Canterbury Earthquakes Royal Commission Te Komihana Rūwhenua o Waitaha Canterbury Earthquakes Royal Commission – Te Komihana Rūwhenua o Waitaha

Those who lost relatives and friends in the 22 February earthquake can be assured that there will be a very thorough inquiry into the failure of buildings that resulted in loss of life.
Chair, Justice Mark Cooper

Document library

Document categories

Additional filter options

Choose 1 or more filters then press 'Apply filter'
Reset

Search results

Published No sorted Title Not sorted Author(s) Not sorted Category Not sorted Subject(s) Not sorted Building(s) Sorted descending Action
2011-11-15-09- 23-2215 November 20112011-10-17 Opening Address for The Commission of Inquiry from Counsel Assisting the Commission Stephen Mills, QC 2011-10-17 Opening Address for The Commission of Inquiry from Counsel Assisting the Commission Stephen Mills, QC
  • Canterbury Earthquakes Royal Commission
  • Mills, Stephen
    Transcript
    Opening Statement
    2011-11-10-10- 12-0910 November 2011Letter from Kapiti Coast District Council about unreinforced masonry (URM) and earthquake-prone building policiesLetter from Kapiti Coast District Council about unreinforced masonry (URM) and earthquake-prone building policies
      Smith, Ken
      RFI Response
      Standards and Regulation
      2011-10-18-17- 34-4718 October 2011Structural Design Actions-Part 5 Earthquake Actions New Zealand from Standards New Zealand. Sec 2: Verification, Sec 3: Site Hazard SpectraStructural Design Actions-Part 5 Earthquake Actions New Zealand from Standards New Zealand. Sec 2: Verification, Sec 3: Site Hazard Spectra
        Standards New Zealand
        Exhibit
        Standards and Regulation
        2011-11-10-10- 02-3810 November 2011Letter from Opotiki District Council about unreinforced masonry (URM) and earthquake-prone building policiesLetter from Opotiki District Council about unreinforced masonry (URM) and earthquake-prone building policies
          Chapman, Stu
          RFI Response
          Standards and Regulation
          2011-11-10-10- 24-0110 November 2011Request for information response from Hastings District Council about unreinforced masonry (URM) and earthquake-prone building policiesRequest for information response from Hastings District Council about unreinforced masonry (URM) and earthquake-prone building policies
            Hastings District Council
            RFI Response
          • RFI and EOI
          • Unreinforced Masonry Buildings (URM)
            2011-11-10-10- 04-0910 November 2011Letter from Napier City Council about unreinforced masonry (URM) and earthquake-prone building policiesLetter from Napier City Council about unreinforced masonry (URM) and earthquake-prone building policies
            • Napier City Council
            • Taylor, Neil
              RFI Response
              Standards and Regulation
              2011-11-07-14- 26-5407 November 2011Report into Building Safety Evaluation in the Central Business District Following the 4 September 2010 Earthquake: Technical Report by the Christchurch City Council, August 2011, Part 5 of 5, Page 171-196Report into Building Safety Evaluation in the Central Business District Following the 4 September 2010 Earthquake: Technical Report by the Christchurch City Council, August 2011, Part 5 of 5, Page 171-196
                Christchurch City Council
                Technical Report
                Placarding (Stickering)
                2011-11-07-14- 27-4207 November 2011Report into Building Safety Evaluation in the Central Business District Following the 4 September 2010 Earthquake: Technical Report by the Christchurch City Council, August 2011, Part 2 of 5, Page 81-117Report into Building Safety Evaluation in the Central Business District Following the 4 September 2010 Earthquake: Technical Report by the Christchurch City Council, August 2011, Part 2 of 5, Page 81-117
                  Christchurch City Council
                  Technical Report
                  Placarding (Stickering)
                  2011-11-08-13- 48-3508 November 2011Background on California Seismic Safety Commission: Presentation by Fred Turner, November 2011Background on California Seismic Safety Commission: Presentation by Fred Turner, November 2011
                    Turner, Fred
                    Exhibit
                    Unreinforced Masonry Buildings (URM)
                    2011-11-07-14- 28-1507 November 2011Report into Building Safety Evaluation in the Central Business District Following the 4 September 2010 Earthquake: Technical Report by the Christchurch City Council, August 2011, Part 3 of 5, Page 118 -146Report into Building Safety Evaluation in the Central Business District Following the 4 September 2010 Earthquake: Technical Report by the Christchurch City Council, August 2011, Part 3 of 5, Page 118 -146
                      Christchurch City Council
                      Technical Report
                      Placarding (Stickering)
                      2011-11-07-14- 28-4607 November 2011Report into Building Safety Evaluation in the Central Business District Following the 4 September 2010 Earthquake: Technical Report by the Christchurch City Council, August 2011, Part 4 of 5, Page 147-170Report into Building Safety Evaluation in the Central Business District Following the 4 September 2010 Earthquake: Technical Report by the Christchurch City Council, August 2011, Part 4 of 5, Page 147-170
                        Christchurch City Council
                        Technical Report
                        Placarding (Stickering)
                        2011-11-09-16- 02-2809 November 2011Hearings on Earthquake-prone Buildings: Presentation (Submission) by David Hopkins, November 2011Hearings on Earthquake-prone Buildings: Presentation (Submission) by David Hopkins, November 2011
                          Hopkins, David
                          Exhibit
                          Unreinforced Masonry Buildings (URM)
                          2011-11-28-18- 43-1528 November 2011Curriculum Vitae for Nigel PriestleyCurriculum Vitae for Nigel Priestley
                            Priestley, Nigel
                            Speaker Profile
                            Profile
                            2012-03-12-12- 56-2612 March 20122011-11-15 Unreinforced Masonry (URM) Buildings and Earthquake-Prone Policies hearing transcript2011-11-15 Unreinforced Masonry (URM) Buildings and Earthquake-Prone Policies hearing transcript
                              Various
                              Transcript
                              Unreinforced Masonry Buildings (URM)
                              2011-12-15-10- 33-5915 December 2011Christchurch Past, Present and Future: Submission from Kenneth Sibly, November 2011Christchurch Past, Present and Future: Submission from Kenneth Sibly, November 2011
                                Sibly, Ken
                                Submission
                              • Central Business District (CBD)
                              • Culture and Heritage
                              • Geotechnical
                                2012-03-12-13- 05-4612 March 2012Requirement for Future Buildings: Submission by Rod Fulford on behalf of Precast New Zealand Inc, December 2011Requirement for Future Buildings: Submission by Rod Fulford on behalf of Precast New Zealand Inc, December 2011
                                • Fulford, Rod
                                • Precast New Zealand Inc
                                • Exhibit
                                • Submission
                                • Engineering
                                • New Building Technologies
                                  2012-03-12-12- 59-2412 March 20122011-10-18 Seismicity hearing transcript2011-10-18 Seismicity hearing transcript
                                  • Ford, Rachael
                                  • McVerry, Graeme
                                  • Pettinga, Jarg
                                  • Webb, T H (Terry)
                                    Transcript
                                  • Geotechnical
                                  • Seismicity
                                    2012-09-14-13- 43-2714 September 20122012-09-11 Roles and Responsibilities hearing transcript2012-09-11 Roles and Responsibilities hearing transcript
                                      Speakers - Various
                                      Transcript
                                      Roles and Responsibilities
                                      2012-09-13-10- 06-4013 September 2012IPENZ engineering ethics webinar slidesIPENZ engineering ethics webinar slides
                                        Institution of Professional Engineers New Zealand (IPENZ)
                                        Post hearing submission
                                      • Engineering
                                      • Training and Education
                                        2012-09-13-09- 59-2813 September 2012Table of actions initiated by IPENZ following the 2003 Structural TaskforceTable of actions initiated by IPENZ following the 2003 Structural Taskforce
                                          Institution of Professional Engineers New Zealand (IPENZ)
                                          Post hearing submission
                                        • Engineering
                                        • Training and Education

                                          Search results navigation

                                          Displaying 291 - 310 of 1517 items arrow left First arrow left Prev arrow right Next arrow right Last