Canterbury Earthquakes Royal Commission Te Komihana Rūwhenua o Waitaha Canterbury Earthquakes Royal Commission – Te Komihana Rūwhenua o Waitaha

Those who lost relatives and friends in the 22 February earthquake can be assured that there will be a very thorough inquiry into the failure of buildings that resulted in loss of life.
Chair, Justice Mark Cooper

Document library

Document categories

Additional filter options

Choose 1 or more filters then press 'Apply filter'
Reset

Search results

Published No sorted Title Not sorted Author(s) Not sorted Category Sorted descending Subject(s) Not sorted Building(s) Not sorted Action
2012-11-27-16- 09-3227 November 2012New Zealand Society for Earthquake Engineering, Assessment and Improvement of the Structural Performance of Buildings in Earthquakes: Including Corregendum No.1New Zealand Society for Earthquake Engineering, Assessment and Improvement of the Structural Performance of Buildings in Earthquakes: Including Corregendum No.1
    New Zealand Society for Earthquake Engineering
    Referenced Document
  • Engineering
  • Standards and Regulation
  • Structural Performance
    2012-11-27-16- 15-1427 November 2012Post-Earthquake Building Safety Evaluation Procedures - Preparedness Checklist and Response plan for Territorial Authorities, by New Zealand Society for Earthquake Engineering, January 1998Post-Earthquake Building Safety Evaluation Procedures - Preparedness Checklist and Response plan for Territorial Authorities, by New Zealand Society for Earthquake Engineering, January 1998
      New Zealand Society for Earthquake Engineering
      Referenced Document
    • Building assessments after earthquakes
    • Engineering
    • Placarding (Stickering)
    • Safety Evaluation
    • Standards and Regulation
      2012-11-27-16- 13-3927 November 2012Articel by T. Saito and S.K. Thakur on Post-earthquake Risk Inspection System for BuildingsArticel by T. Saito and S.K. Thakur on Post-earthquake Risk Inspection System for Buildings
      • Saito, Taiki
      • Thakur, Sunil Kumar
        Referenced Document
      • Building assessments after earthquakes
      • Engineering
      • Placarding (Stickering)
      • Safety Evaluation
        2012-11-27-16- 15-5327 November 2012Safety Assessment Program Coordinator Student Manual by the California Emergency Management Agency, version 5, January 2012Safety Assessment Program Coordinator Student Manual by the California Emergency Management Agency, version 5, January 2012
          California Emergency Management Agency
          Referenced Document
        • Building assessments after earthquakes
        • Placarding (Stickering)
        • Safety Evaluation
          2012-11-27-16- 17-1827 November 2012Basic Techniques for Quick and Rapid Post-Earthquake Assessments of Building Safety, paper by F. Vidal, M. Feriche and A. OntiverosBasic Techniques for Quick and Rapid Post-Earthquake Assessments of Building Safety, paper by F. Vidal, M. Feriche and A. Ontiveros
          • Feriche, M
          • Ontiveros, A
          • Vidal, F
            Referenced Document
          • Building assessments after earthquakes
          • Engineering
          • Placarding (Stickering)
          • Standards and Regulation
            2012-11-27-16- 18-3327 November 2012Science Advice for Critical Decision Making, book chapter by E.E. Doyle and D.M JohnstonScience Advice for Critical Decision Making, book chapter by E.E. Doyle and D.M Johnston
            • Doyle, Emma E H
            • Johnston, David M
              Referenced Document
            • Civil Defence
            • Emergency Powers and Procedures
            • Seismicity
              2012-11-27-16- 22-0827 November 2012Paper on An Efficient System for Acquiring Earthquake Damage Information in Damage Area, by A. Shibayama and Y. HisadaPaper on An Efficient System for Acquiring Earthquake Damage Information in Damage Area, by A. Shibayama and Y. Hisada
              • Hisada, Yoshiaki
              • Shibayama, Akihiro
                Referenced Document
              • Building assessments after earthquakes
              • Placarding (Stickering)
              • Safety Evaluation
                2012-11-27-16- 22-4427 November 2012Rapid Evaluation of Building Safety: Learnings from the December 2007 Gisborne Earthquake, presentation by David BrunsdonRapid Evaluation of Building Safety: Learnings from the December 2007 Gisborne Earthquake, presentation by David Brunsdon
                  Brunsdon, Dave
                  Referenced Document
                • Building assessments after earthquakes
                • Placarding (Stickering)
                • Safety Evaluation
                  2012-11-27-16- 25-3427 November 2012Guidance for Engineers Assessing the Seismic Performance of Non-residential and Multi-unit Residential Buildings in Greater Christchurch, by the former Department of Building and HousingGuidance for Engineers Assessing the Seismic Performance of Non-residential and Multi-unit Residential Buildings in Greater Christchurch, by the former Department of Building and Housing
                    Department of Building and Housing
                    Referenced Document
                  • Building assessments after earthquakes
                  • Engineering
                    2012-11-27-16- 26-1027 November 2012An Examination of Improvements Required to Legislative Provisions for Post Disaster Reconstruction in New Zealand, doctoral thesis by Dr James RotimiAn Examination of Improvements Required to Legislative Provisions for Post Disaster Reconstruction in New Zealand, doctoral thesis by Dr James Rotimi
                      Rotimi, James Olabode Bamidele
                      Referenced Document
                    • Building assessments after earthquakes
                    • Civil Defence
                    • Emergency Powers and Procedures
                    • Placarding (Stickering)
                    • Safety Evaluation
                    • Standards and Regulation
                      2012-11-27-16- 28-1827 November 2012A Cluster Approach for Civil Defence and Emergency ManagementA Cluster Approach for Civil Defence and Emergency Management
                        Ministry of Civil Defence & Emergency Management
                        Referenced Document
                        Emergency Powers and Procedures
                        2012-11-27-16- 47-2127 November 2012Report on the Canterbury Fact Finding Project by Hill Young Cooper Limited and the Resource Management Group LimitedReport on the Canterbury Fact Finding Project by Hill Young Cooper Limited and the Resource Management Group Limited
                        • Hill Young Cooper
                        • Resource Management Group Ltd
                          Referenced Document
                          Geotechnical
                          2012-11-27-16- 48-5627 November 2012Planning for Development of Land on or Close to Active Faults, report by GNS SciencePlanning for Development of Land on or Close to Active Faults, report by GNS Science
                          • Brunsdon, Dave
                          • GNS Science
                          • Kerr, Janine
                          • King, A B
                          • Nathan, Simon
                          • Van Dissen, Russ
                          • Webb, Peter
                            Referenced Document
                          • Seismicity
                          • Standards and Regulation
                            2012-11-27-16- 50-1827 November 2012Letter from GNS Science to Christchurch City Council regarding a student report concerning effects of liquefactionLetter from GNS Science to Christchurch City Council regarding a student report concerning effects of liquefaction
                              GNS Science
                              Referenced Document
                              Geotechnical
                              2012-11-27-16- 53-5427 November 2012ATC-20 Procedures for post-earthquake safety evaluation of buildings by the Applied Technology CouncilATC-20 Procedures for post-earthquake safety evaluation of buildings by the Applied Technology Council
                                Applied Technology Council
                                Referenced Document
                              • Building assessments after earthquakes
                              • Engineering
                              • Safety Evaluation
                                2012-11-27-17- 00-5927 November 2012Report of the Minister for the Environment's Resource Management Act 1991 Principles, February 2012Report of the Minister for the Environment's Resource Management Act 1991 Principles, February 2012
                                  Ministry for the Environment
                                  Referenced Document
                                  Emergency Powers and Procedures
                                  2012-11-27-17- 03-1527 November 2012Estimated Damage and Casualties from Earthquakes Affecting Christchurch, report by GNS Estimated Damage and Casualties from Earthquakes Affecting Christchurch, report by GNS
                                    GNS Science
                                    Referenced Document
                                    Seismicity
                                    2012-11-28-08- 47-5428 November 2012Briefing to the incoming Minister for Canterbury Earthquake Recovery by the Canterbury Earthquake Recovery Authority (CERA), December 2011Briefing to the incoming Minister for Canterbury Earthquake Recovery by the Canterbury Earthquake Recovery Authority (CERA), December 2011
                                      Canterbury Earthquake Recovery Authority (CERA)
                                      Referenced Document
                                      Christchurch Recovery
                                      2012-11-28-12- 10-0728 November 2012Update to GNS Science/University of Canterbury July 2011 Report entitled The Canterbury Earthquake Sequence and Implications for Seismic Design Levels, dated 2 April 2012Update to GNS Science/University of Canterbury July 2011 Report entitled The Canterbury Earthquake Sequence and Implications for Seismic Design Levels, dated 2 April 2012
                                      • Bannister, Stephen
                                      • Kaiser, Anna
                                      • Webb, T H (Terry)
                                        Referenced Document
                                        Seismicity
                                        2012-11-28-13- 13-3128 November 2012CTV Building hearing: Video clip of work in progress on the western wall of the CTV buildingCTV Building hearing: Video clip of work in progress on the western wall of the CTV building
                                          Canterbury Television
                                          Referenced Document
                                          Buildings - Representative Sample
                                          Madras 249

                                        Search results navigation

                                        Displaying 401 - 420 of 1327 Items arrow left First arrow left Prev arrow right Next arrow right Last