Canterbury Earthquakes Royal Commission Te Komihana Rūwhenua o Waitaha Canterbury Earthquakes Royal Commission – Te Komihana Rūwhenua o Waitaha

Those who lost relatives and friends in the 22 February earthquake can be assured that there will be a very thorough inquiry into the failure of buildings that resulted in loss of life.
Chair, Justice Mark Cooper

Document library

Document categories

Additional filter options

Choose 1 or more filters then press 'Apply filter'
Reset

Search results

Published No sorted Title Not sorted Author(s) Sorted descending Category Not sorted Subject(s) Not sorted Building(s) Not sorted Action
2011-10-21-13- 54-5921 October 2011Stairs and Access Ramps Between Floors in Multi-Storey Buildings: Technical Report by Des Bull, August 2011Stairs and Access Ramps Between Floors in Multi-Storey Buildings: Technical Report by Des Bull, August 2011
    Holmes Consulting Group
    Technical Report
  • Engineering
  • Stairs and Floors
    2011-11-29-12- 18-0729 November 2011Cambridge 233 PGC Building: Memorandum from John Hare, Holmes Consulting Group, to Ian Bisman, Warren & Mahoney Ltd regarding study findingsCambridge 233 PGC Building: Memorandum from John Hare, Holmes Consulting Group, to Ian Bisman, Warren & Mahoney Ltd regarding study findings
      Holmes Consulting Group
      Exhibit
      Buildings - Representative Sample
      Cambridge 233
    2011-10-21-14- 23-0421 October 2011Heritage earthquake prone building strengthening cost study: Technical report by John Hare of Holmes Consulting Group, June 2009Heritage earthquake prone building strengthening cost study: Technical report by John Hare of Holmes Consulting Group, June 2009
      Holmes Consulting Group
      Technical Report
    • Culture and Heritage
    • Engineering
      2012-03-30-17- 39-4030 March 2012Colombo 593 hearing: Post hearing submission from Holmes Consulting Group to the Royal CommissionColombo 593 hearing: Post hearing submission from Holmes Consulting Group to the Royal Commission
        Holmes Consulting Group
      • Post hearing submission
      • Submission
        Buildings - Representative Sample
        Colombo 593
      2012-04-02-11- 02-0402 April 2012PGC Building hearing: Post-hearing submission of Holmes Consulting Group in relation to the PGC BuildingPGC Building hearing: Post-hearing submission of Holmes Consulting Group in relation to the PGC Building
        Holmes Consulting Group
      • Post hearing submission
      • Submission
        Buildings - Representative Sample
        Cambridge 233
      2012-08-15-13- 07-0815 August 2012Building Management After Earthquakes: Submission by Bruce Galloway and John Hare of Holmes Consulting Group on the Royal Commission Discussion Paper, July 2012Building Management After Earthquakes: Submission by Bruce Galloway and John Hare of Holmes Consulting Group on the Royal Commission Discussion Paper, July 2012
        Holmes Consulting Group
        Submission
      • Building assessments after earthquakes
      • Central Business District (CBD)
      • Engineering
      • Placarding (Stickering)
      • Safety Evaluation
      • Standards and Regulation
        2012-06-25-16- 27-0325 June 2012CTV Building hearing: Holmes Consulting Group Structural Report, January 1990CTV Building hearing: Holmes Consulting Group Structural Report, January 1990
          Holmes Consulting Group
          Exhibit
          Buildings - Representative Sample
          Madras 249
        2012-09-07-15- 25-3607 September 2012CTV Building hearing: Closing submissions of Counsel for Holmes Consulting Group and John HareCTV Building hearing: Closing submissions of Counsel for Holmes Consulting Group and John Hare
          Holmes Consulting Group
          Closing Statement
          Buildings - Representative Sample
          Madras 249
        2012-07-31-15- 27-2331 July 2012CTV Building hearing: Collection of documents in relation to the 1990 Holmes Consulting Group Structural Report on the Office Building at 249 Madras Street CTV Building hearing: Collection of documents in relation to the 1990 Holmes Consulting Group Structural Report on the Office Building at 249 Madras Street
          Holmes Consulting Group
          Exhibit
          Buildings - Representative Sample
          Madras 249
        2012-08-14-16- 24-2014 August 2012CTV Building hearing: Collection of documents in relation to the 1990 Holmes Consulting Group Structural ReportCTV Building hearing: Collection of documents in relation to the 1990 Holmes Consulting Group Structural Report
          Holmes Consulting Group
          Exhibit
          Buildings - Representative Sample
          Madras 249
        2012-02-23-12- 23-1123 February 2012Forsyth Barr hearing: Review by Holmes Consulting Group of technical investigation reports prepared for Department of Building and HousingForsyth Barr hearing: Review by Holmes Consulting Group of technical investigation reports prepared for Department of Building and Housing
          Holmes Consulting Group
          Opening Statement
        • Buildings - Representative Sample
        • Engineering
        • Cambridge 233
        • Cashel 161
        • Colombo 764
        2011-11-28-15- 50-3828 November 2011Cambridge 233 PGC Building: Conversion plans and costs for PGC Group from Holmes Consulting Group to Warren and Mahoney, 17 February 1997Cambridge 233 PGC Building: Conversion plans and costs for PGC Group from Holmes Consulting Group to Warren and Mahoney, 17 February 1997
          Holmes Consulting Group
          Exhibit
          Buildings - Representative Sample
          Cambridge 233
        2011-11-30-12- 29-0530 November 2011Cambridge 233 PGC Building: Rapid Structural Assessment and Re-inspection after 4 September 2010Cambridge 233 PGC Building: Rapid Structural Assessment and Re-inspection after 4 September 2010
          Holmes Consulting Group
          Exhibit
          Buildings - Representative Sample
          Cambridge 233
        2011-11-28-16- 06-5628 November 2011Cambridge 233 PGC Building: Letter and documents from Holmes Consulting Group regarding information on the PGC BuildingCambridge 233 PGC Building: Letter and documents from Holmes Consulting Group regarding information on the PGC Building
          Holmes Consulting Group
          Exhibit
          Buildings - Representative Sample
          Cambridge 233
        2012-02-24-12- 41-1524 February 2012Forsyth Barr hearing: Detailed seismic assessment - fee proposalForsyth Barr hearing: Detailed seismic assessment - fee proposal
          Holmes Consulting Group
          Opening Statement
          Buildings - Representative Sample
          Colombo 764
        2012-03-12-13- 26-1612 March 2012Cambridge 233 PGC Building: Standard producer statement - design is not appropriate for building consentCambridge 233 PGC Building: Standard producer statement - design is not appropriate for building consent
          Holmes Consulting Group
          Exhibit
          Buildings - Representative Sample
          Cambridge 233
        2012-02-24-12- 51-5924 February 2012Forsyth Barr hearing: Supplementary Brief of Evidence of Henry John HareForsyth Barr hearing: Supplementary Brief of Evidence of Henry John Hare
          Holmes Consulting Group
          Exhibit
          Buildings - Representative Sample
          Colombo 764
        2012-02-24-12- 59-1624 February 2012Forsyth Barr hearing: Letter from DLA Phillips Fox regarding further documentation on the construction of the Forsyth Barr buildingForsyth Barr hearing: Letter from DLA Phillips Fox regarding further documentation on the construction of the Forsyth Barr building
          Holmes Consulting Group
          Exhibit
          Buildings - Representative Sample
          Colombo 764
        2012-04-02-11- 04-0902 April 2012PGC Building hearing: Post-hearing submission from Holmes Consulting Group in relation to the PGC Building PGC Building hearing: Post-hearing submission from Holmes Consulting Group in relation to the PGC Building
          Holmes Consulting Group
        • Post hearing submission
        • Submission
          Buildings - Representative Sample
          Cambridge 233
        2012-10-26-16- 15-1826 October 2012Detailed Engineering Evaluation of Christchurch Women's Hospital provided to the Royal Commission by Holmes Consulting Group in May 2012Detailed Engineering Evaluation of Christchurch Women's Hospital provided to the Royal Commission by Holmes Consulting Group in May 2012
          Holmes Consulting Group
          Technical Report
          Buildings - Representative Sample
          Riccarton Ave 2

        Search results navigation

        Displaying 1058 - 1077 of 1948 items arrow left First arrow left Prev arrow right Next arrow right Last