Canterbury Earthquakes Royal Commission Te Komihana Rūwhenua o Waitaha Canterbury Earthquakes Royal Commission – Te Komihana Rūwhenua o Waitaha

Those who lost relatives and friends in the 22 February earthquake can be assured that there will be a very thorough inquiry into the failure of buildings that resulted in loss of life.
Chair, Justice Mark Cooper

Document library

Document categories

Additional filter options

Choose 1 or more filters then press 'Apply filter'
Reset

Search results

Published No sorted Title Sorted descending Author(s) Not sorted Category Not sorted Subject(s) Not sorted Building(s) Not sorted Action
2011-11-2828 November 2011Cambridge 233 PGC Building: Level one structural plan and inferred collapse sequenceCambridge 233 PGC Building: Level one structural plan and inferred collapse sequence
    Beca Carter Hollings and Ferner Ltd (BECA)
    Exhibit
    Buildings - Representative Sample
    Cambridge 233
2011-11-2828 November 2011Cambridge 233 PGC Building: Letter and documents from Holmes Consulting Group regarding information on the PGC BuildingCambridge 233 PGC Building: Letter and documents from Holmes Consulting Group regarding information on the PGC Building
  • Black, Bruce
  • Hare, John
  • Holmes Consulting Group
    Exhibit
    Buildings - Representative Sample
    Cambridge 233
2011-11-2828 November 2011Cambridge 233 PGC Building: Email correspondence between Education Review Office, tenants at 233 Cambridge Terrace, and NAI Harcourts regarding removal of Level 3 ceiling tilesCambridge 233 PGC Building: Email correspondence between Education Review Office, tenants at 233 Cambridge Terrace, and NAI Harcourts regarding removal of Level 3 ceiling tiles
  • Education Review Office
  • Harcourt Insulation (2006) Ltd
    Exhibit
    Buildings - Representative Sample
    Cambridge 233
2011-11-2828 November 2011Cambridge 233 PGC Building: Email correspondence between Education Review Office, tenants at 233 Cambridge Terrace, and NAI Harcourts regarding ceiling inspection and repairCambridge 233 PGC Building: Email correspondence between Education Review Office, tenants at 233 Cambridge Terrace, and NAI Harcourts regarding ceiling inspection and repair
  • Education Review Office
  • Harcourt Insulation (2006) Ltd
    Exhibit
    Buildings - Representative Sample
    Cambridge 233
2012-03-0606 March 2012Cambridge 233 PGC Building: Education Review Office collection of documents and photographs regarding staff concerns with the structural integrity of the buildingCambridge 233 PGC Building: Education Review Office collection of documents and photographs regarding staff concerns with the structural integrity of the building
  • Education Review Office
  • Stoop, Graham
    Exhibit
    Buildings - Representative Sample
    Cambridge 233
2011-12-0505 December 2011Cambridge 233 PGC Building: Department of Building and Housing Investigation of Key Building Performance Report - Appendix 4: Communication letter regarding refurbishmentCambridge 233 PGC Building: Department of Building and Housing Investigation of Key Building Performance Report - Appendix 4: Communication letter regarding refurbishment
    Pyne Gould Corporation Ltd
    Exhibit
    Buildings - Representative Sample
    Cambridge 233
2011-11-2828 November 2011Cambridge 233 PGC Building: Conversion plans and costs for PGC Group from Holmes Consulting Group to Warren and Mahoney, 17 February 1997Cambridge 233 PGC Building: Conversion plans and costs for PGC Group from Holmes Consulting Group to Warren and Mahoney, 17 February 1997
  • Holmes Consulting Group
  • Wilkinson, Grant
    Exhibit
    Buildings - Representative Sample
    Cambridge 233
2011-11-2828 November 2011Cambridge 233 PGC Building: Chronology of PGC Building from 1963 to 2011 Cambridge 233 PGC Building: Chronology of PGC Building from 1963 to 2011
    Canterbury Earthquakes Royal Commission
    Exhibit
    Buildings - Representative Sample
    Cambridge 233
2011-11-2929 November 2011Cambridge 233 PGC Building: Chronology from 1963 to 2011Cambridge 233 PGC Building: Chronology from 1963 to 2011
    Canterbury Earthquakes Royal Commission
    Exhibit
    Buildings - Representative Sample
    Cambridge 233
2012-08-3030 August 2012Cambridge 233 PGC Building - Letter from Buddle Findlay to Christchurch City Council confirming sale proceeds for the Cambridge House tender had been passed to Council.Cambridge 233 PGC Building - Letter from Buddle Findlay to Christchurch City Council confirming sale proceeds for the Cambridge House tender had been passed to Council.
  • Buchan, John
  • Buddle Findlay
    Exhibit
    Buildings - Representative Sample
    Cambridge 233
2011-11-2828 November 2011Building Safety Evaluation Following the Canterbury Earthquakes: Technical report by the New Zealand Society for Earthquake Engineering, September 2011Building Safety Evaluation Following the Canterbury Earthquakes: Technical report by the New Zealand Society for Earthquake Engineering, September 2011
  • Brunsdon, Dave
  • New Zealand Society for Earthquake Engineering
  • Exhibit
  • Technical Report
  • Building Failure
  • Safety Evaluation
    2012-09-0404 September 2012Building Management after Eathquakes hearing: Collection of documents in relation to building demolition at 192 Madras StreetBuilding Management after Eathquakes hearing: Collection of documents in relation to building demolition at 192 Madras Street
    • Various
    • White Fox & Jones Lawyers
      Exhibit
      Building assessments after earthquakes
      Madras 192
    2012-09-0404 September 2012Building Management after Earthquakes hearing: Presentation by Peter Woods, Ministry of Civil Defence and Emergency ManagementBuilding Management after Earthquakes hearing: Presentation by Peter Woods, Ministry of Civil Defence and Emergency Management
    • Ministry of Civil Defence & Emergency Management
    • Woods, Peter
      Exhibit
      Building assessments after earthquakes
      2012-09-0303 September 2012Building Management after Earthquakes hearing: Presentation by Ken Gledhill on Enhance Earthquake Information. Building Management after Earthquakes hearing: Presentation by Ken Gledhill on Enhance Earthquake Information.
        Gledhill, Ken
        Exhibit
        Building assessments after earthquakes
        2012-09-0303 September 2012Building Management after Earthquakes hearing: Presentation by Dave Brunsdon, FIPENZ on the Evaluation and Management of Buildings Following EarthquakesBuilding Management after Earthquakes hearing: Presentation by Dave Brunsdon, FIPENZ on the Evaluation and Management of Buildings Following Earthquakes
          Brunsdon, Dave
          Exhibit
          Building assessments after earthquakes
          2012-09-0303 September 2012Building Management after Earthquakes hearing: Presentation by Bret Lizundia on The Evaluation and Management of Buildings Following EarthquakesBuilding Management after Earthquakes hearing: Presentation by Bret Lizundia on The Evaluation and Management of Buildings Following Earthquakes
            Lizundia, Bret
            Exhibit
            Building assessments after earthquakes
            2012-09-0404 September 2012Building Management after Earthquakes hearing: Memorandum of counsel for Christchurch City CouncilBuilding Management after Earthquakes hearing: Memorandum of counsel for Christchurch City Council
              Christchurch City Council
              Exhibit
              Building assessments after earthquakes
              2012-09-0404 September 2012Building Management after Earthquakes hearing: Christchurch City Council Report into Building Safety Evaluation Processes in the Central Business District following the 22 February 2011 EarthquakeBuilding Management after Earthquakes hearing: Christchurch City Council Report into Building Safety Evaluation Processes in the Central Business District following the 22 February 2011 Earthquake
                Christchurch City Council
                Exhibit
                Building assessments after earthquakes
                2012-09-0404 September 2012Building Management after Earthquakes hearing: Building Evaluation and Occupancy Assessment flowchartsBuilding Management after Earthquakes hearing: Building Evaluation and Occupancy Assessment flowcharts
                  Department of Building and Housing
                  Exhibit
                  Building assessments after earthquakes
                  2011-11-0707 November 2011Building Act 2004: New Zealand Parliament, 2004 (Reprint 1 January 2011)Building Act 2004: New Zealand Parliament, 2004 (Reprint 1 January 2011)
                    New Zealand Parliament
                    Exhibit
                    Standards and Regulation

                    Search results navigation

                    Displaying 737 - 756 of 802 items arrow left First arrow left Prev arrow right Next arrow right Last