Canterbury Earthquakes Royal Commission Te Komihana Rūwhenua o Waitaha Canterbury Earthquakes Royal Commission – Te Komihana Rūwhenua o Waitaha

Those who lost relatives and friends in the 22 February earthquake can be assured that there will be a very thorough inquiry into the failure of buildings that resulted in loss of life.
Chair, Justice Mark Cooper

Document library

Document categories

Additional filter options

Choose 1 or more filters then press 'Apply filter'
Reset

Search results

Published No sorted Title Not sorted Author(s) Not sorted Category Not sorted Subject(s) Sorted descending Building(s) Not sorted Action
31 January 2012Durham 309 hearing: Photographs of church exterior and interior taken post 4 September 2010 earthquake Durham 309 hearing: Photographs of church exterior and interior taken post 4 September 2010 earthquake
    Ross Becker Photography
    Exhibit
    Buildings - Representative Sample
    Durham 309
31 January 2012Durham 309 hearing: Photographs of buildingDurham 309 hearing: Photographs of building
    Christchurch City Council
    Exhibit
    Buildings - Representative Sample
    Durham 309
02 February 2012Colombo 603 and 605-613 hearing: Statement of Michael Fletcher regarding 605 Colombo StreetColombo 603 and 605-613 hearing: Statement of Michael Fletcher regarding 605 Colombo Street
    Fletcher, Mike
    Exhibit
    Buildings - Representative Sample
  • Colombo 603
  • Colombo 605
  • Colombo 615
01 February 2012Colombo 603 and 605-613 hearing: Statement of John Victor DallisonColombo 603 and 605-613 hearing: Statement of John Victor Dallison
    Dallison, John
    Exhibit
    Buildings - Representative Sample
    Colombo 603
15 February 2012High 246 hearing: Independent Assessment on Earthquake Performance of 246 High Street: Report by Peter Smith and Jonathan Devine of Spencer Holmes LtdHigh 246 hearing: Independent Assessment on Earthquake Performance of 246 High Street: Report by Peter Smith and Jonathan Devine of Spencer Holmes Ltd
  • Devine, Jonathan
  • Smith, Peter
  • Spencer Holmes Ltd
    Exhibit
    Buildings - Representative Sample
    High 246
08 August 2012CTV Building hearing: Structural Specification document produced by Alan Reay ConsultantsCTV Building hearing: Structural Specification document produced by Alan Reay Consultants
    Reay, Alan
    Exhibit
    Buildings - Representative Sample
    Madras 249
06 March 2012Colombo 738 hearing: Independent Assessment on Earthquake Performance of 738 Colombo Street: Report by Peter Smith and Jonathan Devine of Spencer Holmes Ltd, December 2011Colombo 738 hearing: Independent Assessment on Earthquake Performance of 738 Colombo Street: Report by Peter Smith and Jonathan Devine of Spencer Holmes Ltd, December 2011
  • Devine, Jonathan
  • Smith, Peter
  • Spencer Holmes Ltd
    Exhibit
    Buildings - Representative Sample
    Colombo 738
14 February 2012Colombo 601/601A hearing: Statement of Marton David SinclairColombo 601/601A hearing: Statement of Marton David Sinclair
    Sinclair, Marton
    Exhibit
    Buildings - Representative Sample
  • Colombo 601
  • Colombo 601A
28 February 2012Manchester 265-271 (Gloucester 173) hearing: Independent Assessment on Earthquake Performance of 173 Gloucester Street (255-271 Manchester Street): Report by Peter Smith and Jonathan Devine of Spencer Holmes Ltd, January 2012Manchester 265-271 (Gloucester 173) hearing: Independent Assessment on Earthquake Performance of 173 Gloucester Street (255-271 Manchester Street): Report by Peter Smith and Jonathan Devine of Spencer Holmes Ltd, January 2012
  • Devine, Jonathan
  • Smith, Peter
  • Spencer Holmes Ltd
    Exhibit
    Buildings - Representative Sample
  • Gloucester 173
  • Manchester 265-271
15 February 2012High 246 hearing: Statement of Evidence of Linda Joyce EdwardsHigh 246 hearing: Statement of Evidence of Linda Joyce Edwards
    Edwards, Linda Joyce
    Exhibit
    Buildings - Representative Sample
    High 246
14 February 2012Colombo 601/601A hearing: Further statement of Marton David SinclairColombo 601/601A hearing: Further statement of Marton David Sinclair
    Sinclair, Marton
    Exhibit
    Buildings - Representative Sample
  • Colombo 601
  • Colombo 601A
15 February 2012High 246 hearing: Brief of Evidence of Jeffrey Gavin MatthewsHigh 246 hearing: Brief of Evidence of Jeffrey Gavin Matthews
    Matthews, Jeff
    Exhibit
    Buildings - Representative Sample
    High 246
15 February 2012High 246 hearing: Brief of Evidence of Alistair Geoffrey BoysHigh 246 hearing: Brief of Evidence of Alistair Geoffrey Boys
    Boys, Alistair
    Exhibit
    Buildings - Representative Sample
    High 246
15 February 2012High 246 hearing: Brief of Evidence of Bruce Duncan GallowayHigh 246 hearing: Brief of Evidence of Bruce Duncan Galloway
    Galloway, Bruce
    Exhibit
    Buildings - Representative Sample
    High 246
25 July 2012CTV Building hearing: Site investigation report for a proposed development at 249 Madras Street, prepared by Soils & Foundations for Alan M. ReayCTV Building hearing: Site investigation report for a proposed development at 249 Madras Street, prepared by Soils & Foundations for Alan M. Reay
    Soils & Foundations Ltd
    Exhibit
    Buildings - Representative Sample
    Madras 249
13 February 2012Colombo 595 hearing: Christchurch City Council documents Colombo 595 hearing: Christchurch City Council documents
  • Christchurch City Council
  • Lust, Endel
    Exhibit
    Buildings - Representative Sample
    Colombo 595
14 February 2012Colombo 601/601A hearing: Statement of John Victor DallisonColombo 601/601A hearing: Statement of John Victor Dallison
    Dallison, John
    Exhibit
    Buildings - Representative Sample
  • Colombo 601
  • Colombo 601A
15 February 2012High 246 hearing: Brief of Evidence of Christopher Philip ChapmanHigh 246 hearing: Brief of Evidence of Christopher Philip Chapman
    Chapman, Chris
    Exhibit
    Buildings - Representative Sample
    High 246
15 February 2012High 246 hearing: Statement of Henriette NassHigh 246 hearing: Statement of Henriette Nass
    Nass, Henriette
    Exhibit
    Buildings - Representative Sample
    High 246
24 February 2012Forsyth Barr hearing: Quotation for renovation work in stairwells of Forsyth Barr BuildingForsyth Barr hearing: Quotation for renovation work in stairwells of Forsyth Barr Building
  • Christian, Andrew
  • Pace Project Management Ltd
    Exhibit
    Buildings - Representative Sample
    Colombo 764

Search results navigation

Displaying 619 - 638 of 918 items arrow left First arrow left Prev arrow right Next arrow right Last