Canterbury Earthquakes Royal Commission Te Komihana Rūwhenua o Waitaha Canterbury Earthquakes Royal Commission – Te Komihana Rūwhenua o Waitaha

Those who lost relatives and friends in the 22 February earthquake can be assured that there will be a very thorough inquiry into the failure of buildings that resulted in loss of life.
Chair, Justice Mark Cooper

Document library

Document categories

Additional filter options

Choose 1 or more filters then press 'Apply filter'
Reset

Search results

Published No sorted Title Not sorted Author(s) Not sorted Category Not sorted Subject(s) Not sorted Building(s) Sorted ascending Action
2011-11-15-09- 17-0315 November 20112011-11-07 Unreinforced Masonry (URM) Buildings and Earthquake-Prone Policies hearing transcript2011-11-07 Unreinforced Masonry (URM) Buildings and Earthquake-Prone Policies hearing transcript
  • Chapman, Bruce
  • Ingham, Jason M
    Transcript
    Unreinforced Masonry Buildings (URM)
    2012-09-13-09- 59-2813 September 2012Table of actions initiated by IPENZ following the 2003 Structural TaskforceTable of actions initiated by IPENZ following the 2003 Structural Taskforce
      Institution of Professional Engineers New Zealand (IPENZ)
      Post hearing submission
    • Engineering
    • Training and Education
      2012-09-11-16- 42-3811 September 2012Roles and responsibilities hearing: Presentation by John Lumsdon and Debbie Chin of the Standards CouncilRoles and responsibilities hearing: Presentation by John Lumsdon and Debbie Chin of the Standards Council
      • Chin, Debbie
      • Lumsdon, John
      • Standards Council
        Exhibit
        Roles and Responsibilities
        2011-11-10-10- 12-0910 November 2011Letter from Kapiti Coast District Council about unreinforced masonry (URM) and earthquake-prone building policiesLetter from Kapiti Coast District Council about unreinforced masonry (URM) and earthquake-prone building policies
          Smith, Ken
          RFI Response
          Standards and Regulation
          2012-11-27-15- 44-5627 November 2012Draft Central City Plan, August 2011, Volume 2Draft Central City Plan, August 2011, Volume 2
            Christchurch City Council
            Referenced Document
          • Central Business District (CBD)
          • Christchurch Recovery
          • Standards and Regulation
            2012-11-28-08- 47-5428 November 2012Briefing to the incoming Minister for Canterbury Earthquake Recovery by the Canterbury Earthquake Recovery Authority (CERA), December 2011Briefing to the incoming Minister for Canterbury Earthquake Recovery by the Canterbury Earthquake Recovery Authority (CERA), December 2011
              Canterbury Earthquake Recovery Authority (CERA)
              Referenced Document
              Christchurch Recovery
              2011-11-28-18- 43-1528 November 2011Curriculum Vitae for Nigel PriestleyCurriculum Vitae for Nigel Priestley
                Priestley, Nigel
                Speaker Profile
                Profile
                2012-11-27-16- 27-1527 November 2012Email correspondence between Jason Dowse, CERA and Royal Commission regarding Section 52 CERA ActEmail correspondence between Jason Dowse, CERA and Royal Commission regarding Section 52 CERA Act
                • Canterbury Earthquake Recovery Authority (CERA)
                • Canterbury Earthquakes Royal Commission
                • Dowse, Jason
                  Referenced Document
                • Emergency Powers and Procedures
                • Standards and Regulation
                  2012-08-22-13- 23-0222 August 2012Roles and Responsibilities: Submission from Dr David Hopkins on the Royal Commission Discussion Paper, August 2012Roles and Responsibilities: Submission from Dr David Hopkins on the Royal Commission Discussion Paper, August 2012
                    Hopkins, David
                    Submission
                  • Roles and Responsibilities
                  • Standards and Regulation
                    2011-10-19-17- 06-5619 October 2011Structural Design Actions-Part 5 Earthquake Actions New Zealand from Standards New Zealand. Sec 2: Verification, Sec 3: Site Hazard SpectraStructural Design Actions-Part 5 Earthquake Actions New Zealand from Standards New Zealand. Sec 2: Verification, Sec 3: Site Hazard Spectra
                      Standards New Zealand
                      Exhibit
                      Standards and Regulation
                      2012-09-06-09- 14-1906 September 20122012-09-04 Building Management after Earthquakes hearing transcript2012-09-04 Building Management after Earthquakes hearing transcript
                        Speakers - Various
                        Transcript
                        Building assessments after earthquakes
                        2012-03-12-13- 07-3512 March 2012Presentation by Dr Rajesh Prasad Dhakal, University of Canterbury, for the hearing on New Building Technologies Presentation by Dr Rajesh Prasad Dhakal, University of Canterbury, for the hearing on New Building Technologies
                          Dhakal, Rajesh P
                          Exhibit
                          New Building Technologies
                          2012-09-13-11- 21-1913 September 2012National Building Consent Authority Competency Assessment System: Department of Building and Housing guidance documentNational Building Consent Authority Competency Assessment System: Department of Building and Housing guidance document
                            Department of Building and Housing
                            Post hearing submission
                            Roles and Responsibilities
                            2012-09-13-11- 00-3413 September 2012 IPENZ collection of published articles IPENZ collection of published articles
                              Institution of Professional Engineers New Zealand (IPENZ)
                              Post hearing submission
                            • Engineering
                            • Training and Education
                              2012-03-14-16- 43-3514 March 2012Biography of Dr Nicola Crauford, Genesis Power LtdBiography of Dr Nicola Crauford, Genesis Power Ltd
                                Crauford, Nicola Lane (Nicki)
                                Exhibit
                              • New Building Technologies
                              • Roles and Responsibilities
                                2012-09-04-16- 11-4504 September 2012Building Management after Earthquakes hearing: Christchurch City Council Report into Building Safety Evaluation Processes in the Central Business District following the 22 February 2011 EarthquakeBuilding Management after Earthquakes hearing: Christchurch City Council Report into Building Safety Evaluation Processes in the Central Business District following the 22 February 2011 Earthquake
                                  Christchurch City Council
                                  Exhibit
                                  Building assessments after earthquakes
                                  2012-09-14-14- 09-5414 September 20122012-09-12 Roles and Responsibilities hearing transcript2012-09-12 Roles and Responsibilities hearing transcript
                                    Speakers - Various
                                    Transcript
                                    Roles and Responsibilities
                                    2012-09-12-15- 30-3312 September 2012Roles and responsibilities hearing: Presentation from Geoff Hallam of International Accreditation New Zealand (IANZ) Roles and responsibilities hearing: Presentation from Geoff Hallam of International Accreditation New Zealand (IANZ)
                                    • Hallam, Geoff
                                    • International Accreditation New Zealand (IANZ)
                                      Exhibit
                                      Roles and Responsibilities
                                      2012-08-09-15- 39-3509 August 2012CTV Building hearing: NZS 3101 Part 2: 1982 Commentary on The Design Of Concrete StructuresCTV Building hearing: NZS 3101 Part 2: 1982 Commentary on The Design Of Concrete Structures
                                        Standards New Zealand
                                        Exhibit
                                        Standards and Regulation
                                        2012-03-09-08- 38-5809 March 2012Christchurch - Swamp to City - A Short History of the Christchurch Drainage Board 1875-1989, by John Wilson 1989: Submission by Ken Sibly, September 2011Christchurch - Swamp to City - A Short History of the Christchurch Drainage Board 1875-1989, by John Wilson 1989: Submission by Ken Sibly, September 2011
                                          Wilson, John
                                          Submission
                                          Geotechnical

                                          Search results navigation

                                          Displaying 1427 - 1446 of 1517 items arrow left First arrow left Prev arrow right Next arrow right Last