Cambridge 233 PGC Building: Rapid Structural Assessment and Re-inspection after 4 September 2010
Browse other document categories
Summary
Rapid Structural Assessment and Re-inspection after 4 September 2010 by Holmes Consulting Group.
Available formats
Cambridge 233 PGC Building: Rapid Structural Assessment and Re-inspection after 4 September 2010PDF, 6 pages, 0.7 mbDate added to this website: 30 November 2011
About this document
Record ID | Attachment | Author(s) | Subject(s) | Building(s) | Action |
---|
To view other documents by the same author, or documents relating to the same subject or building choose one of the links above.