Canterbury Earthquakes Royal Commission Te Komihana Rūwhenua o Waitaha Canterbury Earthquakes Royal Commission – Te Komihana Rūwhenua o Waitaha

Those who lost relatives and friends in the 22 February earthquake can be assured that there will be a very thorough inquiry into the failure of buildings that resulted in loss of life.
Chair, Justice Mark Cooper

Document library

Document categories

Additional filter options

Choose 1 or more filters then press 'Apply filter'
Reset

Search results

Published No sorted Title Not sorted Author(s) Not sorted Category Not sorted Subject(s) Sorted ascending Building(s) Not sorted Action
2012-10-2626 October 2012 Independent Assessment of Earthquake Performance of Inland Revenue Building - 224 Cashel Street: Report prepared by Peter Smith and Jonathan Devine of Spencer Holmes Limited Independent Assessment of Earthquake Performance of Inland Revenue Building - 224 Cashel Street: Report prepared by Peter Smith and Jonathan Devine of Spencer Holmes Limited
  • Devine, Jonathan
  • Smith, Peter
  • Spencer Holmes Ltd
    Technical Report
    Buildings - Representative Sample
    Cashel 224
2012-03-1212 March 2012Department of Building and Housing Technical Investigation Reports: Peer review by William Holmes, November 2011Department of Building and Housing Technical Investigation Reports: Peer review by William Holmes, November 2011
  • Holmes, William T
  • Rutherford & Chekene
  • Exhibit
  • Technical Report
    Buildings - Representative Sample
  • Cambridge 233
  • Cashel 161
  • Colombo 764
2011-11-1515 November 2011Letter from the Department of Building and Housing about the Forsyth Barr building report, November 2011Letter from the Department of Building and Housing about the Forsyth Barr building report, November 2011
  • Department of Building and Housing
  • Hopkins, David
    Technical Report
    Buildings - Representative Sample
    Colombo 764
2012-10-2626 October 2012 Independent Earthquake Performance Assessment of Victoria Square Apartments - 100 Armagh Street: Prepared by Dr Nicholas Brooke of Compusoft Engineering, January 2012 Independent Earthquake Performance Assessment of Victoria Square Apartments - 100 Armagh Street: Prepared by Dr Nicholas Brooke of Compusoft Engineering, January 2012
  • Brooke, Nicholas
  • Compusoft Engineering
    Technical Report
    Buildings - Representative Sample
    Armagh 100
2012-10-2626 October 2012Seismic Performance Summary draft report for Christchurch Town Hall - 100 Kilmore Street: Prepared by Rutherford & Chekene, April 2012Seismic Performance Summary draft report for Christchurch Town Hall - 100 Kilmore Street: Prepared by Rutherford & Chekene, April 2012
    Rutherford & Chekene
    Technical Report
    Buildings - Representative Sample
    Kilmore 100
2012-10-2424 October 2012Independent Earthquake Performance Assessment of Christchurch Central Police Station - 48 Hereford Street: Report by Dr Nicholas Brooke of Compusoft Engineering Limited, February 2012Independent Earthquake Performance Assessment of Christchurch Central Police Station - 48 Hereford Street: Report by Dr Nicholas Brooke of Compusoft Engineering Limited, February 2012
    Compusoft Engineering
    Technical Report
    Buildings - Representative Sample
    Hereford 48
2012-10-2424 October 2012Independent Earthquake Performance Assessment of Christchurch Civic Building - 53 Hereford Street: Report by Dr Nicholas Brooke of Compusoft Engineering Limited, March 2012Independent Earthquake Performance Assessment of Christchurch Civic Building - 53 Hereford Street: Report by Dr Nicholas Brooke of Compusoft Engineering Limited, March 2012
  • Brooke, Nicholas
  • Compusoft Engineering
    Technical Report
    Buildings - Representative Sample
    Hereford 53
2012-03-1212 March 2012Department of Building and Housing Technical Investigation Reports: Peer review by William Holmes, November 2011Department of Building and Housing Technical Investigation Reports: Peer review by William Holmes, November 2011
  • Holmes, William T
  • Rutherford & Chekene
  • Exhibit
  • Technical Report
    Central Business District (CBD)
  • Cambridge 233
  • Cashel 161
  • Colombo 764
2011-11-0707 November 2011Independent Review of the Response to the Canterbury Earthquake, 4 September 2010: Technical report commissioned by Ministry of Civil Defence & Emergency Management, May 2011Independent Review of the Response to the Canterbury Earthquake, 4 September 2010: Technical report commissioned by Ministry of Civil Defence & Emergency Management, May 2011
  • Middleton, David
  • Westlake, Richard
    Technical Report
    Christchurch Recovery
    2011-11-0404 November 2011Building Evaluation Transition Team - Processes Used and Lessons Learnt Following the Darfield Earthquake of 4 September 2010: Technical Report by Esther Griffiths of Sisirc Consulting Limited and Deane McNulty of McNulty Engineering Management Limited, January 2011 Building Evaluation Transition Team - Processes Used and Lessons Learnt Following the Darfield Earthquake of 4 September 2010: Technical Report by Esther Griffiths of Sisirc Consulting Limited and Deane McNulty of McNulty Engineering Management Limited, January 2011
    • Griffiths, Esther
    • McNulty, Deane
      Technical Report
      Christchurch Recovery
      2011-11-0707 November 2011Independent Review of the Response to the Canterbury Earthquake, 4 September 2010: Technical report commissioned by Ministry of Civil Defence & Emergency Management, May 2011Independent Review of the Response to the Canterbury Earthquake, 4 September 2010: Technical report commissioned by Ministry of Civil Defence & Emergency Management, May 2011
      • Middleton, David
      • Westlake, Richard
        Technical Report
        Christchurch Recovery
        2011-11-0707 November 2011Independent Review of the Response to the Canterbury Earthquake, 4 September 2010: Technical report commissioned by Ministry of Civil Defence & Emergency Management, May 2011Independent Review of the Response to the Canterbury Earthquake, 4 September 2010: Technical report commissioned by Ministry of Civil Defence & Emergency Management, May 2011
        • Middleton, David
        • Westlake, Richard
          Technical Report
          Civil Defence
          2011-10-2121 October 2011Heritage earthquake prone building strengthening cost study: Technical report by John Hare of Holmes Consulting Group, June 2009Heritage earthquake prone building strengthening cost study: Technical report by John Hare of Holmes Consulting Group, June 2009
          • Hare, John
          • Holmes Consulting Group
            Technical Report
            Culture and Heritage
            2011-10-2121 October 2011System of Building Controls - Appendix A, Section 5: rapid assessment of buildings during a state of emergency - Building safety evaluation during a state of emergency - Guidelines for Territorial Authorities: Technical Report by New Zealand Society for Earthquake Engineering, August 2009System of Building Controls - Appendix A, Section 5: rapid assessment of buildings during a state of emergency - Building safety evaluation during a state of emergency - Guidelines for Territorial Authorities: Technical Report by New Zealand Society for Earthquake Engineering, August 2009
            • Department of Building and Housing
            • New Zealand Society for Earthquake Engineering
              Technical Report
              Emergency Powers and Procedures
              2011-11-0404 November 2011The Civil Defence Emergency Management Framework and Response to the 22 February Christchurch Earthquake: Technical report by the Ministry of Civil Defence & Emergency Management, October 2011The Civil Defence Emergency Management Framework and Response to the 22 February Christchurch Earthquake: Technical report by the Ministry of Civil Defence & Emergency Management, October 2011
                Ministry of Civil Defence and Emergency
                Technical Report
                Emergency Powers and Procedures
                2011-11-0707 November 2011Independent Review of the Response to the Canterbury Earthquake, 4 September 2010: Technical report commissioned by Ministry of Civil Defence & Emergency Management, May 2011Independent Review of the Response to the Canterbury Earthquake, 4 September 2010: Technical report commissioned by Ministry of Civil Defence & Emergency Management, May 2011
                • Middleton, David
                • Westlake, Richard
                  Technical Report
                  Emergency Powers and Procedures
                  2011-11-1414 November 2011Steel Building Damage From The Christchurch Earthquake Series of 2010 and 2011: Technical Report by Charles Clifton, Michel Bruneau, Alistair Fussell, Roberto Leon and Greg MacRae, November 2011Steel Building Damage From The Christchurch Earthquake Series of 2010 and 2011: Technical Report by Charles Clifton, Michel Bruneau, Alistair Fussell, Roberto Leon and Greg MacRae, November 2011
                  • Bruneau, Michel
                  • Clifton, Charles
                  • Fussell, Alistair
                  • Leon, Roberto
                  • MacRae, Gregory
                    Technical Report
                    Engineering
                    2012-02-2828 February 2012Base Isolation and Damage-Resistant Technologies for Improved Seismic Performance of Buildings: Technical Report by Andrew H Buchanan, Des Bull, Rajesh P Dhakal, Gregory MacRae, Alessandro Palermo and Stefano Pampanin, August 2011Base Isolation and Damage-Resistant Technologies for Improved Seismic Performance of Buildings: Technical Report by Andrew H Buchanan, Des Bull, Rajesh P Dhakal, Gregory MacRae, Alessandro Palermo and Stefano Pampanin, August 2011
                    • Buchanan, Andrew H
                    • Bull, Des
                    • Dhakal, Rajesh P
                    • MacRae, Gregory
                    • Palermo, Alessandro
                    • Pampanin, Stefano
                      Technical Report
                      Engineering
                      2011-10-2121 October 2011Preliminary Observations from Christchurch Earthquakes: Technical Report by John Hare in conjunction with Structural Engineering Society of New Zealand, August 2011Preliminary Observations from Christchurch Earthquakes: Technical Report by John Hare in conjunction with Structural Engineering Society of New Zealand, August 2011
                        Structural Engineering Society of New Zealand
                        Technical Report
                        Engineering
                        2011-12-2121 December 2011Practice Note - Design of Conventional Structural Systems Following Canterbury Earthquakes: Submission by Structural Engineering Society of New Zealand, December 2011Practice Note - Design of Conventional Structural Systems Following Canterbury Earthquakes: Submission by Structural Engineering Society of New Zealand, December 2011
                          Structural Engineering Society of New Zealand
                        • Submission
                        • Technical Report
                          Engineering

                          Search results navigation

                          Displaying 22 - 41 of 106 items arrow left First arrow left Prev arrow right Next arrow right Last