Canterbury Earthquakes Royal Commission Te Komihana Rūwhenua o Waitaha Canterbury Earthquakes Royal Commission – Te Komihana Rūwhenua o Waitaha

Those who lost relatives and friends in the 22 February earthquake can be assured that there will be a very thorough inquiry into the failure of buildings that resulted in loss of life.
Chair, Justice Mark Cooper

Document library

Document categories

Additional filter options

Choose 1 or more filters then press 'Apply filter'
Reset

Search results

Published No sorted Title Not sorted Author(s) Not sorted Category Not sorted Subject(s) Not sorted Building(s) Sorted descending Action
2012-11-27-17- 00-5927 November 2012Report of the Minister for the Environment's Resource Management Act 1991 Principles, February 2012Report of the Minister for the Environment's Resource Management Act 1991 Principles, February 2012
    Ministry for the Environment
    Referenced Document
    Emergency Powers and Procedures
    2012-11-27-17- 03-1527 November 2012Estimated Damage and Casualties from Earthquakes Affecting Christchurch, report by GNS Estimated Damage and Casualties from Earthquakes Affecting Christchurch, report by GNS
      GNS Science
      Referenced Document
      Seismicity
      2012-11-28-08- 47-5428 November 2012Briefing to the incoming Minister for Canterbury Earthquake Recovery by the Canterbury Earthquake Recovery Authority (CERA), December 2011Briefing to the incoming Minister for Canterbury Earthquake Recovery by the Canterbury Earthquake Recovery Authority (CERA), December 2011
        Canterbury Earthquake Recovery Authority (CERA)
        Referenced Document
        Christchurch Recovery
        2012-11-28-12- 10-0728 November 2012Update to GNS Science/University of Canterbury July 2011 Report entitled The Canterbury Earthquake Sequence and Implications for Seismic Design Levels, dated 2 April 2012Update to GNS Science/University of Canterbury July 2011 Report entitled The Canterbury Earthquake Sequence and Implications for Seismic Design Levels, dated 2 April 2012
        • Bannister, Stephen
        • Kaiser, Anna
        • Webb, T H (Terry)
          Referenced Document
          Seismicity
          2012-12-05-23- 21-5005 December 2012Structural Damage Report on the Novotel Hotel, 52 Cathedral Square dated 23 August 2011Structural Damage Report on the Novotel Hotel, 52 Cathedral Square dated 23 August 2011
            Lewis Bradford Consulting Engineers
              Buildings - Representative Sample
              2011-11-07-14- 24-3007 November 2011Report into Building Safety Evaluation Processes in the Central Business District Following the 4 September 2010 Earthquake: Technical Report by the Christchurch City Council, August 2011Report into Building Safety Evaluation Processes in the Central Business District Following the 4 September 2010 Earthquake: Technical Report by the Christchurch City Council, August 2011
                Christchurch City Council
                Technical Report
                Placarding (Stickering)
                2011-11-02-12- 48-2502 November 2011Letter from David Nummy of Unitec to the Royal Commission regarding engineering qualificationsLetter from David Nummy of Unitec to the Royal Commission regarding engineering qualifications
                • Nummy, David
                • Unitec
                • Submission
                • Technical Report
                  Engineering
                  2011-11-02-12- 47-3602 November 2011Canterbury Earthquakes Royal Commission summary of the IPENZ report 'Standards and Regulation for Building Construction in New Zealand'Canterbury Earthquakes Royal Commission summary of the IPENZ report 'Standards and Regulation for Building Construction in New Zealand'
                    Canterbury Earthquakes Royal Commission
                    Technical Report
                    Standards and Regulation
                    2011-11-02-12- 48-1102 November 2011Structural and Geotechnical Engineering Education: Submission by Faculty of Engineering, University of Auckland, August 2011Structural and Geotechnical Engineering Education: Submission by Faculty of Engineering, University of Auckland, August 2011
                    • Davies, Michael C R
                    • Pender, Michael
                    • Quenneville, Pierre
                    • Submission
                    • Technical Report
                      Training and Education
                      2012-02-16-15- 01-4116 February 2012Submission by Institution of Professional Engineers New Zealand (IPENZ), 9 December 2011Submission by Institution of Professional Engineers New Zealand (IPENZ), 9 December 2011
                        Institution of Professional Engineers New Zealand (IPENZ)
                        Submission
                      • Standards and Regulation
                      • Training and Education
                        2012-11-28-12- 22-3228 November 2012Summary by Dr Terry Webb of recent seismic hazard modelling by GNS ScienceSummary by Dr Terry Webb of recent seismic hazard modelling by GNS Science
                        • GNS Science
                        • Webb, T H (Terry)
                          Referenced Document
                          Seismicity
                          2012-11-27-16- 27-1527 November 2012Email correspondence between Jason Dowse, CERA and Royal Commission regarding Section 52 CERA ActEmail correspondence between Jason Dowse, CERA and Royal Commission regarding Section 52 CERA Act
                          • Canterbury Earthquake Recovery Authority (CERA)
                          • Canterbury Earthquakes Royal Commission
                          • Dowse, Jason
                            Referenced Document
                          • Emergency Powers and Procedures
                          • Standards and Regulation
                            2012-11-27-16- 01-5627 November 2012Theoretical stress-strain model for confined concrete, article by J.B. Mander, N.J.M. Priestley and R. ParkTheoretical stress-strain model for confined concrete, article by J.B. Mander, N.J.M. Priestley and R. Park
                            • Mander, John
                            • Park, R
                            • Priestley, Nigel
                              Referenced Document
                              Engineering
                              2011-10-21-11- 33-0721 October 2011Z-factor Graph: Technical Report by GNS Science, October 2011Z-factor Graph: Technical Report by GNS Science, October 2011
                              • GNS Science
                              • Webb, T H (Terry)
                              • Exhibit
                              • Technical Report
                                Seismicity
                                2012-10-26-14- 47-0126 October 2012Seismic Performance Investigation Draft Report of Clarendon Tower - 78 Worcester Street: Report by Bill Holmes and Reid Zimmerman of Rutherford & Chekene, February 2012Seismic Performance Investigation Draft Report of Clarendon Tower - 78 Worcester Street: Report by Bill Holmes and Reid Zimmerman of Rutherford & Chekene, February 2012
                                • Holmes, William T
                                • Rutherford & Chekene
                                • Zimmerman, Reid
                                  Technical Report
                                  Buildings - Representative Sample
                                  Worcester 78
                                2012-02-02-15- 10-1102 February 2012Worcester 391 hearing: Photographs of 391 Worcester Street provided by building owner Pak Loke Worcester 391 hearing: Photographs of 391 Worcester Street provided by building owner Pak Loke
                                  Loke, Pak
                                  Exhibit
                                  Buildings - Representative Sample
                                  Worcester 391
                                2011-12-19-09- 20-3019 December 20112011-12-15 Individual Buildings (Except CTV & PGC) Whose Failure Resulted in Loss of Life hearing transcript2011-12-15 Individual Buildings (Except CTV & PGC) Whose Failure Resulted in Loss of Life hearing transcript
                                  Speakers - Various
                                  Transcript
                                  Buildings - Representative Sample
                                  Worcester 391
                                2011-12-15-11- 48-4315 December 2011Worcester 391 hearing: Photographs of Wick's Fish ShopWorcester 391 hearing: Photographs of Wick's Fish Shop
                                  Hadfield, Geoffrey
                                  Exhibit
                                  Buildings - Representative Sample
                                  Worcester 391
                                2011-12-15-11- 48-2715 December 2011Worcester 391 hearing: Photographs of 389A Worcester St, pre and post 22 February 2011 earthquake Worcester 391 hearing: Photographs of 389A Worcester St, pre and post 22 February 2011 earthquake
                                  Hadfield, Geoffrey
                                  Exhibit
                                  Buildings - Representative Sample
                                  Worcester 391
                                2011-12-15-11- 50-0915 December 2011Worcester 391 hearing: Independent Assessment of Earthquake Performance of 391 Worcester Street: Report by Peter Smith and Jonathan Devine of Spencer Holmes LtdWorcester 391 hearing: Independent Assessment of Earthquake Performance of 391 Worcester Street: Report by Peter Smith and Jonathan Devine of Spencer Holmes Ltd
                                • Devine, Jonathan
                                • Smith, Peter
                                • Spencer Holmes Ltd
                                  Exhibit
                                  Buildings - Representative Sample
                                  Worcester 391

                                Search results navigation

                                Displaying 432 - 451 of 1517 items arrow left First arrow left Prev arrow right Next arrow right Last