Canterbury Earthquakes Royal Commission Te Komihana Rūwhenua o Waitaha Canterbury Earthquakes Royal Commission – Te Komihana Rūwhenua o Waitaha

Those who lost relatives and friends in the 22 February earthquake can be assured that there will be a very thorough inquiry into the failure of buildings that resulted in loss of life.
Chair, Justice Mark Cooper

Document library

Document categories

Additional filter options

Choose 1 or more filters then press 'Apply filter'
Reset

Search results

Published No sorted Title Not sorted Author(s) Not sorted Category Sorted descending Subject(s) Not sorted Building(s) Not sorted Action
2011-10-21-14- 38-1521 October 2011Foundations on Deep Alluvial Soils: Technical Report by Professor Misko Cubrinovski and Ian McCahon, August 2011Foundations on Deep Alluvial Soils: Technical Report by Professor Misko Cubrinovski and Ian McCahon, August 2011
  • Cubrinovski, Misko
  • Geotech Consulting Ltd
  • McCahon, Ian
  • University of Canterbury
    Technical Report
    Geotechnical
    2012-02-10-15- 12-2410 February 2012Ground Motion and Seismicity Aspects of 4 September 2010 Darfield and 22 February 2011 Christchurch Earthquakes: Technical report by Brendon Bradley of Bradley Seismic Ltd, January 2012Ground Motion and Seismicity Aspects of 4 September 2010 Darfield and 22 February 2011 Christchurch Earthquakes: Technical report by Brendon Bradley of Bradley Seismic Ltd, January 2012
    • Bradley Seismic Ltd
    • Bradley, Brendon
      Technical Report
      Seismicity
      2011-10-21-14- 25-0921 October 2011Performance of Unreinforced Masonry in the 2010/2011 Canterbury Earthquake Swarm: Peer Review by Fred Turner, August 2011Performance of Unreinforced Masonry in the 2010/2011 Canterbury Earthquake Swarm: Peer Review by Fred Turner, August 2011
        Turner, Fred
        Technical Report
        Unreinforced Masonry Buildings (URM)
        2011-10-21-14- 30-3321 October 2011System of Building Controls - Appendix A, Section 4: Building Act tools for the upgrading of the structural performance of buildings - Earthquake-Prone Building Provisions of the Building Act 2004: Policy Guidance for Territorial Authorities: Technical Report by Department of Building and Housing, June 2005System of Building Controls - Appendix A, Section 4: Building Act tools for the upgrading of the structural performance of buildings - Earthquake-Prone Building Provisions of the Building Act 2004: Policy Guidance for Territorial Authorities: Technical Report by Department of Building and Housing, June 2005
          Department of Building and Housing
          Technical Report
          Standards and Regulation
          2012-02-28-16- 23-0028 February 2012Base Isolation and Damage-Resistant Technologies for Improved Seismic Performance of Buildings: Technical Report by Andrew H Buchanan, Des Bull, Rajesh P Dhakal, Gregory MacRae, Alessandro Palermo and Stefano Pampanin, August 2011Base Isolation and Damage-Resistant Technologies for Improved Seismic Performance of Buildings: Technical Report by Andrew H Buchanan, Des Bull, Rajesh P Dhakal, Gregory MacRae, Alessandro Palermo and Stefano Pampanin, August 2011
          • Buchanan, Andrew H
          • Bull, Des
          • Dhakal, Rajesh P
          • MacRae, Gregory
          • Palermo, Alessandro
          • Pampanin, Stefano
            Technical Report
          • Building Failure
          • Engineering
          • New Building Technologies
            2011-10-21-14- 34-5821 October 2011Preliminary Observations from Christchurch Earthquakes: Technical Report by John Hare in conjunction with Structural Engineering Society of New Zealand, August 2011Preliminary Observations from Christchurch Earthquakes: Technical Report by John Hare in conjunction with Structural Engineering Society of New Zealand, August 2011
              Structural Engineering Society of New Zealand
              Technical Report
              Engineering
              2012-02-14-08- 13-2414 February 2012CTV Building Collapse Investigation reports prepared for the Department of Building and Housing CTV Building Collapse Investigation reports prepared for the Department of Building and Housing
              • Department of Building and Housing
              • Hyland Consultants Ltd
              • Structure Smith Consulting Engineers
                Technical Report
              • Building Failure
              • Buildings - Representative Sample
                Madras 249
              2011-10-21-14- 11-0421 October 2011System of Building Controls - Appendix A, Section 5: rapid assessment of buildings during a state of emergency - Building safety evaluation during a state of emergency - Guidelines for Territorial Authorities: Technical Report by New Zealand Society for Earthquake Engineering, August 2009System of Building Controls - Appendix A, Section 5: rapid assessment of buildings during a state of emergency - Building safety evaluation during a state of emergency - Guidelines for Territorial Authorities: Technical Report by New Zealand Society for Earthquake Engineering, August 2009
              • Department of Building and Housing
              • New Zealand Society for Earthquake Engineering
                Technical Report
              • Emergency Powers and Procedures
              • Safety Evaluation
              • Standards and Regulation
                2011-12-21-14- 12-0121 December 2011Practice Note - Design of Conventional Structural Systems Following Canterbury Earthquakes: Submission by Structural Engineering Society of New Zealand, December 2011Practice Note - Design of Conventional Structural Systems Following Canterbury Earthquakes: Submission by Structural Engineering Society of New Zealand, December 2011
                  Structural Engineering Society of New Zealand
                  Technical Report
                  Engineering
                  2012-04-05-14- 02-2405 April 2012Heritage Buildings, Earthquake Strengthening and Damage: The Canterbury Earthquakes September 2010-January 2012: Technical report by Robert McClean and NZHPTHeritage Buildings, Earthquake Strengthening and Damage: The Canterbury Earthquakes September 2010-January 2012: Technical report by Robert McClean and NZHPT
                    New Zealand Historic Places Trust
                    Technical Report
                    Unreinforced Masonry Buildings (URM)
                    2011-11-07-13- 16-1707 November 2011Independent Review of the Response to the Canterbury Earthquake, 4 September 2010: Technical report commissioned by Ministry of Civil Defence & Emergency Management, May 2011Independent Review of the Response to the Canterbury Earthquake, 4 September 2010: Technical report commissioned by Ministry of Civil Defence & Emergency Management, May 2011
                    • Middleton, David
                    • Westlake, Richard
                      Technical Report
                      Christchurch Recovery
                      2011-10-21-12- 50-0821 October 2011System of Building Controls: Letter by Department of Building and Housing to Royal Commission regarding requested documents relating to building failure caused by Canterbury earthquakes, May 2011System of Building Controls: Letter by Department of Building and Housing to Royal Commission regarding requested documents relating to building failure caused by Canterbury earthquakes, May 2011
                      • Bach, Katrina
                      • Department of Building and Housing
                        Technical Report
                      • Building Failure
                      • Engineering
                      • Standards and Regulation
                        2011-10-21-14- 23-0421 October 2011Heritage earthquake prone building strengthening cost study: Technical report by John Hare of Holmes Consulting Group, June 2009Heritage earthquake prone building strengthening cost study: Technical report by John Hare of Holmes Consulting Group, June 2009
                        • Hare, John
                        • Holmes Consulting Group
                          Technical Report
                        • Culture and Heritage
                        • Engineering
                          2011-10-21-12- 52-2221 October 2011Probabilities of aftershocks and larger events for the 2010 Darfield earthquake based on average behaviour of New Zealand earthquakes: Technical Report by GNS Science, 2011Probabilities of aftershocks and larger events for the 2010 Darfield earthquake based on average behaviour of New Zealand earthquakes: Technical Report by GNS Science, 2011
                            GNS Science
                            Technical Report
                            Seismicity
                            2012-02-28-16- 23-5828 February 2012Structural Design for Earthquake Resistance - Past, Present and Future of Seismic Design: Technical Report by Associate Professor Rajesh P Dhakal, August 2011Structural Design for Earthquake Resistance - Past, Present and Future of Seismic Design: Technical Report by Associate Professor Rajesh P Dhakal, August 2011
                              Dhakal, Rajesh P
                              Technical Report
                            • Engineering
                            • New Building Technologies
                              2011-10-21-13- 54-5921 October 2011Stairs and Access Ramps Between Floors in Multi-Storey Buildings: Technical Report by Des Bull, August 2011Stairs and Access Ramps Between Floors in Multi-Storey Buildings: Technical Report by Des Bull, August 2011
                              • Bull, Des
                              • Holmes Consulting Group
                                Technical Report
                              • Engineering
                              • Stairs and Floors
                                2011-11-04-15- 00-0004 November 2011The Civil Defence Emergency Management Framework and Response to the 22 February Christchurch Earthquake: Technical report by the Ministry of Civil Defence & Emergency Management, October 2011The Civil Defence Emergency Management Framework and Response to the 22 February Christchurch Earthquake: Technical report by the Ministry of Civil Defence & Emergency Management, October 2011
                                  Ministry of Civil Defence and Emergency
                                  Technical Report
                                • Emergency Powers and Procedures
                                • Safety Evaluation
                                • Standards and Regulation
                                  2011-11-03-16- 05-4003 November 2011Performance of Unreinforced Masonry in the 2010/2011 Canterbury Earthquake Swarm: Technical Report by Associate Professor Jason M Ingham and Professor Michael C Griffith, August 2011Performance of Unreinforced Masonry in the 2010/2011 Canterbury Earthquake Swarm: Technical Report by Associate Professor Jason M Ingham and Professor Michael C Griffith, August 2011
                                  • Griffith, Michael C
                                  • Ingham, Jason M
                                    Technical Report
                                    Unreinforced Masonry Buildings (URM)
                                    2011-10-21-13- 58-1421 October 2011System of Building Controls - Appendix A, Section 6 - Investigation by the Department of Building and Housing into the building collapses - Technical investigation into the performance of buildings in the Christchurch CBD in the 22 February Christchurch aftershock: Technical Report by Department of Building and Housing, September 2011System of Building Controls - Appendix A, Section 6 - Investigation by the Department of Building and Housing into the building collapses - Technical investigation into the performance of buildings in the Christchurch CBD in the 22 February Christchurch aftershock: Technical Report by Department of Building and Housing, September 2011
                                      Department of Building and Housing
                                      Technical Report
                                    • Building Failure
                                    • Standards and Regulation
                                      2011-11-04-14- 48-5304 November 2011Building Evaluation Transition Team - Processes Used and Lessons Learnt Following the Darfield Earthquake of 4 September 2010: Technical Report by Esther Griffiths of Sisirc Consulting Limited and Deane McNulty of McNulty Engineering Management Limited, January 2011 Building Evaluation Transition Team - Processes Used and Lessons Learnt Following the Darfield Earthquake of 4 September 2010: Technical Report by Esther Griffiths of Sisirc Consulting Limited and Deane McNulty of McNulty Engineering Management Limited, January 2011
                                      • Griffiths, Esther
                                      • McNulty, Deane
                                        Technical Report
                                        Christchurch Recovery

                                        Search results navigation

                                        Displaying 113 - 132 of 1356 items arrow left First arrow left Prev arrow right Next arrow right Last