Canterbury Earthquakes Royal Commission Te Komihana Rūwhenua o Waitaha Canterbury Earthquakes Royal Commission – Te Komihana Rūwhenua o Waitaha

Those who lost relatives and friends in the 22 February earthquake can be assured that there will be a very thorough inquiry into the failure of buildings that resulted in loss of life.
Chair, Justice Mark Cooper

Document library

Document categories

Additional filter options

Choose 1 or more filters then press 'Apply filter'
Reset

Search results

Published Sorted descending Title Not sorted Author(s) Not sorted Category Not sorted Subject(s) Not sorted Building(s) Not sorted Action
2011-11-0404 November 2011The Civil Defence Emergency Management Framework and Response to the 22 February Christchurch Earthquake: Technical report by the Ministry of Civil Defence & Emergency Management, October 2011The Civil Defence Emergency Management Framework and Response to the 22 February Christchurch Earthquake: Technical report by the Ministry of Civil Defence & Emergency Management, October 2011
    Ministry of Civil Defence and Emergency
    Technical Report
  • Emergency Powers and Procedures
  • Safety Evaluation
  • Standards and Regulation
    2011-11-0303 November 2011Performance of Unreinforced Masonry in the 2010/2011 Canterbury Earthquake Swarm: Technical Report by Associate Professor Jason M Ingham and Professor Michael C Griffith, August 2011Performance of Unreinforced Masonry in the 2010/2011 Canterbury Earthquake Swarm: Technical Report by Associate Professor Jason M Ingham and Professor Michael C Griffith, August 2011
    • Griffith, Michael C
    • Ingham, Jason M
      Technical Report
      Unreinforced Masonry Buildings (URM)
      2011-11-0303 November 2011Performance of Unreinforced Masonry Buildings in the 2010/2011 Canterbury Earthquake Swarm: Peer Review by Bret Lizundia, September 2011Performance of Unreinforced Masonry Buildings in the 2010/2011 Canterbury Earthquake Swarm: Peer Review by Bret Lizundia, September 2011
      • Lizundia, Bret
      • Rutherford & Chekene
        Technical Report
        Unreinforced Masonry Buildings (URM)
        2011-11-0303 November 2011The Performance of Earthquake Strengthened URM Buildings in the Christchurch CBD in the 22 February 2011 Earthquake: Addendum Report by Associate Professor Jason M. Ingham and Professor Michael C. Griffith, October 2011The Performance of Earthquake Strengthened URM Buildings in the Christchurch CBD in the 22 February 2011 Earthquake: Addendum Report by Associate Professor Jason M. Ingham and Professor Michael C. Griffith, October 2011
        • Griffith, Michael C
        • Ingham, Jason M
        • University of Auckland
          Technical Report
          Unreinforced Masonry Buildings (URM)
          2011-11-0303 November 2011Performance of Unreinforced Masonry Buildings in the 2010/2011 Canterbury Earthquake Swarm: Peer Review by Fred Turner, September 2011Performance of Unreinforced Masonry Buildings in the 2010/2011 Canterbury Earthquake Swarm: Peer Review by Fred Turner, September 2011
            Turner, Fred
            Technical Report
            Unreinforced Masonry Buildings (URM)
            2011-11-0202 November 2011Letter from David Nummy of Unitec to the Royal Commission regarding engineering qualificationsLetter from David Nummy of Unitec to the Royal Commission regarding engineering qualifications
            • Nummy, David
            • Unitec
            • Submission
            • Technical Report
              Engineering
              2011-11-0202 November 2011Canterbury Earthquakes Royal Commission summary of the IPENZ report 'Standards and Regulation for Building Construction in New Zealand'Canterbury Earthquakes Royal Commission summary of the IPENZ report 'Standards and Regulation for Building Construction in New Zealand'
                Canterbury Earthquakes Royal Commission
                Technical Report
                Standards and Regulation
                2011-11-0202 November 2011Structural and Geotechnical Engineering Education: Submission by Faculty of Engineering, University of Auckland, August 2011Structural and Geotechnical Engineering Education: Submission by Faculty of Engineering, University of Auckland, August 2011
                • Davies, Michael C R
                • Pender, Michael
                • Quenneville, Pierre
                • Submission
                • Technical Report
                  Training and Education
                  2011-10-2121 October 2011Stairs and Access Ramps Between Floors in Multi-Storey Buildings: Technical Report by Des Bull, August 2011Stairs and Access Ramps Between Floors in Multi-Storey Buildings: Technical Report by Des Bull, August 2011
                  • Bull, Des
                  • Holmes Consulting Group
                    Technical Report
                  • Engineering
                  • Stairs and Floors
                    2011-10-2121 October 2011Performance of Unreinforced Masonry in the 2010/2011 Canterbury Earthquake Swarm: Peer Review by Fred Turner, August 2011Performance of Unreinforced Masonry in the 2010/2011 Canterbury Earthquake Swarm: Peer Review by Fred Turner, August 2011
                      Turner, Fred
                      Technical Report
                      Unreinforced Masonry Buildings (URM)
                      2011-10-2121 October 2011System of Building Controls: Letter by Department of Building and Housing to Royal Commission regarding requested documents relating to building failure caused by Canterbury earthquakes, May 2011System of Building Controls: Letter by Department of Building and Housing to Royal Commission regarding requested documents relating to building failure caused by Canterbury earthquakes, May 2011
                      • Bach, Katrina
                      • Department of Building and Housing
                        Technical Report
                      • Building Failure
                      • Engineering
                      • Standards and Regulation
                        2011-10-2121 October 2011System of Building Controls - Building regulatory framework, May 2011: Briefing to Royal Commission of Inquiry into building failure caused by Canterbury Earthquakes: Technical Report by the Department of Building and Housing, May 2005System of Building Controls - Building regulatory framework, May 2011: Briefing to Royal Commission of Inquiry into building failure caused by Canterbury Earthquakes: Technical Report by the Department of Building and Housing, May 2005
                          Department of Building and Housing
                          Technical Report
                          Standards and Regulation
                          2011-10-2121 October 2011System of Building Controls - Building Act Review Cabinet Papers: Technical Report by New Zealand Cabinet, May 2011System of Building Controls - Building Act Review Cabinet Papers: Technical Report by New Zealand Cabinet, May 2011
                          • Department of Building and Housing
                          • New Zealand Cabinet
                            Technical Report
                            Standards and Regulation
                            2011-10-2121 October 2011System of Building Controls - Regulation of Registered Architects - Registered Architects Act 2005 and Registered Architects Rules 2006: Technical Report by New Zealand Cabinet, 2006System of Building Controls - Regulation of Registered Architects - Registered Architects Act 2005 and Registered Architects Rules 2006: Technical Report by New Zealand Cabinet, 2006
                            • Department of Building and Housing
                            • New Zealand Cabinet
                              Technical Report
                            • Standards and Regulation
                            • Training and Education
                              2011-10-2121 October 2011System of Building Controls - Exhibit A and appendix A of the Briefing to Royal Commission of Inquiry into building failure caused by Canterbury Earthquakes about the Building Regulatory Framework: Technical report by Department of Building and Housing, May 2011System of Building Controls - Exhibit A and appendix A of the Briefing to Royal Commission of Inquiry into building failure caused by Canterbury Earthquakes about the Building Regulatory Framework: Technical report by Department of Building and Housing, May 2011
                                Department of Building and Housing
                                Technical Report
                                Standards and Regulation
                                2011-10-2121 October 2011System of Building Controls - Appendix A, Section 2: The building regulatory system - Performance-based building regulatory systems: Principles and experiences: Technical Report by Inter-Jurisdictional Regulatory Collaboration Committee, February 2010System of Building Controls - Appendix A, Section 2: The building regulatory system - Performance-based building regulatory systems: Principles and experiences: Technical Report by Inter-Jurisdictional Regulatory Collaboration Committee, February 2010
                                • Department of Building and Housing
                                • Inter-jurisdictional Regulatory Collaboration Committee (IRCC)
                                • Meacham, Brian J
                                  Technical Report
                                  Standards and Regulation
                                  2011-10-2121 October 2011System of Building Controls - Appendix A, Section 4: Building Act tools for the upgrading of the structural performance of buildings - Earthquake-Prone Building Provisions of the Building Act 2004: Policy Guidance for Territorial Authorities: Technical Report by Department of Building and Housing, June 2005System of Building Controls - Appendix A, Section 4: Building Act tools for the upgrading of the structural performance of buildings - Earthquake-Prone Building Provisions of the Building Act 2004: Policy Guidance for Territorial Authorities: Technical Report by Department of Building and Housing, June 2005
                                    Department of Building and Housing
                                    Technical Report
                                    Standards and Regulation
                                    2011-10-2121 October 2011System of Building Controls - Appendix A, Section 4: Building Act tools for the upgrading of the structural performance of buildings assessment and improvement of the structural performance of buildings in earthquakes: Technical report by New Zealand Society for Earthquake Engineering, June 2006System of Building Controls - Appendix A, Section 4: Building Act tools for the upgrading of the structural performance of buildings assessment and improvement of the structural performance of buildings in earthquakes: Technical report by New Zealand Society for Earthquake Engineering, June 2006
                                    • Department of Building and Housing
                                    • New Zealand Society for Earthquake Engineering
                                      Technical Report
                                    • Standards and Regulation
                                    • Unreinforced Masonry Buildings (URM)
                                      2011-10-2121 October 2011System of Building Controls - Appendix A, Section 5: rapid assessment of buildings during a state of emergency - Building safety evaluation during a state of emergency - Guidelines for Territorial Authorities: Technical Report by New Zealand Society for Earthquake Engineering, August 2009System of Building Controls - Appendix A, Section 5: rapid assessment of buildings during a state of emergency - Building safety evaluation during a state of emergency - Guidelines for Territorial Authorities: Technical Report by New Zealand Society for Earthquake Engineering, August 2009
                                      • Department of Building and Housing
                                      • New Zealand Society for Earthquake Engineering
                                        Technical Report
                                      • Emergency Powers and Procedures
                                      • Safety Evaluation
                                      • Standards and Regulation
                                        2011-10-2121 October 2011System of Building Controls - Appendix A, Section 6 - Investigation by the Department of Building and Housing into the building collapses - Technical investigation into the performance of buildings in the Christchurch CBD in the 22 February Christchurch aftershock: Technical Report by Department of Building and Housing, September 2011System of Building Controls - Appendix A, Section 6 - Investigation by the Department of Building and Housing into the building collapses - Technical investigation into the performance of buildings in the Christchurch CBD in the 22 February Christchurch aftershock: Technical Report by Department of Building and Housing, September 2011
                                          Department of Building and Housing
                                          Technical Report
                                        • Building Failure
                                        • Standards and Regulation

                                          Search results navigation

                                          Displaying 43 - 62 of 76 items arrow left First arrow left Prev arrow right Next arrow right Last