Canterbury Earthquakes Royal Commission Te Komihana Rūwhenua o Waitaha Canterbury Earthquakes Royal Commission – Te Komihana Rūwhenua o Waitaha

Those who lost relatives and friends in the 22 February earthquake can be assured that there will be a very thorough inquiry into the failure of buildings that resulted in loss of life.
Chair, Justice Mark Cooper

Document library

Document categories

Additional filter options

Choose 1 or more filters then press 'Apply filter'
Reset

Search results

Published No sorted Title Not sorted Author(s) Not sorted Category Sorted ascending Subject(s) Not sorted Building(s) Not sorted Action
2012-11-27-15- 56-5527 November 2012CTV Building: Email from Willie Palmer of Buddle Findlay, counsel for Alan Reay, to Royal Commission, dated 15 June 2012CTV Building: Email from Willie Palmer of Buddle Findlay, counsel for Alan Reay, to Royal Commission, dated 15 June 2012
  • Buddle Findlay
  • Palmer, Willie
    Referenced Document
    Buildings - Representative Sample
    Madras 249
2012-11-27-16- 00-3227 November 2012Notices of Motion, 21 October 1985, Christchurch City CouncilNotices of Motion, 21 October 1985, Christchurch City Council
    Christchurch City Council
    Referenced Document
    Standards and Regulation
    2012-11-27-15- 43-4027 November 2012Greater Christchurch Recovery Update, Issue 14Greater Christchurch Recovery Update, Issue 14
      Canterbury Earthquake Recovery Authority (CERA)
      Referenced Document
      Christchurch Recovery
      2012-11-27-16- 09-3227 November 2012New Zealand Society for Earthquake Engineering, Assessment and Improvement of the Structural Performance of Buildings in Earthquakes: Including Corregendum No.1New Zealand Society for Earthquake Engineering, Assessment and Improvement of the Structural Performance of Buildings in Earthquakes: Including Corregendum No.1
        New Zealand Society for Earthquake Engineering
        Referenced Document
      • Engineering
      • Standards and Regulation
      • Structural Performance
        2012-09-06-16- 17-4406 September 2012CTV Building hearing: Schedule – Summary of ARCE time records for Job 2503. CTV Building hearing: Schedule – Summary of ARCE time records for Job 2503.
        • Buddle Findlay
        • Reay, Alan
          Referenced Document
          Buildings - Representative Sample
          Madras 249
        2012-09-06-16- 25-4406 September 2012CTV Building hearing: Structural detail drawings by Michael BrooksCTV Building hearing: Structural detail drawings by Michael Brooks
          Brooks, Michael
          Referenced Document
          Engineering
          Madras 249
        2012-11-27-16- 15-1427 November 2012Post-Earthquake Building Safety Evaluation Procedures - Preparedness Checklist and Response plan for Territorial Authorities, by New Zealand Society for Earthquake Engineering, January 1998Post-Earthquake Building Safety Evaluation Procedures - Preparedness Checklist and Response plan for Territorial Authorities, by New Zealand Society for Earthquake Engineering, January 1998
          New Zealand Society for Earthquake Engineering
          Referenced Document
        • Building assessments after earthquakes
        • Engineering
        • Placarding (Stickering)
        • Safety Evaluation
        • Standards and Regulation
          2012-11-27-15- 47-0727 November 2012 CTV Building: Investigation into the Influence of Strain-Ageing on the Seismic Performance of the Reinforcing Steel from the CTV Building CTV Building: Investigation into the Influence of Strain-Ageing on the Seismic Performance of the Reinforcing Steel from the CTV Building
          • Allington, Chris
          • Holmes Solutions
            Referenced Document
            Buildings - Representative Sample
            Madras 249
          2012-09-06-16- 33-3306 September 2012CTV Building hearing: Letter reply from IPENZ to the Royal Commission's requests of 20 October 2011 and 2 April 2012 for information in relation to the engineering credentials of Graeme Tapper, Bryan Bluck and Gerald ShirtcliffCTV Building hearing: Letter reply from IPENZ to the Royal Commission's requests of 20 October 2011 and 2 April 2012 for information in relation to the engineering credentials of Graeme Tapper, Bryan Bluck and Gerald Shirtcliff
            Institution of Professional Engineers New Zealand (IPENZ)
            Referenced Document
            Buildings - Representative Sample
            Madras 249
          2012-09-06-16- 38-2006 September 2012CTV Building hearing: Press clipping reporting on the sale of the building after being vacant after completion in 1991CTV Building hearing: Press clipping reporting on the sale of the building after being vacant after completion in 1991
            The Press
            Referenced Document
            Buildings - Representative Sample
            Madras 249
          2012-11-28-12- 10-0728 November 2012Update to GNS Science/University of Canterbury July 2011 Report entitled The Canterbury Earthquake Sequence and Implications for Seismic Design Levels, dated 2 April 2012Update to GNS Science/University of Canterbury July 2011 Report entitled The Canterbury Earthquake Sequence and Implications for Seismic Design Levels, dated 2 April 2012
          • Bannister, Stephen
          • Kaiser, Anna
          • Webb, T H (Terry)
            Referenced Document
            Seismicity
            2012-11-27-15- 39-3627 November 2012Dr John Wilson's Contextual Historical Overview of Christchurch City, 2005.Dr John Wilson's Contextual Historical Overview of Christchurch City, 2005.
              Wilson, John
              Referenced Document
            • Architecture
            • Central Business District (CBD)
            • Christchurch Recovery
            • Culture and Heritage
              2012-11-27-16- 07-3127 November 2012 Development of seismic vulnerability assessment methodologies over the past 30 years Development of seismic vulnerability assessment methodologies over the past 30 years
              • Bommer, J J
              • Calvi, Gian Michele
              • Crowley, H
              • Magenes, G
              • Pinho, R
              • Restrepo-Vélez, L F
                Referenced Document
              • Building assessments after earthquakes
              • Engineering
              • Placarding (Stickering)
              • Safety Evaluation
                2012-11-27-16- 22-4427 November 2012Rapid Evaluation of Building Safety: Learnings from the December 2007 Gisborne Earthquake, presentation by David BrunsdonRapid Evaluation of Building Safety: Learnings from the December 2007 Gisborne Earthquake, presentation by David Brunsdon
                  Brunsdon, Dave
                  Referenced Document
                • Building assessments after earthquakes
                • Placarding (Stickering)
                • Safety Evaluation
                  2012-11-27-16- 48-5627 November 2012Planning for Development of Land on or Close to Active Faults, report by GNS SciencePlanning for Development of Land on or Close to Active Faults, report by GNS Science
                  • Brunsdon, Dave
                  • GNS Science
                  • Kerr, Janine
                  • King, A B
                  • Nathan, Simon
                  • Van Dissen, Russ
                  • Webb, Peter
                    Referenced Document
                  • Seismicity
                  • Standards and Regulation
                    2012-11-27-16- 05-1627 November 2012Building Safety Evaluation During a State of Emergency: Guidelines for Territorial AuthoritiesBuilding Safety Evaluation During a State of Emergency: Guidelines for Territorial Authorities
                      New Zealand Society for Earthquake Engineering
                      Referenced Document
                      Safety Evaluation
                      2012-09-06-16- 41-3406 September 2012CTV Building hearing: RAPID Assessment Form - Level 1 dated 5 September 2010CTV Building hearing: RAPID Assessment Form - Level 1 dated 5 September 2010
                        Christchurch City Council
                        Referenced Document
                        Buildings - Representative Sample
                        Madras 249
                      2012-11-27-17- 00-5927 November 2012Report of the Minister for the Environment's Resource Management Act 1991 Principles, February 2012Report of the Minister for the Environment's Resource Management Act 1991 Principles, February 2012
                        Ministry for the Environment
                        Referenced Document
                        Emergency Powers and Procedures
                        2012-09-06-14- 26-3806 September 2012CTV Building hearing: Statement of Evidence of William HolmesCTV Building hearing: Statement of Evidence of William Holmes
                          Holmes, William T
                          Referenced Document
                        • Buildings - Representative Sample
                        • Engineering
                          Madras 249
                        2012-11-27-16- 17-1827 November 2012Basic Techniques for Quick and Rapid Post-Earthquake Assessments of Building Safety, paper by F. Vidal, M. Feriche and A. OntiverosBasic Techniques for Quick and Rapid Post-Earthquake Assessments of Building Safety, paper by F. Vidal, M. Feriche and A. Ontiveros
                        • Feriche, M
                        • Ontiveros, A
                        • Vidal, F
                          Referenced Document
                        • Building assessments after earthquakes
                        • Engineering
                        • Placarding (Stickering)
                        • Standards and Regulation

                          Search results navigation

                          Displaying 908 - 927 of 1327 Items arrow left First arrow left Prev arrow right Next arrow right Last