Canterbury Earthquakes Royal Commission Te Komihana Rūwhenua o Waitaha Canterbury Earthquakes Royal Commission – Te Komihana Rūwhenua o Waitaha

Those who lost relatives and friends in the 22 February earthquake can be assured that there will be a very thorough inquiry into the failure of buildings that resulted in loss of life.
Chair, Justice Mark Cooper

Document library

Document categories

Additional filter options

Choose 1 or more filters then press 'Apply filter'
Reset

Search results

Published No sorted Title Not sorted Author(s) Sorted ascending Category Not sorted Subject(s) Not sorted Building(s) Not sorted Action
2012-06-26-17- 56-2226 June 2012CTV Building hearing: Supplementary Statement of Evidence of David John BainbridgeCTV Building hearing: Supplementary Statement of Evidence of David John Bainbridge
    Bainbridge, David
    Exhibit
    Buildings - Representative Sample
    Madras 249
2012-02-16-15- 10-3516 February 2012Submission from Paul Baker regarding the education of engineers, January 2012Submission from Paul Baker regarding the education of engineers, January 2012
    Baker, Paul N
    Submission
    Training and Education
    2012-01-30-12- 06-3930 January 2012Cathedral Square 32 hearing: Emails and messages to staff from Joanne Ballantyne and Andrew BoyleCathedral Square 32 hearing: Emails and messages to staff from Joanne Ballantyne and Andrew Boyle
      Ballantyne, Joanne
      Exhibit
      Buildings - Representative Sample
      Cathedral 32
    2012-07-31-15- 27-2331 July 2012CTV Building hearing: Collection of documents in relation to the 1990 Holmes Consulting Group Structural Report on the Office Building at 249 Madras Street CTV Building hearing: Collection of documents in relation to the 1990 Holmes Consulting Group Structural Report on the Office Building at 249 Madras Street
      Banks, Geoff
      Exhibit
      Buildings - Representative Sample
      Madras 249
    2012-08-17-14- 39-2617 August 2012CTV Building hearing: Brief of Evidence of Geoffrey Nigel BanksCTV Building hearing: Brief of Evidence of Geoffrey Nigel Banks
      Banks, Geoff
      Exhibit
      Buildings - Representative Sample
      Madras 249
    2012-11-28-12- 10-0728 November 2012Update to GNS Science/University of Canterbury July 2011 Report entitled The Canterbury Earthquake Sequence and Implications for Seismic Design Levels, dated 2 April 2012Update to GNS Science/University of Canterbury July 2011 Report entitled The Canterbury Earthquake Sequence and Implications for Seismic Design Levels, dated 2 April 2012
      Bannister, Stephen
      Referenced Document
      Seismicity
      2012-11-27-16- 03-1427 November 2012 Building Safety Evaluation After the February 22, 2011 Christchurch, New Zealand Earthquake: Observations by the ATC Reconnaissance Team Building Safety Evaluation After the February 22, 2011 Christchurch, New Zealand Earthquake: Observations by the ATC Reconnaissance Team
        Barnes, Jim
        Referenced Document
        Building assessments after earthquakes
        2012-01-26-13- 21-2026 January 2012Manchester 200-204 hearing: Letter from Royal Commission to Lewis & Barrow and Lewis & Barrow's responseManchester 200-204 hearing: Letter from Royal Commission to Lewis & Barrow and Lewis & Barrow's response
          Barrow, Stephen
          Exhibit
          Buildings - Representative Sample
          Manchester 200
        2012-03-13-17- 03-5713 March 2012Presentation by Mark Batchelar, mlb Consulting Engineers, and John Reelick, TTT products, for the hearing on New Building TechnologiesPresentation by Mark Batchelar, mlb Consulting Engineers, and John Reelick, TTT products, for the hearing on New Building Technologies
          Batchelar, Mark L
          Exhibit
          New Building Technologies
          2012-03-13-17- 07-5813 March 2012Biography of Mark Batchelar, mlb Consulting EngineersBiography of Mark Batchelar, mlb Consulting Engineers
            Batchelar, Mark L
            Exhibit
          • New Building Technologies
          • Profile
            2011-11-10-09- 53-5610 November 2011Letter from Hurunui District Council about unreinforced masonry (URM) and earthquake-prone building policies, October 2011Letter from Hurunui District Council about unreinforced masonry (URM) and earthquake-prone building policies, October 2011
              Batchelor, Judith
              RFI Response
            • Standards and Regulation
            • Unreinforced Masonry Buildings (URM)
              2011-11-28-15- 15-4428 November 2011Cambridge 233 PGC Building: Level one structural plan and inferred collapse sequenceCambridge 233 PGC Building: Level one structural plan and inferred collapse sequence
                Beca Carter Hollings and Ferner Ltd (BECA)
                Exhibit
                Buildings - Representative Sample
                Cambridge 233
              2012-02-23-11- 40-2023 February 2012Forsyth Barr hearing: Investigation into the collapse of the Forsyth Barr building stairs on 22nd February 2011Forsyth Barr hearing: Investigation into the collapse of the Forsyth Barr building stairs on 22nd February 2011
                Beca Carter Hollings & Ferner Ltd (Beca)
                Opening Statement
              • Buildings - Representative Sample
              • Stairs and Floors
                Colombo 764
              2012-03-26-09- 11-3026 March 2012Response to SESOC Practice Note on the Design of Conventional Structural Systems Following the Canterbury Earthquakes: Submission by Beca, March 2012Response to SESOC Practice Note on the Design of Conventional Structural Systems Following the Canterbury Earthquakes: Submission by Beca, March 2012
                Beca Carter Hollings & Ferner Ltd (Beca)
                Submission
                Standards and Regulation
                2012-08-15-12- 01-5215 August 2012Training and Education of Engineers and Organisation of the Engineering Profession: Submission from BECA on the Royal Commission Discussion Paper, July 2012Training and Education of Engineers and Organisation of the Engineering Profession: Submission from BECA on the Royal Commission Discussion Paper, July 2012
                  Beca Carter Hollings & Ferner Ltd (Beca)
                  Submission
                • Engineering
                • Training and Education
                  2012-02-24-12- 30-3424 February 2012Forsyth Barr hearing: Beca investigation into the collapse of the Forsyth Barr building stairs on 22nd February 2011 - AppendicesForsyth Barr hearing: Beca investigation into the collapse of the Forsyth Barr building stairs on 22nd February 2011 - Appendices
                    Beca Carter Hollings & Ferner Ltd (Beca)
                    Opening Statement
                    Buildings - Representative Sample
                    Colombo 764
                  2012-02-24-12- 52-4824 February 2012Forsyth Barr hearing: Interview with Richard Sharpe and Paul Tonkin, May 2011Forsyth Barr hearing: Interview with Richard Sharpe and Paul Tonkin, May 2011
                    Beca Carter Hollings & Ferner Ltd (Beca)
                    Exhibit
                    Buildings - Representative Sample
                    Colombo 764
                  2011-12-05-13- 31-4405 December 2011PGC Building hearing: Investigation into collapse of Pyne Gould Corporation building: presentation by Rob Jury and Richard Sharpe of BecaPGC Building hearing: Investigation into collapse of Pyne Gould Corporation building: presentation by Rob Jury and Richard Sharpe of Beca
                    Beca Carter Hollings & Ferner Ltd (Beca)
                    Exhibit
                    Buildings - Representative Sample
                    Cambridge 233
                  2012-02-23-15- 08-3223 February 2012Forsyth Barr hearing: Investigation into collapse of stairs in the Forsyth Barr building: Presentation by Rob Jury and Richard Sharpe of BecaForsyth Barr hearing: Investigation into collapse of stairs in the Forsyth Barr building: Presentation by Rob Jury and Richard Sharpe of Beca
                    Beca Carter Hollings & Ferner Ltd (Beca)
                    Exhibit
                    Buildings - Representative Sample
                    Colombo 764
                  2012-09-07-16- 46-3307 September 2012Roles and Responsibilities: Submission from Beca Carter Hollings & Ferner Ltd (Beca) on the Royal Commission Discussion Paper, July 2012Roles and Responsibilities: Submission from Beca Carter Hollings & Ferner Ltd (Beca) on the Royal Commission Discussion Paper, July 2012
                    Beca Carter Hollings & Ferner Ltd (Beca)
                    Submission
                  • Roles and Responsibilities
                  • Standards and Regulation

                    Search results navigation

                    Displaying 48 - 67 of 1948 items arrow left First arrow left Prev arrow right Next arrow right Last