Canterbury Earthquakes Royal Commission Te Komihana Rūwhenua o Waitaha Canterbury Earthquakes Royal Commission – Te Komihana Rūwhenua o Waitaha

Those who lost relatives and friends in the 22 February earthquake can be assured that there will be a very thorough inquiry into the failure of buildings that resulted in loss of life.
Chair, Justice Mark Cooper

Document library

Document categories

Additional filter options

Choose 1 or more filters then press 'Apply filter'
Reset

Search results

Published No sorted Title Not sorted Author(s) Sorted descending Category Not sorted Subject(s) Not sorted Building(s) Not sorted Action
2011-11-30-12- 29-0530 November 2011Cambridge 233 PGC Building: Rapid Structural Assessment and Re-inspection after 4 September 2010Cambridge 233 PGC Building: Rapid Structural Assessment and Re-inspection after 4 September 2010
    Holmes Consulting Group
    Exhibit
    Buildings - Representative Sample
    Cambridge 233
2011-11-28-16- 06-5628 November 2011Cambridge 233 PGC Building: Letter and documents from Holmes Consulting Group regarding information on the PGC BuildingCambridge 233 PGC Building: Letter and documents from Holmes Consulting Group regarding information on the PGC Building
    Holmes Consulting Group
    Exhibit
    Buildings - Representative Sample
    Cambridge 233
2012-02-24-12- 41-1524 February 2012Forsyth Barr hearing: Detailed seismic assessment - fee proposalForsyth Barr hearing: Detailed seismic assessment - fee proposal
    Holmes Consulting Group
    Opening Statement
    Buildings - Representative Sample
    Colombo 764
2012-03-12-13- 26-1612 March 2012Cambridge 233 PGC Building: Standard producer statement - design is not appropriate for building consentCambridge 233 PGC Building: Standard producer statement - design is not appropriate for building consent
    Holmes Consulting Group
    Exhibit
    Buildings - Representative Sample
    Cambridge 233
2012-02-24-12- 51-5924 February 2012Forsyth Barr hearing: Supplementary Brief of Evidence of Henry John HareForsyth Barr hearing: Supplementary Brief of Evidence of Henry John Hare
    Holmes Consulting Group
    Exhibit
    Buildings - Representative Sample
    Colombo 764
2012-02-24-12- 59-1624 February 2012Forsyth Barr hearing: Letter from DLA Phillips Fox regarding further documentation on the construction of the Forsyth Barr buildingForsyth Barr hearing: Letter from DLA Phillips Fox regarding further documentation on the construction of the Forsyth Barr building
    Holmes Consulting Group
    Exhibit
    Buildings - Representative Sample
    Colombo 764
2012-04-02-11- 04-0902 April 2012PGC Building hearing: Post-hearing submission from Holmes Consulting Group in relation to the PGC Building PGC Building hearing: Post-hearing submission from Holmes Consulting Group in relation to the PGC Building
    Holmes Consulting Group
  • Post hearing submission
  • Submission
    Buildings - Representative Sample
    Cambridge 233
2012-10-26-16- 15-1826 October 2012Detailed Engineering Evaluation of Christchurch Women's Hospital provided to the Royal Commission by Holmes Consulting Group in May 2012Detailed Engineering Evaluation of Christchurch Women's Hospital provided to the Royal Commission by Holmes Consulting Group in May 2012
    Holmes Consulting Group
    Technical Report
    Buildings - Representative Sample
    Riccarton Ave 2
2012-03-13-12- 44-0813 March 2012Presentation by John Hare, Holmes Consulting Group, for the hearing on New Building TechnologiesPresentation by John Hare, Holmes Consulting Group, for the hearing on New Building Technologies
    Holmes Consulting Group
    Exhibit
    New Building Technologies
    2012-07-02-15- 37-4102 July 2012CTV Building hearing: Statement of Evidence of Marie Therese Holland CTV Building hearing: Statement of Evidence of Marie Therese Holland
      Holland, Marie
      Exhibit
      Buildings - Representative Sample
      Madras 249
    2012-03-14-14- 51-4614 March 2012Presentation for the Royal Commission by the Shimizu Institute of Technology for the hearing on New Building TechnologiesPresentation for the Royal Commission by the Shimizu Institute of Technology for the hearing on New Building Technologies
      Holland, John
      Exhibit
      New Building Technologies
      2012-01-30-15- 47-2330 January 2012Rating System for Buildings Earthquake Resilience: Submission by Don Holden of INLAW Group, November 2011Rating System for Buildings Earthquake Resilience: Submission by Don Holden of INLAW Group, November 2011
        Holden, Don
        Submission
      • New Building Technologies
      • Unreinforced Masonry Buildings (URM)
        2011-12-13-14- 08-3013 December 2011Coleridge 90 hearing: Statement of Marc HobsonColeridge 90 hearing: Statement of Marc Hobson
          Hobson, Marc
          Exhibit
          Buildings - Representative Sample
          Coleridge 90
        2012-11-27-16- 22-0827 November 2012Paper on An Efficient System for Acquiring Earthquake Damage Information in Damage Area, by A. Shibayama and Y. HisadaPaper on An Efficient System for Acquiring Earthquake Damage Information in Damage Area, by A. Shibayama and Y. Hisada
          Hisada, Yoshiaki
          Referenced Document
        • Building assessments after earthquakes
        • Placarding (Stickering)
        • Safety Evaluation
          2012-09-12-15- 22-4112 September 2012Roles and responsibilities hearing: Presentation by Nicholas Hill of the Building Officials Institute of New ZealandRoles and responsibilities hearing: Presentation by Nicholas Hill of the Building Officials Institute of New Zealand
            Hill, Nicholas W
            Exhibit
            Roles and Responsibilities
            2012-09-12-15- 27-0512 September 2012Roles and responsibilities hearing: Graphic regarding BCO Training Pathway provided by Nicholas Hill of the Building Officials Institute of New ZealandRoles and responsibilities hearing: Graphic regarding BCO Training Pathway provided by Nicholas Hill of the Building Officials Institute of New Zealand
              Hill, Nicholas W
              Exhibit
              Roles and Responsibilities
              2012-11-27-16- 47-2127 November 2012Report on the Canterbury Fact Finding Project by Hill Young Cooper Limited and the Resource Management Group LimitedReport on the Canterbury Fact Finding Project by Hill Young Cooper Limited and the Resource Management Group Limited
                Hill Young Cooper
                Referenced Document
                Geotechnical
                2012-03-09-11- 15-5209 March 2012Colombo 382 hearing: Email from Neville Higgs regarding the inspection of 382 ColomboColombo 382 hearing: Email from Neville Higgs regarding the inspection of 382 Colombo
                  Higgs, Neville
                  Exhibit
                  Buildings - Representative Sample
                • Colombo 380
                • Colombo 382
                2012-01-26-17- 19-0226 January 2012Manchester 200-204 hearing: Statement of Neville HiggsManchester 200-204 hearing: Statement of Neville Higgs
                  Higgs, Neville
                  Exhibit
                  Buildings - Representative Sample
                • Manchester 200
                • Manchester 204
                2012-01-26-17- 19-1126 January 2012Manchester 200-204 hearing: Email from Neville Higgs to Royal Commission regarding note on engineer's re-inspection formManchester 200-204 hearing: Email from Neville Higgs to Royal Commission regarding note on engineer's re-inspection form
                  Higgs, Neville
                  Exhibit
                  Buildings - Representative Sample
                  Manchester 200

                Search results navigation

                Displaying 1070 - 1089 of 1948 items arrow left First arrow left Prev arrow right Next arrow right Last