Canterbury Earthquakes Royal Commission Te Komihana Rūwhenua o Waitaha Canterbury Earthquakes Royal Commission – Te Komihana Rūwhenua o Waitaha

Those who lost relatives and friends in the 22 February earthquake can be assured that there will be a very thorough inquiry into the failure of buildings that resulted in loss of life.
Chair, Justice Mark Cooper

Document library

Document categories

Additional filter options

Choose 1 or more filters then press 'Apply filter'
Reset

Search results

Published No sorted Title Not sorted Author(s) Sorted ascending Category Not sorted Subject(s) Not sorted Building(s) Not sorted Action
2011-11-28-15- 50-3828 November 2011Cambridge 233 PGC Building: Conversion plans and costs for PGC Group from Holmes Consulting Group to Warren and Mahoney, 17 February 1997Cambridge 233 PGC Building: Conversion plans and costs for PGC Group from Holmes Consulting Group to Warren and Mahoney, 17 February 1997
    Holmes Consulting Group
    Exhibit
    Buildings - Representative Sample
    Cambridge 233
2011-11-28-16- 06-5628 November 2011Cambridge 233 PGC Building: Letter and documents from Holmes Consulting Group regarding information on the PGC BuildingCambridge 233 PGC Building: Letter and documents from Holmes Consulting Group regarding information on the PGC Building
    Holmes Consulting Group
    Exhibit
    Buildings - Representative Sample
    Cambridge 233
2012-03-12-13- 26-1612 March 2012Cambridge 233 PGC Building: Standard producer statement - design is not appropriate for building consentCambridge 233 PGC Building: Standard producer statement - design is not appropriate for building consent
    Holmes Consulting Group
    Exhibit
    Buildings - Representative Sample
    Cambridge 233
2012-08-14-16- 24-2014 August 2012CTV Building hearing: Collection of documents in relation to the 1990 Holmes Consulting Group Structural ReportCTV Building hearing: Collection of documents in relation to the 1990 Holmes Consulting Group Structural Report
    Holmes Consulting Group
    Exhibit
    Buildings - Representative Sample
    Madras 249
2011-11-30-12- 29-0530 November 2011Cambridge 233 PGC Building: Rapid Structural Assessment and Re-inspection after 4 September 2010Cambridge 233 PGC Building: Rapid Structural Assessment and Re-inspection after 4 September 2010
    Holmes Consulting Group
    Exhibit
    Buildings - Representative Sample
    Cambridge 233
2012-04-02-11- 04-0902 April 2012PGC Building hearing: Post-hearing submission from Holmes Consulting Group in relation to the PGC Building PGC Building hearing: Post-hearing submission from Holmes Consulting Group in relation to the PGC Building
    Holmes Consulting Group
  • Post hearing submission
  • Submission
    Buildings - Representative Sample
    Cambridge 233
2012-02-24-12- 41-1524 February 2012Forsyth Barr hearing: Detailed seismic assessment - fee proposalForsyth Barr hearing: Detailed seismic assessment - fee proposal
    Holmes Consulting Group
    Opening Statement
    Buildings - Representative Sample
    Colombo 764
2012-03-13-12- 44-0813 March 2012Presentation by John Hare, Holmes Consulting Group, for the hearing on New Building TechnologiesPresentation by John Hare, Holmes Consulting Group, for the hearing on New Building Technologies
    Holmes Consulting Group
    Exhibit
    New Building Technologies
    2012-02-23-12- 23-1123 February 2012Forsyth Barr hearing: Review by Holmes Consulting Group of technical investigation reports prepared for Department of Building and HousingForsyth Barr hearing: Review by Holmes Consulting Group of technical investigation reports prepared for Department of Building and Housing
      Holmes Consulting Group
      Opening Statement
    • Buildings - Representative Sample
    • Engineering
    • Cambridge 233
    • Cashel 161
    • Colombo 764
    2012-02-24-12- 51-5924 February 2012Forsyth Barr hearing: Supplementary Brief of Evidence of Henry John HareForsyth Barr hearing: Supplementary Brief of Evidence of Henry John Hare
      Holmes Consulting Group
      Exhibit
      Buildings - Representative Sample
      Colombo 764
    2012-07-31-15- 27-2331 July 2012CTV Building hearing: Collection of documents in relation to the 1990 Holmes Consulting Group Structural Report on the Office Building at 249 Madras Street CTV Building hearing: Collection of documents in relation to the 1990 Holmes Consulting Group Structural Report on the Office Building at 249 Madras Street
      Holmes Consulting Group
      Exhibit
      Buildings - Representative Sample
      Madras 249
    2012-11-27-15- 47-0727 November 2012 CTV Building: Investigation into the Influence of Strain-Ageing on the Seismic Performance of the Reinforcing Steel from the CTV Building CTV Building: Investigation into the Influence of Strain-Ageing on the Seismic Performance of the Reinforcing Steel from the CTV Building
      Holmes Solutions
      Referenced Document
      Buildings - Representative Sample
      Madras 249
    2012-09-10-11- 39-5110 September 2012Materials Testing in Buildings of Interest - Gallery Apartments, Westpac Centre, IRD Building: Report prepared by Holmes Solutions, November 2011Materials Testing in Buildings of Interest - Gallery Apartments, Westpac Centre, IRD Building: Report prepared by Holmes Solutions, November 2011
      Holmes Solutions
      Technical Report
      Buildings - Representative Sample
    • Cashel 166
    • Cashel 224
    • Gloucester 62
    2012-02-15-17- 59-0215 February 2012High 246 hearing: Architectural plans from Warren & Mahoney Architects Ltd including floor plans, elevation, technical details, and structural designs, part 3 of 5High 246 hearing: Architectural plans from Warren & Mahoney Architects Ltd including floor plans, elevation, technical details, and structural designs, part 3 of 5
      Holmes Wood Poole & Johnstone Ltd
      Exhibit
      Buildings - Representative Sample
      Hereford 152
    2012-02-15-17- 58-5015 February 2012High 246 hearing: Architectural plans from Warren & Mahoney Architects Ltd including floor plans, elevation, technical details, and structural designs, part 1 of 5High 246 hearing: Architectural plans from Warren & Mahoney Architects Ltd including floor plans, elevation, technical details, and structural designs, part 1 of 5
      Holmes Wood Poole & Johnstone Ltd
      Exhibit
      Buildings - Representative Sample
      Hereford 152
    2012-03-12-12- 46-2512 March 2012Review of expert panel and Beca report on PGC building: Presentation by William T HolmesReview of expert panel and Beca report on PGC building: Presentation by William T Holmes
      Holmes, William T
      Exhibit
      Buildings - Representative Sample
      Cambridge 233
    2012-03-12-12- 42-3112 March 2012William T Holmes, Rutherford & Chekene Senior ConsultantWilliam T Holmes, Rutherford & Chekene Senior Consultant
      Holmes, William T
      Speaker Profile
    • Buildings - Representative Sample
    • Profile
      Cambridge 233
    2012-11-22-14- 04-5822 November 2012CTV Building hearing - Presentation of additional thoughts on the CTV Building Collapse Investigation Report - presentation comprising additional thoughts from peer reviewer William HolmesCTV Building hearing - Presentation of additional thoughts on the CTV Building Collapse Investigation Report - presentation comprising additional thoughts from peer reviewer William Holmes
      Holmes, William T
      Exhibit
      Buildings - Representative Sample
      Madras 249
    2012-03-12-12- 39-5512 March 2012Review of Expert Panel Report Chapter 4 - Context: Presentation by William T. HolmesReview of Expert Panel Report Chapter 4 - Context: Presentation by William T. Holmes
      Holmes, William T
      Exhibit
    • Buildings - Representative Sample
    • Engineering
      Cambridge 233
    2012-10-26-14- 47-0126 October 2012Seismic Performance Investigation Draft Report of Clarendon Tower - 78 Worcester Street: Report by Bill Holmes and Reid Zimmerman of Rutherford & Chekene, February 2012Seismic Performance Investigation Draft Report of Clarendon Tower - 78 Worcester Street: Report by Bill Holmes and Reid Zimmerman of Rutherford & Chekene, February 2012
      Holmes, William T
      Technical Report
      Buildings - Representative Sample
      Worcester 78

    Search results navigation

    Displaying 881 - 900 of 1948 items arrow left First arrow left Prev arrow right Next arrow right Last