Forsyth Barr hearing: Specifications of work required to be done and the materials to be used for Landmark Tower
Browse other document categories
Summary
Specifications of work required to be done and the materials to be used for Landmark Tower, a new retail and office building - Permit application edition 4/3/88.
Hearing date 23 February 2012
Available formats
Forsyth Barr hearing: Specifications of work required to be done and the materials to be used for Landmark TowerPDF, 7 pages, 0.95 mbDate added to this website: 23 February 2012
About this document
Record ID | Attachment | Author(s) | Subject(s) | Building(s) | Action |
---|
To view other documents by the same author, or documents relating to the same subject or building choose one of the links above.