Canterbury Earthquakes Royal Commission Te Komihana Rūwhenua o Waitaha Canterbury Earthquakes Royal Commission – Te Komihana Rūwhenua o Waitaha

Those who lost relatives and friends in the 22 February earthquake can be assured that there will be a very thorough inquiry into the failure of buildings that resulted in loss of life.
Chair, Justice Mark Cooper

Document library

Document categories

Additional filter options

Choose 1 or more filters then press 'Apply filter'
Reset

Search results

Published Sorted ascending Title Not sorted Author(s) Not sorted Category Not sorted Subject(s) Not sorted Building(s) Not sorted Action
2011-11-0202 November 2011Letter from David Nummy of Unitec to the Royal Commission regarding engineering qualificationsLetter from David Nummy of Unitec to the Royal Commission regarding engineering qualifications
  • Nummy, David
  • Unitec
  • Submission
  • Technical Report
    Engineering
    2011-11-0202 November 2011Canterbury Earthquakes Royal Commission summary of the IPENZ report 'Standards and Regulation for Building Construction in New Zealand'Canterbury Earthquakes Royal Commission summary of the IPENZ report 'Standards and Regulation for Building Construction in New Zealand'
      Canterbury Earthquakes Royal Commission
      Technical Report
      Standards and Regulation
      2011-11-0202 November 2011Structural and Geotechnical Engineering Education: Submission by Faculty of Engineering, University of Auckland, August 2011Structural and Geotechnical Engineering Education: Submission by Faculty of Engineering, University of Auckland, August 2011
      • Davies, Michael C R
      • Pender, Michael
      • Quenneville, Pierre
      • Submission
      • Technical Report
        Training and Education
        2011-11-0303 November 2011Performance of Unreinforced Masonry in the 2010/2011 Canterbury Earthquake Swarm: Technical Report by Associate Professor Jason M Ingham and Professor Michael C Griffith, August 2011Performance of Unreinforced Masonry in the 2010/2011 Canterbury Earthquake Swarm: Technical Report by Associate Professor Jason M Ingham and Professor Michael C Griffith, August 2011
        • Griffith, Michael C
        • Ingham, Jason M
          Technical Report
          Unreinforced Masonry Buildings (URM)
          2011-11-0303 November 2011Performance of Unreinforced Masonry Buildings in the 2010/2011 Canterbury Earthquake Swarm: Peer Review by Bret Lizundia, September 2011Performance of Unreinforced Masonry Buildings in the 2010/2011 Canterbury Earthquake Swarm: Peer Review by Bret Lizundia, September 2011
          • Lizundia, Bret
          • Rutherford & Chekene
            Technical Report
            Unreinforced Masonry Buildings (URM)
            2011-11-0303 November 2011The Performance of Earthquake Strengthened URM Buildings in the Christchurch CBD in the 22 February 2011 Earthquake: Addendum Report by Associate Professor Jason M. Ingham and Professor Michael C. Griffith, October 2011The Performance of Earthquake Strengthened URM Buildings in the Christchurch CBD in the 22 February 2011 Earthquake: Addendum Report by Associate Professor Jason M. Ingham and Professor Michael C. Griffith, October 2011
            • Griffith, Michael C
            • Ingham, Jason M
            • University of Auckland
              Technical Report
              Unreinforced Masonry Buildings (URM)
              2011-11-0303 November 2011Performance of Unreinforced Masonry Buildings in the 2010/2011 Canterbury Earthquake Swarm: Peer Review by Fred Turner, September 2011Performance of Unreinforced Masonry Buildings in the 2010/2011 Canterbury Earthquake Swarm: Peer Review by Fred Turner, September 2011
                Turner, Fred
                Technical Report
                Unreinforced Masonry Buildings (URM)
                2011-11-0404 November 2011Building Evaluation Transition Team - Processes Used and Lessons Learnt Following the Darfield Earthquake of 4 September 2010: Technical Report by Esther Griffiths of Sisirc Consulting Limited and Deane McNulty of McNulty Engineering Management Limited, January 2011 Building Evaluation Transition Team - Processes Used and Lessons Learnt Following the Darfield Earthquake of 4 September 2010: Technical Report by Esther Griffiths of Sisirc Consulting Limited and Deane McNulty of McNulty Engineering Management Limited, January 2011
                • Griffiths, Esther
                • McNulty, Deane
                  Technical Report
                  Christchurch Recovery
                  2011-11-0404 November 2011The Civil Defence Emergency Management Framework and Response to the 22 February Christchurch Earthquake: Technical report by the Ministry of Civil Defence & Emergency Management, October 2011The Civil Defence Emergency Management Framework and Response to the 22 February Christchurch Earthquake: Technical report by the Ministry of Civil Defence & Emergency Management, October 2011
                    Ministry of Civil Defence and Emergency
                    Technical Report
                  • Emergency Powers and Procedures
                  • Safety Evaluation
                  • Standards and Regulation
                    2011-11-0707 November 2011Independent Review of the Response to the Canterbury Earthquake, 4 September 2010: Technical report commissioned by Ministry of Civil Defence & Emergency Management, May 2011Independent Review of the Response to the Canterbury Earthquake, 4 September 2010: Technical report commissioned by Ministry of Civil Defence & Emergency Management, May 2011
                    • Middleton, David
                    • Westlake, Richard
                      Technical Report
                      Christchurch Recovery
                      2011-11-0707 November 2011Report into Building Safety Evaluation in the Central Business District Following the 4 September 2010 Earthquake: Technical Report by the Christchurch City Council, August 2011, Part 1 of 5, Page 1-80Report into Building Safety Evaluation in the Central Business District Following the 4 September 2010 Earthquake: Technical Report by the Christchurch City Council, August 2011, Part 1 of 5, Page 1-80
                        Christchurch City Council
                        Technical Report
                        Placarding (Stickering)
                        2011-11-0707 November 2011Report into Building Safety Evaluation in the Central Business District Following the 4 September 2010 Earthquake: Technical Report by the Christchurch City Council, August 2011, Part 5 of 5, Page 171-196Report into Building Safety Evaluation in the Central Business District Following the 4 September 2010 Earthquake: Technical Report by the Christchurch City Council, August 2011, Part 5 of 5, Page 171-196
                          Christchurch City Council
                          Technical Report
                          Placarding (Stickering)
                          2011-11-0707 November 2011Report into Building Safety Evaluation in the Central Business District Following the 4 September 2010 Earthquake: Technical Report by the Christchurch City Council, August 2011, Part 2 of 5, Page 81-117Report into Building Safety Evaluation in the Central Business District Following the 4 September 2010 Earthquake: Technical Report by the Christchurch City Council, August 2011, Part 2 of 5, Page 81-117
                            Christchurch City Council
                            Technical Report
                            Placarding (Stickering)
                            2011-11-0707 November 2011Report into Building Safety Evaluation in the Central Business District Following the 4 September 2010 Earthquake: Technical Report by the Christchurch City Council, August 2011, Part 3 of 5, Page 118 -146Report into Building Safety Evaluation in the Central Business District Following the 4 September 2010 Earthquake: Technical Report by the Christchurch City Council, August 2011, Part 3 of 5, Page 118 -146
                              Christchurch City Council
                              Technical Report
                              Placarding (Stickering)
                              2011-11-0707 November 2011Report into Building Safety Evaluation in the Central Business District Following the 4 September 2010 Earthquake: Technical Report by the Christchurch City Council, August 2011, Part 4 of 5, Page 147-170Report into Building Safety Evaluation in the Central Business District Following the 4 September 2010 Earthquake: Technical Report by the Christchurch City Council, August 2011, Part 4 of 5, Page 147-170
                                Christchurch City Council
                                Technical Report
                                Placarding (Stickering)
                                2011-11-0707 November 2011Independent Review of the Response to the Canterbury Earthquake, 4 September 2010: Technical report commissioned by Ministry of Civil Defence & Emergency Management, May 2011Independent Review of the Response to the Canterbury Earthquake, 4 September 2010: Technical report commissioned by Ministry of Civil Defence & Emergency Management, May 2011
                                • Middleton, David
                                • Westlake, Richard
                                  Technical Report
                                • Building assessments after earthquakes
                                • Christchurch Recovery
                                • Civil Defence
                                • Emergency Powers and Procedures
                                • Placarding (Stickering)
                                • Safety Evaluation
                                  2011-11-0707 November 2011Report into Building Safety Evaluation Processes in the Central Business District Following the 4 September 2010 Earthquake: Technical Report by the Christchurch City Council, August 2011Report into Building Safety Evaluation Processes in the Central Business District Following the 4 September 2010 Earthquake: Technical Report by the Christchurch City Council, August 2011
                                    Christchurch City Council
                                    Technical Report
                                    Placarding (Stickering)
                                    2011-11-1414 November 2011Steel Building Damage From The Christchurch Earthquake Series of 2010 and 2011: Technical Report by Charles Clifton, Michel Bruneau, Alistair Fussell, Roberto Leon and Greg MacRae, November 2011Steel Building Damage From The Christchurch Earthquake Series of 2010 and 2011: Technical Report by Charles Clifton, Michel Bruneau, Alistair Fussell, Roberto Leon and Greg MacRae, November 2011
                                    • Bruneau, Michel
                                    • Clifton, Charles
                                    • Fussell, Alistair
                                    • Leon, Roberto
                                    • MacRae, Gregory
                                      Technical Report
                                    • Buildings - Representative Sample
                                    • Engineering
                                      2011-11-1515 November 2011Review of NZ Building Codes of Practice: Technical report by Gregory MacRae, Charles Clifton and Les Megget, August 2011Review of NZ Building Codes of Practice: Technical report by Gregory MacRae, Charles Clifton and Les Megget, August 2011
                                      • Clifton, Charles
                                      • MacRae, Gregory
                                      • Megget, Lee
                                        Technical Report
                                        Standards and Regulation
                                        2011-11-1515 November 2011Letter from the Department of Building and Housing about the Forsyth Barr building report, November 2011Letter from the Department of Building and Housing about the Forsyth Barr building report, November 2011
                                        • Department of Building and Housing
                                        • Hopkins, David
                                          Technical Report
                                        • Buildings - Representative Sample
                                        • RFI and EOI
                                          Colombo 764

                                        Search results navigation

                                        Displaying 27 - 46 of 76 items arrow left First arrow left Prev arrow right Next arrow right Last