04-15- 00-0004 November 2011The Civil Defence Emergency Management Framework and Response to the 22 February Christchurch Earthquake: Technical report by the Ministry of Civil Defence & Emergency Management, October 2011The Civil Defence Emergency Management Framework and Response to the 22 February Christchurch Earthquake: Technical report by the Ministry of Civil Defence & Emergency Management, October 2011
          Ministry of Civil Defence and Emergency
          Technical Report
        • Emergency Powers and Procedures
        • Safety Evaluation
        • Standards and Regulation
          2011-11-03-16- 05-4003 November 2011Performance of Unreinforced Masonry in the 2010/2011 Canterbury Earthquake Swarm: Technical Report by Associate Professor Jason M Ingham and Professor Michael C Griffith, August 2011Performance of Unreinforced Masonry in the 2010/2011 Canterbury Earthquake Swarm: Technical Report by Associate Professor Jason M Ingham and Professor Michael C Griffith, August 2011
          • Griffith, Michael C
          • Ingham, Jason M
            Technical Report
            Unreinforced Masonry Buildings (URM)
            2011-10-21-13- 58-1421 October 2011System of Building Controls - Appendix A, Section 6 - Investigation by the Department of Building and Housing into the building collapses - Technical investigation into the performance of buildings in the Christchurch CBD in the 22 February Christchurch aftershock: Technical Report by Department of Building and Housing, September 2011System of Building Controls - Appendix A, Section 6 - Investigation by the Department of Building and Housing into the building collapses - Technical investigation into the performance of buildings in the Christchurch CBD in the 22 February Christchurch aftershock: Technical Report by Department of Building and Housing, September 2011
              Department of Building and Housing
              Technical Report
            • Building Failure
            • Standards and Regulation
              2011-11-04-14- 48-5304 November 2011Building Evaluation Transition Team - Processes Used and Lessons Learnt Following the Darfield Earthquake of 4 September 2010: Technical Report by Esther Griffiths of Sisirc Consulting Limited and Deane McNulty of McNulty Engineering Management Limited, January 2011 Building Evaluation Transition Team - Processes Used and Lessons Learnt Following the Darfield Earthquake of 4 September 2010: Technical Report by Esther Griffiths of Sisirc Consulting Limited and Deane McNulty of McNulty Engineering Management Limited, January 2011
              • Griffiths, Esther
              • McNulty, Deane
                Technical Report
                Christchurch Recovery
                2011-10-21-14- 17-1021 October 2011System of Building Controls - Building regulatory framework, May 2011: Briefing to Royal Commission of Inquiry into building failure caused by Canterbury Earthquakes: Technical Report by the Department of Building and Housing, May 2005System of Building Controls - Building regulatory framework, May 2011: Briefing to Royal Commission of Inquiry into building failure caused by Canterbury Earthquakes: Technical Report by the Department of Building and Housing, May 2005
                  Department of Building and Housing
                  Technical Report
                  Standards and Regulation
                  2011-10-21-14- 32-3521 October 2011System of Building Controls - Appendix A, Section 2: The building regulatory system - Performance-based building regulatory systems: Principles and experiences: Technical Report by Inter-Jurisdictional Regulatory Collaboration Committee, February 2010System of Building Controls - Appendix A, Section 2: The building regulatory system - Performance-based building regulatory systems: Principles and experiences: Technical Report by Inter-Jurisdictional Regulatory Collaboration Committee, February 2010
                  • Department of Building and Housing
                  • Inter-jurisdictional Regulatory Collaboration Committee (IRCC)
                  • Meacham, Brian J
                    Technical Report
                    Standards and Regulation
                    2011-10-21-13- 48-5821 October 2011System of Building Controls - Building Act Review Cabinet Papers: Technical Report by New Zealand Cabinet, May 2011System of Building Controls - Building Act Review Cabinet Papers: Technical Report by New Zealand Cabinet, May 2011
                    • Department of Building and Housing
                    • New Zealand Cabinet
                      Technical Report
                      Standards and Regulation
                      2011-10-21-13- 07-4721 October 2011Inelastic Response Spectra for the Christchurch Earthquake Records: Technical Report by Professor Emeritus Athol J. Carr, September 2011Inelastic Response Spectra for the Christchurch Earthquake Records: Technical Report by Professor Emeritus Athol J. Carr, September 2011
                        Carr, Athol J
                        Technical Report
                        Engineering
                        2011-10-21-14- 14-0321 October 2011System of Building Controls - Exhibit A and appendix A of the Briefing to Royal Commission of Inquiry into building failure caused by Canterbury Earthquakes about the Building Regulatory Framework: Technical report by Department of Building and Housing, May 2011System of Building Controls - Exhibit A and appendix A of the Briefing to Royal Commission of Inquiry into building failure caused by Canterbury Earthquakes about the Building Regulatory Framework: Technical report by Department of Building and Housing, May 2011
                          Department of Building and Housing
                          Technical Report
                          Standards and Regulation
                          2011-11-15-13- 35-2515 November 2011Review of NZ Building Codes of Practice: Technical report by Gregory MacRae, Charles Clifton and Les Megget, August 2011Review of NZ Building Codes of Practice: Technical report by Gregory MacRae, Charles Clifton and Les Megget, August 2011
                          • Clifton, Charles
                          • MacRae, Gregory
                          • Megget, Lee
                            Technical Report
                            Standards and Regulation
                            2011-12-01-09- 09-1901 December 2011Management of Earthquake Risk by Canterbury Regional Council and Christchurch City Council - Obligations and Responses under RMA: Technical Report by Enfocus Ltd, November 2011Management of Earthquake Risk by Canterbury Regional Council and Christchurch City Council - Obligations and Responses under RMA: Technical Report by Enfocus Ltd, November 2011
                              Enfocus Ltd
                              Technical Report
                              Standards and Regulation
                              2011-10-21-14- 05-2021 October 2011System of Building Controls - Appendix A, Section 4: Building Act tools for the upgrading of the structural performance of buildings assessment and improvement of the structural performance of buildings in earthquakes: Technical report by New Zealand Society for Earthquake Engineering, June 2006System of Building Controls - Appendix A, Section 4: Building Act tools for the upgrading of the structural performance of buildings assessment and improvement of the structural performance of buildings in earthquakes: Technical report by New Zealand Society for Earthquake Engineering, June 2006
                              • Department of Building and Housing
                              • New Zealand Society for Earthquake Engineering
                                Technical Report
                              • Standards and Regulation
                              • Unreinforced Masonry Buildings (URM)
                                2011-10-21-14- 27-2521 October 2011System of Building Controls - Regulation of Registered Architects - Registered Architects Act 2005 and Registered Architects Rules 2006: Technical Report by New Zealand Cabinet, 2006System of Building Controls - Regulation of Registered Architects - Registered Architects Act 2005 and Registered Architects Rules 2006: Technical Report by New Zealand Cabinet, 2006
                                • Department of Building and Housing
                                • New Zealand Cabinet
                                  Technical Report
                                • Standards and Regulation
                                • Training and Education
                                  2011-11-07-14- 26-5407 November 2011Report into Building Safety Evaluation in the Central Business District Following the 4 September 2010 Earthquake: Technical Report by the Christchurch City Council, August 2011, Part 5 of 5, Page 171-196Report into Building Safety Evaluation in the Central Business District Following the 4 September 2010 Earthquake: Technical Report by the Christchurch City Council, August 2011, Part 5 of 5, Page 171-196
                                    Christchurch City Council
                                    Technical Report
                                    Placarding (Stickering)
                                    2011-11-07-14- 27-4207 November 2011Report into Building Safety Evaluation in the Central Business District Following the 4 September 2010 Earthquake: Technical Report by the Christchurch City Council, August 2011, Part 2 of 5, Page 81-117Report into Building Safety Evaluation in the Central Business District Following the 4 September 2010 Earthquake: Technical Report by the Christchurch City Council, August 2011, Part 2 of 5, Page 81-117
                                      Christchurch City Council
                                      Technical Report
                                      Placarding (Stickering)
                                      2012-10-25-14- 46-4625 October 2012Independent Assessment on Earthquake Performance of Craigs Investment Partners House - 90 Armagh Street: Report prepared by Peter Smith and Jonathan Devine of Spencer Holmes Limited, February 2012Independent Assessment on Earthquake Performance of Craigs Investment Partners House - 90 Armagh Street: Report prepared by Peter Smith and Jonathan Devine of Spencer Holmes Limited, February 2012
                                      • Devine, Jonathan
                                      • Smith, Peter
                                      • Spencer Holmes Ltd
                                        Technical Report
                                        Buildings - Representative Sample
                                        Armagh 90
                                      2011-10-21-14- 08-5121 October 2011System of Building Controls - Appendix A, Section 3: Development of structural design and standards - Overview timeline of standards relating to determination of loads and methods of determining loads: Technical report compiled by Standards New Zealand, August 2011System of Building Controls - Appendix A, Section 3: Development of structural design and standards - Overview timeline of standards relating to determination of loads and methods of determining loads: Technical report compiled by Standards New Zealand, August 2011
                                      • Department of Building and Housing
                                      • Standards New Zealand
                                        Technical Report
                                        Standards and Regulation

                                        Search results navigation

                                        Displaying 1142 - 1161 of 1327 Items arrow left First arrow left Prev arrow right Next arrow right Last