Canterbury Earthquakes Royal Commission Te Komihana Rūwhenua o Waitaha Canterbury Earthquakes Royal Commission – Te Komihana Rūwhenua o Waitaha

Those who lost relatives and friends in the 22 February earthquake can be assured that there will be a very thorough inquiry into the failure of buildings that resulted in loss of life.
Chair, Justice Mark Cooper

Document library

Document categories

Additional filter options

Choose 1 or more filters then press 'Apply filter'
Reset

Search results

Published No sorted Title Sorted descending Author(s) Not sorted Category Not sorted Subject(s) Not sorted Building(s) Not sorted Action
2011-10-19-17- 16-1219 October 2011Canterbury Earthquake Sequence and Implications for Seismic Design Levels: GNS Science Consultancy Report 2011/183, July 2011 -graphs presented at the hearings into seismicity presented by Dr G McVerryCanterbury Earthquake Sequence and Implications for Seismic Design Levels: GNS Science Consultancy Report 2011/183, July 2011 -graphs presented at the hearings into seismicity presented by Dr G McVerry
  • GNS Science
  • Webb, T H (Terry)
    Exhibit
    Seismicity
    2011-10-20-11- 15-4420 October 2011Canterbury Earthquake Sequence and Implications for Seismic Design Levels: GNS Science Consultancy Report 2011/183, July 2011- Report Extract - pages 34-36Canterbury Earthquake Sequence and Implications for Seismic Design Levels: GNS Science Consultancy Report 2011/183, July 2011- Report Extract - pages 34-36
    • GNS Science
    • Webb, T H (Terry)
      Exhibit
      Seismicity
      2011-10-21-13- 05-1421 October 2011Canterbury Earthquake Sequence and Implications for Seismic Design Levels: Peer Review by Professor Ralph Archuleta, October 2011Canterbury Earthquake Sequence and Implications for Seismic Design Levels: Peer Review by Professor Ralph Archuleta, October 2011
        Archuleta, Ralph J
      • Exhibit
      • Technical Report
        Seismicity
        2011-11-29-16- 24-4929 November 2011Cambridge 233 PGC Building: Statutory Declaration Given by Henry John Hare to DLA Phillips FoxCambridge 233 PGC Building: Statutory Declaration Given by Henry John Hare to DLA Phillips Fox
          Hare, John
          Exhibit
          Buildings - Representative Sample
          Cambridge 233
        2012-03-12-13- 26-1612 March 2012Cambridge 233 PGC Building: Standard producer statement - design is not appropriate for building consentCambridge 233 PGC Building: Standard producer statement - design is not appropriate for building consent
        • Holmes Consulting Group
        • Wilkinson, Grant
          Exhibit
          Buildings - Representative Sample
          Cambridge 233
        2011-11-28-17- 33-5728 November 2011Cambridge 233 PGC building: seismic evaluation of existing building in April 1997 by Holmes Consulting GroupCambridge 233 PGC building: seismic evaluation of existing building in April 1997 by Holmes Consulting Group
          Kelly, Trevor Edward
          Exhibit
          Buildings - Representative Sample
          Cambridge 233
        2011-11-30-12- 29-0530 November 2011Cambridge 233 PGC Building: Rapid Structural Assessment and Re-inspection after 4 September 2010Cambridge 233 PGC Building: Rapid Structural Assessment and Re-inspection after 4 September 2010
        • Holmes Consulting Group
        • Whiteside, Mark
          Exhibit
          Buildings - Representative Sample
          Cambridge 233
        2011-11-28-18- 26-1428 November 2011Cambridge 233 PGC Building: Rapid assessment form - Level 1 and Christchurch City Council inspection form templateCambridge 233 PGC Building: Rapid assessment form - Level 1 and Christchurch City Council inspection form template
          Christchurch City Council
          Exhibit
          Buildings - Representative Sample
          Cambridge 233
        2011-12-06-11- 12-0706 December 2011Cambridge 233 PGC Building: Progress Report by Beca with comments by Nigel Priestley, June 2011Cambridge 233 PGC Building: Progress Report by Beca with comments by Nigel Priestley, June 2011
          Priestley, Nigel
          Exhibit
          Buildings - Representative Sample
          Cambridge 233
        2011-11-28-15- 12-2928 November 2011Cambridge 233 PGC Building: Photographs showing building comparison before and after 22 February 2011 earthquakeCambridge 233 PGC Building: Photographs showing building comparison before and after 22 February 2011 earthquake
          Canterbury Earthquakes Royal Commission
          Exhibit
          Buildings - Representative Sample
          Cambridge 233
        2011-11-30-14- 41-1330 November 2011Cambridge 233 PGC Building: Photographic summary of primary damage observed from Department of Building and Housing, 16 September 2010Cambridge 233 PGC Building: Photographic summary of primary damage observed from Department of Building and Housing, 16 September 2010
          Department of Building and Housing
            Buildings - Representative Sample
            Cambridge 233
          2011-11-29-12- 18-0729 November 2011Cambridge 233 PGC Building: Memorandum from John Hare, Holmes Consulting Group, to Ian Bisman, Warren & Mahoney Ltd regarding study findingsCambridge 233 PGC Building: Memorandum from John Hare, Holmes Consulting Group, to Ian Bisman, Warren & Mahoney Ltd regarding study findings
          • Hare, John
          • Holmes Consulting Group
            Exhibit
            Buildings - Representative Sample
            Cambridge 233
          2011-11-28-15- 15-4428 November 2011Cambridge 233 PGC Building: Level one structural plan and inferred collapse sequenceCambridge 233 PGC Building: Level one structural plan and inferred collapse sequence
            Beca Carter Hollings and Ferner Ltd (BECA)
            Exhibit
            Buildings - Representative Sample
            Cambridge 233
          2011-11-28-16- 06-5628 November 2011Cambridge 233 PGC Building: Letter and documents from Holmes Consulting Group regarding information on the PGC BuildingCambridge 233 PGC Building: Letter and documents from Holmes Consulting Group regarding information on the PGC Building
          • Black, Bruce
          • Hare, John
          • Holmes Consulting Group
            Exhibit
            Buildings - Representative Sample
            Cambridge 233
          2011-11-28-16- 38-4428 November 2011Cambridge 233 PGC Building: Email correspondence between Education Review Office, tenants at 233 Cambridge Terrace, and NAI Harcourts regarding removal of Level 3 ceiling tilesCambridge 233 PGC Building: Email correspondence between Education Review Office, tenants at 233 Cambridge Terrace, and NAI Harcourts regarding removal of Level 3 ceiling tiles
          • Education Review Office
          • Harcourt Insulation (2006) Ltd
            Exhibit
            Buildings - Representative Sample
            Cambridge 233
          2011-11-28-16- 37-5428 November 2011Cambridge 233 PGC Building: Email correspondence between Education Review Office, tenants at 233 Cambridge Terrace, and NAI Harcourts regarding ceiling inspection and repairCambridge 233 PGC Building: Email correspondence between Education Review Office, tenants at 233 Cambridge Terrace, and NAI Harcourts regarding ceiling inspection and repair
          • Education Review Office
          • Harcourt Insulation (2006) Ltd
            Exhibit
            Buildings - Representative Sample
            Cambridge 233
          2012-03-06-11- 05-5106 March 2012Cambridge 233 PGC Building: Education Review Office collection of documents and photographs regarding staff concerns with the structural integrity of the buildingCambridge 233 PGC Building: Education Review Office collection of documents and photographs regarding staff concerns with the structural integrity of the building
          • Education Review Office
          • Stoop, Graham
            Exhibit
            Buildings - Representative Sample
            Cambridge 233
          2011-12-05-11- 09-5905 December 2011Cambridge 233 PGC Building: Department of Building and Housing Investigation of Key Building Performance Report - Appendix 4: Communication letter regarding refurbishmentCambridge 233 PGC Building: Department of Building and Housing Investigation of Key Building Performance Report - Appendix 4: Communication letter regarding refurbishment
            Pyne Gould Corporation Ltd
            Exhibit
            Buildings - Representative Sample
            Cambridge 233
          2011-11-28-15- 50-3828 November 2011Cambridge 233 PGC Building: Conversion plans and costs for PGC Group from Holmes Consulting Group to Warren and Mahoney, 17 February 1997Cambridge 233 PGC Building: Conversion plans and costs for PGC Group from Holmes Consulting Group to Warren and Mahoney, 17 February 1997
          • Holmes Consulting Group
          • Wilkinson, Grant
            Exhibit
            Buildings - Representative Sample
            Cambridge 233
          2011-11-28-15- 31-2528 November 2011Cambridge 233 PGC Building: Chronology of PGC Building from 1963 to 2011 Cambridge 233 PGC Building: Chronology of PGC Building from 1963 to 2011
            Canterbury Earthquakes Royal Commission
            Exhibit
            Buildings - Representative Sample
            Cambridge 233

          Search results navigation

          Displaying 1111 - 1130 of 1327 Items arrow left First arrow left Prev arrow right Next arrow right Last