Canterbury Earthquakes Royal Commission Te Komihana Rūwhenua o Waitaha Canterbury Earthquakes Royal Commission – Te Komihana Rūwhenua o Waitaha

Those who lost relatives and friends in the 22 February earthquake can be assured that there will be a very thorough inquiry into the failure of buildings that resulted in loss of life.
Chair, Justice Mark Cooper

Document library

Document categories

Additional filter options

Choose 1 or more filters then press 'Apply filter'
Reset

Search results

Published No sorted Title Not sorted Author(s) Not sorted Category Not sorted Subject(s) Not sorted Building(s) Sorted descending Action
2012-04-02-11- 02-0402 April 2012PGC Building hearing: Post-hearing submission of Holmes Consulting Group in relation to the PGC BuildingPGC Building hearing: Post-hearing submission of Holmes Consulting Group in relation to the PGC Building
    Holmes Consulting Group
  • Post hearing submission
  • Submission
    Buildings - Representative Sample
    Cambridge 233
2011-12-05-11- 09-5905 December 2011Cambridge 233 PGC Building: Department of Building and Housing Investigation of Key Building Performance Report - Appendix 4: Communication letter regarding refurbishmentCambridge 233 PGC Building: Department of Building and Housing Investigation of Key Building Performance Report - Appendix 4: Communication letter regarding refurbishment
    Pyne Gould Corporation Ltd
    Exhibit
    Buildings - Representative Sample
    Cambridge 233
2012-08-06-15- 01-1106 August 2012CTV Building hearing: Photographs of the CTV and PGC buildings under constructionCTV Building hearing: Photographs of the CTV and PGC buildings under construction
    Breach, Rex
    Exhibit
    Buildings - Representative Sample
    Cambridge 233
2012-03-12-12- 44-4412 March 20122011-12-06 PGC Building hearing transcript2011-12-06 PGC Building hearing transcript
  • Holmes, William T
  • Jury, Rob
  • Priestley, Nigel
  • Sharpe, Richard
    Transcript
    Buildings - Representative Sample
    Cambridge 233
2011-12-02-15- 08-1602 December 20112011-12-01 PGC building hearing transcript2011-12-01 PGC building hearing transcript
  • Canterbury Earthquakes Royal Commission
  • Cooper, Justice
    Transcript
    Buildings - Representative Sample
    Cambridge 233
2011-12-01-16- 30-3501 December 20112011-11-28 PGC building hearing transcript2011-11-28 PGC building hearing transcript
    Various
    Transcript
    Buildings - Representative Sample
    Cambridge 233
2011-12-01-16- 24-3501 December 20112011-11-29 PGC Building hearing transcript2011-11-29 PGC Building hearing transcript
    Various
    Transcript
    Buildings - Representative Sample
    Cambridge 233
2011-11-28-17- 33-5728 November 2011Cambridge 233 PGC building: seismic evaluation of existing building in April 1997 by Holmes Consulting GroupCambridge 233 PGC building: seismic evaluation of existing building in April 1997 by Holmes Consulting Group
    Kelly, Trevor Edward
    Exhibit
    Buildings - Representative Sample
    Cambridge 233
2012-02-23-12- 23-1123 February 2012Forsyth Barr hearing: Review by Holmes Consulting Group of technical investigation reports prepared for Department of Building and HousingForsyth Barr hearing: Review by Holmes Consulting Group of technical investigation reports prepared for Department of Building and Housing
  • Black, Bruce
  • Holmes Consulting Group
    Opening Statement
  • Buildings - Representative Sample
  • Engineering
    Cambridge 233
2011-11-28-15- 50-3828 November 2011Cambridge 233 PGC Building: Conversion plans and costs for PGC Group from Holmes Consulting Group to Warren and Mahoney, 17 February 1997Cambridge 233 PGC Building: Conversion plans and costs for PGC Group from Holmes Consulting Group to Warren and Mahoney, 17 February 1997
  • Holmes Consulting Group
  • Wilkinson, Grant
    Exhibit
    Buildings - Representative Sample
    Cambridge 233
2011-11-30-14- 41-1330 November 2011Cambridge 233 PGC Building: Photographic summary of primary damage observed from Department of Building and Housing, 16 September 2010Cambridge 233 PGC Building: Photographic summary of primary damage observed from Department of Building and Housing, 16 September 2010
    Department of Building and Housing
      Buildings - Representative Sample
      Cambridge 233
    2011-11-30-12- 29-0530 November 2011Cambridge 233 PGC Building: Rapid Structural Assessment and Re-inspection after 4 September 2010Cambridge 233 PGC Building: Rapid Structural Assessment and Re-inspection after 4 September 2010
    • Holmes Consulting Group
    • Whiteside, Mark
      Exhibit
      Buildings - Representative Sample
      Cambridge 233
    2011-11-28-16- 06-5628 November 2011Cambridge 233 PGC Building: Letter and documents from Holmes Consulting Group regarding information on the PGC BuildingCambridge 233 PGC Building: Letter and documents from Holmes Consulting Group regarding information on the PGC Building
    • Black, Bruce
    • Hare, John
    • Holmes Consulting Group
      Exhibit
      Buildings - Representative Sample
      Cambridge 233
    2011-11-29-16- 24-4929 November 2011Cambridge 233 PGC Building: Statutory Declaration Given by Henry John Hare to DLA Phillips FoxCambridge 233 PGC Building: Statutory Declaration Given by Henry John Hare to DLA Phillips Fox
      Hare, John
      Exhibit
      Buildings - Representative Sample
      Cambridge 233
    2011-11-28-16- 37-5428 November 2011Cambridge 233 PGC Building: Email correspondence between Education Review Office, tenants at 233 Cambridge Terrace, and NAI Harcourts regarding ceiling inspection and repairCambridge 233 PGC Building: Email correspondence between Education Review Office, tenants at 233 Cambridge Terrace, and NAI Harcourts regarding ceiling inspection and repair
    • Education Review Office
    • Harcourt Insulation (2006) Ltd
      Exhibit
      Buildings - Representative Sample
      Cambridge 233
    2011-11-28-16- 38-4428 November 2011Cambridge 233 PGC Building: Email correspondence between Education Review Office, tenants at 233 Cambridge Terrace, and NAI Harcourts regarding removal of Level 3 ceiling tilesCambridge 233 PGC Building: Email correspondence between Education Review Office, tenants at 233 Cambridge Terrace, and NAI Harcourts regarding removal of Level 3 ceiling tiles
    • Education Review Office
    • Harcourt Insulation (2006) Ltd
      Exhibit
      Buildings - Representative Sample
      Cambridge 233
    2011-11-29-12- 00-5729 November 2011Cambridge 233 PGC Building: Chronology from 1963 to 2011Cambridge 233 PGC Building: Chronology from 1963 to 2011
      Canterbury Earthquakes Royal Commission
      Exhibit
      Buildings - Representative Sample
      Cambridge 233
    2011-11-28-15- 31-2528 November 2011Cambridge 233 PGC Building: Chronology of PGC Building from 1963 to 2011 Cambridge 233 PGC Building: Chronology of PGC Building from 1963 to 2011
      Canterbury Earthquakes Royal Commission
      Exhibit
      Buildings - Representative Sample
      Cambridge 233
    2011-11-28-15- 12-2928 November 2011Cambridge 233 PGC Building: Photographs showing building comparison before and after 22 February 2011 earthquakeCambridge 233 PGC Building: Photographs showing building comparison before and after 22 February 2011 earthquake
      Canterbury Earthquakes Royal Commission
      Exhibit
      Buildings - Representative Sample
      Cambridge 233
    2011-11-28-18- 26-1428 November 2011Cambridge 233 PGC Building: Rapid assessment form - Level 1 and Christchurch City Council inspection form templateCambridge 233 PGC Building: Rapid assessment form - Level 1 and Christchurch City Council inspection form template
      Christchurch City Council
      Exhibit
      Buildings - Representative Sample
      Cambridge 233

    Search results navigation

    Displaying 1481 - 1500 of 1517 items arrow left First arrow left Prev arrow right Next arrow right Last