Canterbury Earthquakes Royal Commission Te Komihana Rūwhenua o Waitaha Canterbury Earthquakes Royal Commission – Te Komihana Rūwhenua o Waitaha

Those who lost relatives and friends in the 22 February earthquake can be assured that there will be a very thorough inquiry into the failure of buildings that resulted in loss of life.
Chair, Justice Mark Cooper

Document library

Document categories

Additional filter options

Choose 1 or more filters then press 'Apply filter'
Reset

Search results

Published No sorted Title Not sorted Author(s) Not sorted Category Not sorted Subject(s) Sorted ascending Building(s) Not sorted Action
2011-10-20-10- 15-4520 October 2011Christchurch area showing waterways, swamps & vegetation cover in 1856 mapChristchurch area showing waterways, swamps & vegetation cover in 1856 map
  • Cass, Thomas
  • Thomas, J
    Submission
    Seismicity
    2011-10-21-13- 21-3721 October 2011Canterbury Earthquake Sequence and Implications for Seismic Design Levels: Peer Review by Professor Norman Abrahamson, July 2011Canterbury Earthquake Sequence and Implications for Seismic Design Levels: Peer Review by Professor Norman Abrahamson, July 2011
      Abrahamson, Norman
      Technical Report
      Seismicity
      2011-10-28-10- 43-0328 October 2011Scientific Understanding of the Canterbury Crustal Earthquakes from 4 September 2010 to their Closure on 21 June 2011: Submission by James Quinwallace, September 2011Scientific Understanding of the Canterbury Crustal Earthquakes from 4 September 2010 to their Closure on 21 June 2011: Submission by James Quinwallace, September 2011
        Quinwallace, James
        Submission
        Seismicity
        2011-10-20-13- 19-0620 October 2011GNS Science - The Canterbury Earthquake Sequence - Shaking measures by instruments versus distance, compared to NZ model - Presentation to the Canterbury Earthquakes Royal Commission by Dr Terry WebbGNS Science - The Canterbury Earthquake Sequence - Shaking measures by instruments versus distance, compared to NZ model - Presentation to the Canterbury Earthquakes Royal Commission by Dr Terry Webb
        • GNS Science
        • Webb, T H (Terry)
          Exhibit
          Seismicity
          2012-03-12-13- 02-1012 March 2012GNS Science - Implications for structural design motions: Presentation to the Canterbury Earthquakes Royal Commission, October 2011 - Slides 4 - 13GNS Science - Implications for structural design motions: Presentation to the Canterbury Earthquakes Royal Commission, October 2011 - Slides 4 - 13
          • GNS Science
          • McVerry, Graeme
            Exhibit
            Seismicity
            2012-11-28-12- 22-3228 November 2012Summary by Dr Terry Webb of recent seismic hazard modelling by GNS ScienceSummary by Dr Terry Webb of recent seismic hazard modelling by GNS Science
            • GNS Science
            • Webb, T H (Terry)
              Referenced Document
              Seismicity
              2012-03-12-13- 11-2812 March 2012Comments on Seismicity and Building Zone Factors: Submission by Ross Thomson, September 2011Comments on Seismicity and Building Zone Factors: Submission by Ross Thomson, September 2011
                Thomson, Ross
                Submission
                Seismicity
                2011-10-21-13- 17-3521 October 2011Canterbury Earthquake Sequence and Implications for Seismic Design Levels: Technical Report compiled by Dr Terry Webb of GNS Science, July 2011Canterbury Earthquake Sequence and Implications for Seismic Design Levels: Technical Report compiled by Dr Terry Webb of GNS Science, July 2011
                • GNS Science
                • Webb, T H (Terry)
                  Technical Report
                  Seismicity
                  2012-11-27-16- 18-3327 November 2012Science Advice for Critical Decision Making, book chapter by E.E. Doyle and D.M JohnstonScience Advice for Critical Decision Making, book chapter by E.E. Doyle and D.M Johnston
                  • Doyle, Emma E H
                  • Johnston, David M
                    Referenced Document
                    Seismicity
                    2012-03-12-13- 01-0112 March 2012GNS Science - Implications for structural design motions - February Spectra and NZS1170 design levels - four Geonet sites closest to CBD: Presentation to the Canterbury Earthquakes Royal Commission, October 2011GNS Science - Implications for structural design motions - February Spectra and NZS1170 design levels - four Geonet sites closest to CBD: Presentation to the Canterbury Earthquakes Royal Commission, October 2011
                    • GNS Science
                    • McVerry, Graeme
                      Exhibit
                      Seismicity
                      2011-10-19-15- 17-2419 October 2011Evaluation of the Z-factor and Christchurch Considering Earthquake clustering following the Darfield Earthquake - Page 30Evaluation of the Z-factor and Christchurch Considering Earthquake clustering following the Darfield Earthquake - Page 30
                        GNS Science
                        Exhibit
                        Seismicity
                        2011-10-21-13- 54-5921 October 2011Stairs and Access Ramps Between Floors in Multi-Storey Buildings: Technical Report by Des Bull, August 2011Stairs and Access Ramps Between Floors in Multi-Storey Buildings: Technical Report by Des Bull, August 2011
                        • Bull, Des
                        • Holmes Consulting Group
                          Technical Report
                          Stairs and Floors
                          2012-02-23-11- 40-2023 February 2012Forsyth Barr hearing: Investigation into the collapse of the Forsyth Barr building stairs on 22nd February 2011Forsyth Barr hearing: Investigation into the collapse of the Forsyth Barr building stairs on 22nd February 2011
                            Beca Carter Hollings & Ferner Ltd (Beca)
                            Opening Statement
                            Stairs and Floors
                            Colombo 764
                          2012-02-24-12- 38-4624 February 2012Forsyth Barr hearing: Hyland building stairs site examination and materials testForsyth Barr hearing: Hyland building stairs site examination and materials test
                          • Hyland Consultants Ltd
                          • Hyland, Clark
                            Opening Statement
                            Stairs and Floors
                            Colombo 764
                          2012-02-24-12- 45-0524 February 2012Forsyth Barr hearing: Practice advisory issued by DBH on the topic of egress stairsForsyth Barr hearing: Practice advisory issued by DBH on the topic of egress stairs
                            Department of Building and Housing
                            Opening Statement
                            Stairs and Floors
                            2011-12-05-15- 04-2205 December 2011Guidance on detailed engineering evaluation of earthquake affected non-residential buildings in Canterbury - Part 2: Evaluation procedure (revision 5Guidance on detailed engineering evaluation of earthquake affected non-residential buildings in Canterbury - Part 2: Evaluation procedure (revision 5
                              Engineering Advisory Group
                              Exhibit
                              Standards and Regulation
                              2012-08-15-11- 51-5015 August 2012Training and Education of Engineers and Organisation of the Engineering Profession: Joint submission from the Institution of Professional Engineers New Zealand (IPENZ) and the Association of Consulting Engineers New Zealand (ACENZ) on the Royal Commission Discussion Paper, July 2012Training and Education of Engineers and Organisation of the Engineering Profession: Joint submission from the Institution of Professional Engineers New Zealand (IPENZ) and the Association of Consulting Engineers New Zealand (ACENZ) on the Royal Commission Discussion Paper, July 2012
                              • Association of Consulting Engineers New Zealand
                              • Institution of Professional Engineers New Zealand (IPENZ)
                                Submission
                                Standards and Regulation
                                2011-11-14-14- 32-3814 November 2011Draft Policy on Earthquake-Prone Buildings: Letter by Sir Miles Warren, ArchitectDraft Policy on Earthquake-Prone Buildings: Letter by Sir Miles Warren, Architect
                                  Warren, Miles
                                  Exhibit
                                  Standards and Regulation
                                  2011-11-10-09- 29-1110 November 2011Letter from Tararua District Council about unreinforced masonry (URM) and earthquake-prone building policiesLetter from Tararua District Council about unreinforced masonry (URM) and earthquake-prone building policies
                                    King, Blair
                                    RFI Response
                                    Standards and Regulation
                                    2012-03-26-08- 54-2126 March 2012Comments on SESOC practice note "Design of Conventional Structural Systems Following the Canterbury Earthquakes": Submission by Dunning Thornton Consultants Ltd, March 2012Comments on SESOC practice note "Design of Conventional Structural Systems Following the Canterbury Earthquakes": Submission by Dunning Thornton Consultants Ltd, March 2012
                                      Dunning Thornton Consultants Ltd
                                      Submission
                                      Standards and Regulation

                                      Search results navigation

                                      Displaying 1415 - 1434 of 1689 items arrow left First arrow left Prev arrow right Next arrow right Last