Canterbury Earthquakes Royal Commission Te Komihana Rūwhenua o Waitaha Canterbury Earthquakes Royal Commission – Te Komihana Rūwhenua o Waitaha

Those who lost relatives and friends in the 22 February earthquake can be assured that there will be a very thorough inquiry into the failure of buildings that resulted in loss of life.
Chair, Justice Mark Cooper

Document library

Document categories

Additional filter options

Choose 1 or more filters then press 'Apply filter'
Reset

Search results

Published No sorted Title Not sorted Author(s) Not sorted Category Not sorted Subject(s) Not sorted Building(s) Sorted descending Action
2011-10-2121 October 2011Z-factor Graph: Technical Report by GNS Science, October 2011Z-factor Graph: Technical Report by GNS Science, October 2011
  • GNS Science
  • Webb, T H (Terry)
  • Exhibit
  • Technical Report
    Seismicity
    2012-10-2626 October 2012Seismic Performance Investigation Draft Report of Clarendon Tower - 78 Worcester Street: Report by Bill Holmes and Reid Zimmerman of Rutherford & Chekene, February 2012Seismic Performance Investigation Draft Report of Clarendon Tower - 78 Worcester Street: Report by Bill Holmes and Reid Zimmerman of Rutherford & Chekene, February 2012
    • Holmes, William T
    • Rutherford & Chekene
    • Zimmerman, Reid
      Technical Report
      Buildings - Representative Sample
      Worcester 78
    2012-10-2626 October 2012Independent Assessment on Earthquake Performance of 151 Worcester Street: Report by Peter Smith and Jonathan Devine of Spencer Holmes Limited, December 2011Independent Assessment on Earthquake Performance of 151 Worcester Street: Report by Peter Smith and Jonathan Devine of Spencer Holmes Limited, December 2011
    • Devine, Jonathan
    • Smith, Peter
    • Spencer Holmes Ltd
      Technical Report
      Buildings - Representative Sample
      Worcester 151
    2012-10-2626 October 2012Detailed Engineering Evaluation of Christchurch Women's Hospital provided to the Royal Commission by Holmes Consulting Group in May 2012Detailed Engineering Evaluation of Christchurch Women's Hospital provided to the Royal Commission by Holmes Consulting Group in May 2012
      Holmes Consulting Group
      Technical Report
      Buildings - Representative Sample
      Riccarton Ave 2
    2012-02-1414 February 2012CTV Building Collapse Investigation reports prepared for the Department of Building and Housing CTV Building Collapse Investigation reports prepared for the Department of Building and Housing
    • Department of Building and Housing
    • Hyland Consultants Ltd
    • Structure Smith Consulting Engineers
      Technical Report
    • Building Failure
    • Buildings - Representative Sample
      Madras 249
    2012-06-2525 June 2012CTV Building hearing: CTV Building Collapse Investigation Report by Dr Clark Hyland and Ashley Smith, January 2012CTV Building hearing: CTV Building Collapse Investigation Report by Dr Clark Hyland and Ashley Smith, January 2012
    • Hyland Consultants Ltd
    • Hyland, Clark
    • Smith, Ashley
    • Structure Smith Consulting Engineers
    • Exhibit
    • Technical Report
      Buildings - Representative Sample
      Madras 249
    2012-10-2626 October 2012Seismic Performance Summary draft report for Christchurch Town Hall - 100 Kilmore Street: Prepared by Rutherford & Chekene, April 2012Seismic Performance Summary draft report for Christchurch Town Hall - 100 Kilmore Street: Prepared by Rutherford & Chekene, April 2012
      Rutherford & Chekene
      Technical Report
      Buildings - Representative Sample
      Kilmore 100
    2012-10-2424 October 2012Independent Earthquake Performance Assessment of Christchurch Civic Building - 53 Hereford Street: Report by Dr Nicholas Brooke of Compusoft Engineering Limited, March 2012Independent Earthquake Performance Assessment of Christchurch Civic Building - 53 Hereford Street: Report by Dr Nicholas Brooke of Compusoft Engineering Limited, March 2012
    • Brooke, Nicholas
    • Compusoft Engineering
      Technical Report
      Buildings - Representative Sample
      Hereford 53
    2012-10-2424 October 2012Independent Earthquake Performance Assessment of Christchurch Central Police Station - 48 Hereford Street: Report by Dr Nicholas Brooke of Compusoft Engineering Limited, February 2012Independent Earthquake Performance Assessment of Christchurch Central Police Station - 48 Hereford Street: Report by Dr Nicholas Brooke of Compusoft Engineering Limited, February 2012
      Compusoft Engineering
      Technical Report
      Buildings - Representative Sample
      Hereford 48
    2012-09-1010 September 2012Materials Testing in Buildings of Interest - Gallery Apartments, Westpac Centre, IRD Building: Report prepared by Holmes Solutions, November 2011Materials Testing in Buildings of Interest - Gallery Apartments, Westpac Centre, IRD Building: Report prepared by Holmes Solutions, November 2011
    • Allington, Chris
    • Holmes Solutions
      Technical Report
      Buildings - Representative Sample
      Gloucester 62
    2012-10-2626 October 2012Independent Assessment on Earthquake Performance of Gallery Apartments - 62 Gloucester Street: Report by Peter Smith and Vaughan England of Spencer Holmes Limited, February 2012Independent Assessment on Earthquake Performance of Gallery Apartments - 62 Gloucester Street: Report by Peter Smith and Vaughan England of Spencer Holmes Limited, February 2012
    • Smith, Peter
    • Spencer Holmes Ltd
      Technical Report
      Buildings - Representative Sample
      Gloucester 62
    2011-12-0202 December 2011Department of Building and Housing Expert Panel Report on the PGC, Forsyth Barr and Hotel Grand Chancellor Buildings, released 30 September 2011Department of Building and Housing Expert Panel Report on the PGC, Forsyth Barr and Hotel Grand Chancellor Buildings, released 30 September 2011
      Department of Building and Housing
      Technical Report
    • Building Failure
    • Buildings - Representative Sample
      Colombo 764
    2012-03-1212 March 2012Department of Building and Housing Technical Investigation Reports: Peer review by William Holmes, November 2011Department of Building and Housing Technical Investigation Reports: Peer review by William Holmes, November 2011
    • Holmes, William T
    • Rutherford & Chekene
    • Exhibit
    • Technical Report
    • Building Failure
    • Buildings - Representative Sample
    • Central Business District (CBD)
      Colombo 764
    2011-11-1515 November 2011Letter from the Department of Building and Housing about the Forsyth Barr building report, November 2011Letter from the Department of Building and Housing about the Forsyth Barr building report, November 2011
    • Department of Building and Housing
    • Hopkins, David
      Technical Report
    • Buildings - Representative Sample
    • RFI and EOI
      Colombo 764
    2012-09-1010 September 2012Materials Testing in Buildings of Interest - Gallery Apartments, Westpac Centre, IRD Building: Report prepared by Holmes Solutions, November 2011Materials Testing in Buildings of Interest - Gallery Apartments, Westpac Centre, IRD Building: Report prepared by Holmes Solutions, November 2011
    • Allington, Chris
    • Holmes Solutions
      Technical Report
      Buildings - Representative Sample
      Cashel 224
    2012-10-2626 October 2012 Independent Assessment of Earthquake Performance of Inland Revenue Building - 224 Cashel Street: Report prepared by Peter Smith and Jonathan Devine of Spencer Holmes Limited Independent Assessment of Earthquake Performance of Inland Revenue Building - 224 Cashel Street: Report prepared by Peter Smith and Jonathan Devine of Spencer Holmes Limited
    • Devine, Jonathan
    • Smith, Peter
    • Spencer Holmes Ltd
      Technical Report
      Buildings - Representative Sample
      Cashel 224
    2012-09-1010 September 2012Materials Testing in Buildings of Interest - Gallery Apartments, Westpac Centre, IRD Building: Report prepared by Holmes Solutions, November 2011Materials Testing in Buildings of Interest - Gallery Apartments, Westpac Centre, IRD Building: Report prepared by Holmes Solutions, November 2011
    • Allington, Chris
    • Holmes Solutions
      Technical Report
      Buildings - Representative Sample
      Cashel 166
    2012-10-2525 October 2012Independent Assessment on Earthquake Performance of Westpac Tower - 166 Cashel Street: Report by Peter Smith and Vaughan England of Spencer Holmes Limited, February 2012 Independent Assessment on Earthquake Performance of Westpac Tower - 166 Cashel Street: Report by Peter Smith and Vaughan England of Spencer Holmes Limited, February 2012
    • England, Vaughan
    • Smith, Peter
    • Spencer Holmes Ltd
      Technical Report
      Buildings - Representative Sample
      Cashel 166
    2011-12-0202 December 2011Department of Building and Housing Expert Panel Report on the PGC, Forsyth Barr and Hotel Grand Chancellor Buildings, released 30 September 2011Department of Building and Housing Expert Panel Report on the PGC, Forsyth Barr and Hotel Grand Chancellor Buildings, released 30 September 2011
      Department of Building and Housing
      Technical Report
    • Building Failure
    • Buildings - Representative Sample
      Cashel 161
    2012-03-1212 March 2012Department of Building and Housing Technical Investigation Reports: Peer review by William Holmes, November 2011Department of Building and Housing Technical Investigation Reports: Peer review by William Holmes, November 2011
    • Holmes, William T
    • Rutherford & Chekene
    • Exhibit
    • Technical Report
    • Building Failure
    • Buildings - Representative Sample
    • Central Business District (CBD)
      Cashel 161

    Search results navigation

    Displaying 57 - 76 of 82 items arrow left First arrow left Prev arrow right Next arrow right Last