Canterbury Earthquakes Royal Commission Te Komihana Rūwhenua o Waitaha Canterbury Earthquakes Royal Commission – Te Komihana Rūwhenua o Waitaha

Those who lost relatives and friends in the 22 February earthquake can be assured that there will be a very thorough inquiry into the failure of buildings that resulted in loss of life.
Chair, Justice Mark Cooper

Document library

Document categories

Additional filter options

Choose 1 or more filters then press 'Apply filter'
Reset

Search results

Published No sorted Title Not sorted Author(s) Sorted ascending Category Not sorted Subject(s) Not sorted Building(s) Not sorted Action
2011-11-0404 November 2011Building Evaluation Transition Team - Processes Used and Lessons Learnt Following the Darfield Earthquake of 4 September 2010: Technical Report by Esther Griffiths of Sisirc Consulting Limited and Deane McNulty of McNulty Engineering Management Limited, January 2011 Building Evaluation Transition Team - Processes Used and Lessons Learnt Following the Darfield Earthquake of 4 September 2010: Technical Report by Esther Griffiths of Sisirc Consulting Limited and Deane McNulty of McNulty Engineering Management Limited, January 2011
    Griffiths, Esther
    Technical Report
    Christchurch Recovery
    2011-11-0303 November 2011Performance of Unreinforced Masonry in the 2010/2011 Canterbury Earthquake Swarm: Technical Report by Associate Professor Jason M Ingham and Professor Michael C Griffith, August 2011Performance of Unreinforced Masonry in the 2010/2011 Canterbury Earthquake Swarm: Technical Report by Associate Professor Jason M Ingham and Professor Michael C Griffith, August 2011
      Griffith, Michael C
      Technical Report
      Unreinforced Masonry Buildings (URM)
      2011-11-0303 November 2011The Performance of Earthquake Strengthened URM Buildings in the Christchurch CBD in the 22 February 2011 Earthquake: Addendum Report by Associate Professor Jason M. Ingham and Professor Michael C. Griffith, October 2011The Performance of Earthquake Strengthened URM Buildings in the Christchurch CBD in the 22 February 2011 Earthquake: Addendum Report by Associate Professor Jason M. Ingham and Professor Michael C. Griffith, October 2011
        Griffith, Michael C
        Technical Report
        Unreinforced Masonry Buildings (URM)
        2011-10-2121 October 2011Heritage earthquake prone building strengthening cost study: Technical report by John Hare of Holmes Consulting Group, June 2009Heritage earthquake prone building strengthening cost study: Technical report by John Hare of Holmes Consulting Group, June 2009
          Hare, John
          Technical Report
        • Culture and Heritage
        • Engineering
          2011-10-2121 October 2011Heritage earthquake prone building strengthening cost study: Technical report by John Hare of Holmes Consulting Group, June 2009Heritage earthquake prone building strengthening cost study: Technical report by John Hare of Holmes Consulting Group, June 2009
            Holmes Consulting Group
            Technical Report
          • Culture and Heritage
          • Engineering
            2011-10-2121 October 2011Stairs and Access Ramps Between Floors in Multi-Storey Buildings: Technical Report by Des Bull, August 2011Stairs and Access Ramps Between Floors in Multi-Storey Buildings: Technical Report by Des Bull, August 2011
              Holmes Consulting Group
              Technical Report
            • Engineering
            • Stairs and Floors
              2012-10-2626 October 2012Detailed Engineering Evaluation of Christchurch Women's Hospital provided to the Royal Commission by Holmes Consulting Group in May 2012Detailed Engineering Evaluation of Christchurch Women's Hospital provided to the Royal Commission by Holmes Consulting Group in May 2012
                Holmes Consulting Group
                Technical Report
                Buildings - Representative Sample
                Riccarton Ave 2
              2012-09-1010 September 2012Materials Testing in Buildings of Interest - Gallery Apartments, Westpac Centre, IRD Building: Report prepared by Holmes Solutions, November 2011Materials Testing in Buildings of Interest - Gallery Apartments, Westpac Centre, IRD Building: Report prepared by Holmes Solutions, November 2011
                Holmes Solutions
                Technical Report
                Buildings - Representative Sample
              • Cashel 166
              • Cashel 224
              • Gloucester 62
              2012-10-2626 October 2012Seismic Performance Investigation Draft Report of Clarendon Tower - 78 Worcester Street: Report by Bill Holmes and Reid Zimmerman of Rutherford & Chekene, February 2012Seismic Performance Investigation Draft Report of Clarendon Tower - 78 Worcester Street: Report by Bill Holmes and Reid Zimmerman of Rutherford & Chekene, February 2012
                Holmes, William T
                Technical Report
                Buildings - Representative Sample
                Worcester 78
              2012-03-1212 March 2012Department of Building and Housing Technical Investigation Reports: Peer review by William Holmes, November 2011Department of Building and Housing Technical Investigation Reports: Peer review by William Holmes, November 2011
                Holmes, William T
              • Exhibit
              • Technical Report
              • Building Failure
              • Buildings - Representative Sample
              • Central Business District (CBD)
              • Cambridge 233
              • Cashel 161
              • Colombo 764
              2011-11-1515 November 2011Letter from the Department of Building and Housing about the Forsyth Barr building report, November 2011Letter from the Department of Building and Housing about the Forsyth Barr building report, November 2011
                Hopkins, David
                Technical Report
              • Buildings - Representative Sample
              • RFI and EOI
                Colombo 764
              2012-02-1414 February 2012CTV Building Collapse Investigation reports prepared for the Department of Building and Housing CTV Building Collapse Investigation reports prepared for the Department of Building and Housing
                Hyland Consultants Ltd
                Technical Report
              • Building Failure
              • Buildings - Representative Sample
                Madras 249
              2012-06-2525 June 2012CTV Building hearing: CTV Building Collapse Investigation Report by Dr Clark Hyland and Ashley Smith, January 2012CTV Building hearing: CTV Building Collapse Investigation Report by Dr Clark Hyland and Ashley Smith, January 2012
                Hyland Consultants Ltd
              • Exhibit
              • Technical Report
                Buildings - Representative Sample
                Madras 249
              2012-06-2525 June 2012CTV Building hearing: CTV Building Collapse Investigation Report by Dr Clark Hyland and Ashley Smith, January 2012CTV Building hearing: CTV Building Collapse Investigation Report by Dr Clark Hyland and Ashley Smith, January 2012
                Hyland, Clark
              • Exhibit
              • Technical Report
                Buildings - Representative Sample
                Madras 249
              2011-11-0303 November 2011Performance of Unreinforced Masonry in the 2010/2011 Canterbury Earthquake Swarm: Technical Report by Associate Professor Jason M Ingham and Professor Michael C Griffith, August 2011Performance of Unreinforced Masonry in the 2010/2011 Canterbury Earthquake Swarm: Technical Report by Associate Professor Jason M Ingham and Professor Michael C Griffith, August 2011
                Ingham, Jason M
                Technical Report
                Unreinforced Masonry Buildings (URM)
                2011-11-0303 November 2011The Performance of Earthquake Strengthened URM Buildings in the Christchurch CBD in the 22 February 2011 Earthquake: Addendum Report by Associate Professor Jason M. Ingham and Professor Michael C. Griffith, October 2011The Performance of Earthquake Strengthened URM Buildings in the Christchurch CBD in the 22 February 2011 Earthquake: Addendum Report by Associate Professor Jason M. Ingham and Professor Michael C. Griffith, October 2011
                  Ingham, Jason M
                  Technical Report
                  Unreinforced Masonry Buildings (URM)
                  2011-12-0202 December 2011Standards and Regulation for Building Construction in New Zealand by the Institution of Professional Engineers New Zealand, August 2011Standards and Regulation for Building Construction in New Zealand by the Institution of Professional Engineers New Zealand, August 2011
                    Institution of Professional Engineers New Zealand (IPENZ)
                  • Referenced Document
                  • Submission
                  • Technical Report
                    Standards and Regulation
                    2011-10-2121 October 2011System of Building Controls - Appendix A, Section 2: The building regulatory system - Performance-based building regulatory systems: Principles and experiences: Technical Report by Inter-Jurisdictional Regulatory Collaboration Committee, February 2010System of Building Controls - Appendix A, Section 2: The building regulatory system - Performance-based building regulatory systems: Principles and experiences: Technical Report by Inter-Jurisdictional Regulatory Collaboration Committee, February 2010
                      Inter-jurisdictional Regulatory Collaboration Committee (IRCC)
                      Technical Report
                      Standards and Regulation
                      2011-11-1414 November 2011Steel Building Damage From The Christchurch Earthquake Series of 2010 and 2011: Technical Report by Charles Clifton, Michel Bruneau, Alistair Fussell, Roberto Leon and Greg MacRae, November 2011Steel Building Damage From The Christchurch Earthquake Series of 2010 and 2011: Technical Report by Charles Clifton, Michel Bruneau, Alistair Fussell, Roberto Leon and Greg MacRae, November 2011
                        Leon, Roberto
                        Technical Report
                      • Buildings - Representative Sample
                      • Engineering
                        2011-11-0303 November 2011Performance of Unreinforced Masonry Buildings in the 2010/2011 Canterbury Earthquake Swarm: Peer Review by Bret Lizundia, September 2011Performance of Unreinforced Masonry Buildings in the 2010/2011 Canterbury Earthquake Swarm: Peer Review by Bret Lizundia, September 2011
                          Lizundia, Bret
                          Technical Report
                          Unreinforced Masonry Buildings (URM)

                          Search results navigation

                          Displaying 64 - 83 of 141 items arrow left First arrow left Prev arrow right Next arrow right Last