Lichfield 43 hearing: Engineering report by Powell Fenwick Consultants Ltd regarding earthquake damage to buildings at Ballantynes
Browse other document categories
Summary
Engineering report by Powell Fenwick Consultants Ltd regarding earthquake damage to buildings at Ballantynes dated 14 December with images attached.
Hearing date 27 February 2012
Available formats
Lichfield 43 hearing: Engineering report by Powell Fenwick Consultants Ltd regarding earthquake damage to buildings at BallantynesPDF, 11 pages, 0.75 mbDate added to this website: 12 March 2012
About this document
Record ID | Attachment | Author(s) | Subject(s) | Building(s) | Action |
---|
To view other documents by the same author, or documents relating to the same subject or building choose one of the links above.