Canterbury Earthquakes Royal Commission Te Komihana Rūwhenua o Waitaha Canterbury Earthquakes Royal Commission – Te Komihana Rūwhenua o Waitaha

Those who lost relatives and friends in the 22 February earthquake can be assured that there will be a very thorough inquiry into the failure of buildings that resulted in loss of life.
Chair, Justice Mark Cooper

Document library

Document categories

Additional filter options

Choose 1 or more filters then press 'Apply filter'
Reset

Search results

Published No sorted Title Not sorted Author(s) Not sorted Category Not sorted Subject(s) Sorted descending Building(s) Not sorted Action
21 October 2011System of Building Controls - Appendix A, Section 5: rapid assessment of buildings during a state of emergency - Building safety evaluation during a state of emergency - Guidelines for Territorial Authorities: Technical Report by New Zealand Society for Earthquake Engineering, August 2009System of Building Controls - Appendix A, Section 5: rapid assessment of buildings during a state of emergency - Building safety evaluation during a state of emergency - Guidelines for Territorial Authorities: Technical Report by New Zealand Society for Earthquake Engineering, August 2009
  • Department of Building and Housing
  • New Zealand Society for Earthquake Engineering
    Technical Report
    Emergency Powers and Procedures
    04 November 2011The Civil Defence Emergency Management Framework and Response to the 22 February Christchurch Earthquake: Technical report by the Ministry of Civil Defence & Emergency Management, October 2011The Civil Defence Emergency Management Framework and Response to the 22 February Christchurch Earthquake: Technical report by the Ministry of Civil Defence & Emergency Management, October 2011
      Ministry of Civil Defence and Emergency
      Technical Report
      Emergency Powers and Procedures
      07 November 2011Independent Review of the Response to the Canterbury Earthquake, 4 September 2010: Technical report commissioned by Ministry of Civil Defence & Emergency Management, May 2011Independent Review of the Response to the Canterbury Earthquake, 4 September 2010: Technical report commissioned by Ministry of Civil Defence & Emergency Management, May 2011
      • Middleton, David
      • Westlake, Richard
        Technical Report
        Emergency Powers and Procedures
        21 October 2011Heritage earthquake prone building strengthening cost study: Technical report by John Hare of Holmes Consulting Group, June 2009Heritage earthquake prone building strengthening cost study: Technical report by John Hare of Holmes Consulting Group, June 2009
        • Hare, John
        • Holmes Consulting Group
          Technical Report
          Culture and Heritage
          07 November 2011Independent Review of the Response to the Canterbury Earthquake, 4 September 2010: Technical report commissioned by Ministry of Civil Defence & Emergency Management, May 2011Independent Review of the Response to the Canterbury Earthquake, 4 September 2010: Technical report commissioned by Ministry of Civil Defence & Emergency Management, May 2011
          • Middleton, David
          • Westlake, Richard
            Technical Report
            Civil Defence
            07 November 2011Independent Review of the Response to the Canterbury Earthquake, 4 September 2010: Technical report commissioned by Ministry of Civil Defence & Emergency Management, May 2011Independent Review of the Response to the Canterbury Earthquake, 4 September 2010: Technical report commissioned by Ministry of Civil Defence & Emergency Management, May 2011
            • Middleton, David
            • Westlake, Richard
              Technical Report
              Christchurch Recovery
              04 November 2011Building Evaluation Transition Team - Processes Used and Lessons Learnt Following the Darfield Earthquake of 4 September 2010: Technical Report by Esther Griffiths of Sisirc Consulting Limited and Deane McNulty of McNulty Engineering Management Limited, January 2011 Building Evaluation Transition Team - Processes Used and Lessons Learnt Following the Darfield Earthquake of 4 September 2010: Technical Report by Esther Griffiths of Sisirc Consulting Limited and Deane McNulty of McNulty Engineering Management Limited, January 2011
              • Griffiths, Esther
              • McNulty, Deane
                Technical Report
                Christchurch Recovery
                07 November 2011Independent Review of the Response to the Canterbury Earthquake, 4 September 2010: Technical report commissioned by Ministry of Civil Defence & Emergency Management, May 2011Independent Review of the Response to the Canterbury Earthquake, 4 September 2010: Technical report commissioned by Ministry of Civil Defence & Emergency Management, May 2011
                • Middleton, David
                • Westlake, Richard
                  Technical Report
                  Christchurch Recovery
                  12 March 2012Department of Building and Housing Technical Investigation Reports: Peer review by William Holmes, November 2011Department of Building and Housing Technical Investigation Reports: Peer review by William Holmes, November 2011
                  • Holmes, William T
                  • Rutherford & Chekene
                  • Exhibit
                  • Technical Report
                    Central Business District (CBD)
                  • Cambridge 233
                  • Cashel 161
                  • Colombo 764
                  14 November 2011Steel Building Damage From The Christchurch Earthquake Series of 2010 and 2011: Technical Report by Charles Clifton, Michel Bruneau, Alistair Fussell, Roberto Leon and Greg MacRae, November 2011Steel Building Damage From The Christchurch Earthquake Series of 2010 and 2011: Technical Report by Charles Clifton, Michel Bruneau, Alistair Fussell, Roberto Leon and Greg MacRae, November 2011
                  • Bruneau, Michel
                  • Clifton, Charles
                  • Fussell, Alistair
                  • Leon, Roberto
                  • MacRae, Gregory
                    Technical Report
                    Buildings - Representative Sample
                    02 December 2011Department of Building and Housing Expert Panel Report on the PGC, Forsyth Barr and Hotel Grand Chancellor Buildings, released 30 September 2011Department of Building and Housing Expert Panel Report on the PGC, Forsyth Barr and Hotel Grand Chancellor Buildings, released 30 September 2011
                      Department of Building and Housing
                      Technical Report
                      Buildings - Representative Sample
                    • Cambridge 233
                    • Cashel 161
                    • Colombo 764
                    14 February 2012CTV Building Collapse Investigation reports prepared for the Department of Building and Housing CTV Building Collapse Investigation reports prepared for the Department of Building and Housing
                    • Department of Building and Housing
                    • Hyland Consultants Ltd
                    • Structure Smith Consulting Engineers
                      Technical Report
                      Buildings - Representative Sample
                      Madras 249
                    25 June 2012CTV Building hearing: CTV Building Collapse Investigation Report by Dr Clark Hyland and Ashley Smith, January 2012CTV Building hearing: CTV Building Collapse Investigation Report by Dr Clark Hyland and Ashley Smith, January 2012
                    • Hyland Consultants Ltd
                    • Hyland, Clark
                    • Smith, Ashley
                    • Structure Smith Consulting Engineers
                    • Exhibit
                    • Technical Report
                      Buildings - Representative Sample
                      Madras 249
                    25 October 2012Independent Assessment on Earthquake Performance of Craigs Investment Partners House - 90 Armagh Street: Report prepared by Peter Smith and Jonathan Devine of Spencer Holmes Limited, February 2012Independent Assessment on Earthquake Performance of Craigs Investment Partners House - 90 Armagh Street: Report prepared by Peter Smith and Jonathan Devine of Spencer Holmes Limited, February 2012
                    • Devine, Jonathan
                    • Smith, Peter
                    • Spencer Holmes Ltd
                      Technical Report
                      Buildings - Representative Sample
                      Armagh 90
                    26 October 2012Detailed Engineering Evaluation of Christchurch Women's Hospital provided to the Royal Commission by Holmes Consulting Group in May 2012Detailed Engineering Evaluation of Christchurch Women's Hospital provided to the Royal Commission by Holmes Consulting Group in May 2012
                      Holmes Consulting Group
                      Technical Report
                      Buildings - Representative Sample
                      Riccarton Ave 2
                    26 October 2012Independent Assessment on Earthquake Performance of Gallery Apartments - 62 Gloucester Street: Report by Peter Smith and Vaughan England of Spencer Holmes Limited, February 2012Independent Assessment on Earthquake Performance of Gallery Apartments - 62 Gloucester Street: Report by Peter Smith and Vaughan England of Spencer Holmes Limited, February 2012
                    • Smith, Peter
                    • Spencer Holmes Ltd
                      Technical Report
                      Buildings - Representative Sample
                      Gloucester 62
                    17 January 2012Hotel Grand Chancellor hearing: Report on the Structural Performance of the Hotel Grand Chancellor in the Earthquake of 22 February 2011Hotel Grand Chancellor hearing: Report on the Structural Performance of the Hotel Grand Chancellor in the Earthquake of 22 February 2011
                      Dunning Thornton Consultants Ltd
                      Technical Report
                      Buildings - Representative Sample
                      Cashel 161
                    26 October 2012Independent Assessment on Earthquake Performance of Bedford Row car park building - 20 Bedford Row: Report by Peter Smith and Jonathan Devine of Spencer Holmes Limited, January 2012Independent Assessment on Earthquake Performance of Bedford Row car park building - 20 Bedford Row: Report by Peter Smith and Jonathan Devine of Spencer Holmes Limited, January 2012
                    • Devine, Jonathan
                    • Smith, Peter
                    • Spencer Holmes Ltd
                      Technical Report
                      Buildings - Representative Sample
                      Bedford 20
                    26 October 2012Seismic Performance Investigation Draft Report of Clarendon Tower - 78 Worcester Street: Report by Bill Holmes and Reid Zimmerman of Rutherford & Chekene, February 2012Seismic Performance Investigation Draft Report of Clarendon Tower - 78 Worcester Street: Report by Bill Holmes and Reid Zimmerman of Rutherford & Chekene, February 2012
                    • Holmes, William T
                    • Rutherford & Chekene
                    • Zimmerman, Reid
                      Technical Report
                      Buildings - Representative Sample
                      Worcester 78
                    26 October 2012Independent Assessment on Earthquake Performance of 151 Worcester Street: Report by Peter Smith and Jonathan Devine of Spencer Holmes Limited, December 2011Independent Assessment on Earthquake Performance of 151 Worcester Street: Report by Peter Smith and Jonathan Devine of Spencer Holmes Limited, December 2011
                    • Devine, Jonathan
                    • Smith, Peter
                    • Spencer Holmes Ltd
                      Technical Report
                      Buildings - Representative Sample
                      Worcester 151

                    Search results navigation

                    Displaying 70 - 89 of 106 items arrow left First arrow left Prev arrow right Next arrow right Last