Canterbury Earthquakes Royal Commission Te Komihana Rūwhenua o Waitaha Canterbury Earthquakes Royal Commission – Te Komihana Rūwhenua o Waitaha

Those who lost relatives and friends in the 22 February earthquake can be assured that there will be a very thorough inquiry into the failure of buildings that resulted in loss of life.
Chair, Justice Mark Cooper

Document library

Document categories

Additional filter options

Choose 1 or more filters then press 'Apply filter'
Reset

Search results

Published No sorted Title Not sorted Author(s) Not sorted Category Sorted descending Subject(s) Not sorted Building(s) Not sorted Action
2012-06-21-15- 45-2621 June 2012Discussion Paper: Training and Education of Engineers and Organisation of the Engineering ProfessionDiscussion Paper: Training and Education of Engineers and Organisation of the Engineering Profession
    Canterbury Earthquakes Royal Commission
    • Discussion Paper
    • Training and Education
      2012-12-05-23- 21-5005 December 2012Structural Damage Report on the Novotel Hotel, 52 Cathedral Square dated 23 August 2011Structural Damage Report on the Novotel Hotel, 52 Cathedral Square dated 23 August 2011
        Lewis Bradford Consulting Engineers
          Buildings - Representative Sample
          2012-09-07-12- 17-1007 September 2012CTV Building hearing: Index of URL links to the published documents referenced in the closing submissions of Counsel for Christchurch City Council CTV Building hearing: Index of URL links to the published documents referenced in the closing submissions of Counsel for Christchurch City Council
            Canterbury Earthquakes Royal Commission
              Buildings - Representative Sample
              Madras 249
            2012-11-27-14- 35-5127 November 2012A collection of documents compiled by the Royal Commission to assess the earthquake performance of Pacific Tower, 166 Gloucester Street. (Part 1)A collection of documents compiled by the Royal Commission to assess the earthquake performance of Pacific Tower, 166 Gloucester Street. (Part 1)
              Various
              • Buildings - Representative Sample
              • Engineering
                Gloucester 166
              2012-07-20-13- 39-1020 July 2012Evaluation of earthquake damaged concrete and masonry wall buildings - Basic procedures manual prepared by the Applied Technology Council for The Partnership for Response and RecoveryEvaluation of earthquake damaged concrete and masonry wall buildings - Basic procedures manual prepared by the Applied Technology Council for The Partnership for Response and Recovery
                Federal Emergency Management Agency (FEMA)
                • Building assessments after earthquakes
                • Unreinforced Masonry Buildings (URM)
                  2012-03-06-14- 03-1906 March 2012Hearing Srecko (Alec) Cvetanov Submission: Submission of Counsel Assisting in opposition to application to extend jurisdictionHearing Srecko (Alec) Cvetanov Submission: Submission of Counsel Assisting in opposition to application to extend jurisdiction
                  • Canterbury Earthquakes Royal Commission
                  • Mills, Stephen
                      Cvetanov Hearing
                      Madras 249
                    2012-11-23-11- 07-4023 November 2012CTV Building hearing - Direction from Counsel Assisting in relation to interpretation of Second Compusoft NTHACTV Building hearing - Direction from Counsel Assisting in relation to interpretation of Second Compusoft NTHA
                      Canterbury Earthquakes Royal Commission
                        Buildings - Representative Sample
                        Madras 249
                      2012-09-06-16- 59-0606 September 2012CTV Building hearing: Index of URL links to published documents referenced in the Closing Submissions of Counsel for Alan Reay Consultants Limited and Dr ReayCTV Building hearing: Index of URL links to published documents referenced in the Closing Submissions of Counsel for Alan Reay Consultants Limited and Dr Reay
                        Canterbury Earthquakes Royal Commission
                          Buildings - Representative Sample
                          Madras 249
                        2012-09-07-17- 18-4107 September 2012CTV Building hearing: Index of URL links to the published documents referenced in the closing submissions on behalf of bereaved families and those injuredCTV Building hearing: Index of URL links to the published documents referenced in the closing submissions on behalf of bereaved families and those injured
                          Canterbury Earthquakes Royal Commission
                            Buildings - Representative Sample
                            Madras 249
                          2011-12-21-14- 12-0121 December 2011Practice Note - Design of Conventional Structural Systems Following Canterbury Earthquakes: Submission by Structural Engineering Society of New Zealand, December 2011Practice Note - Design of Conventional Structural Systems Following Canterbury Earthquakes: Submission by Structural Engineering Society of New Zealand, December 2011
                            Structural Engineering Society of New Zealand
                          • Submission
                          • Technical Report
                            Engineering
                            2011-11-02-12- 48-2502 November 2011Letter from David Nummy of Unitec to the Royal Commission regarding engineering qualificationsLetter from David Nummy of Unitec to the Royal Commission regarding engineering qualifications
                            • Nummy, David
                            • Unitec
                            • Submission
                            • Technical Report
                              Engineering
                              2011-11-02-12- 48-1102 November 2011Structural and Geotechnical Engineering Education: Submission by Faculty of Engineering, University of Auckland, August 2011Structural and Geotechnical Engineering Education: Submission by Faculty of Engineering, University of Auckland, August 2011
                              • Davies, Michael C R
                              • Pender, Michael
                              • Quenneville, Pierre
                              • Submission
                              • Technical Report
                                Training and Education
                                2012-02-03-08- 41-2503 February 2012Education of Structural and Geotechnical Engineers at the University of Canterbury: Report by Professor Andy Buchanan and Associate Professor Roger Nokes, August 2011Education of Structural and Geotechnical Engineers at the University of Canterbury: Report by Professor Andy Buchanan and Associate Professor Roger Nokes, August 2011
                                  University of Canterbury
                                • Submission
                                • Technical Report
                                  Training and Education
                                  2012-11-27-16- 30-3527 November 2012New Zealand Building Code Handbook Third Edition by the Department of Building and HousingNew Zealand Building Code Handbook Third Edition by the Department of Building and Housing
                                    Department of Building and Housing
                                  • Referenced Document
                                  • Technical Report
                                  • Standards and Regulation
                                  • Unreinforced Masonry Buildings (URM)
                                    2012-11-27-16- 08-4627 November 2012Comparison of international post-earthquake building safety evaluation programsComparison of international post-earthquake building safety evaluation programs
                                      Turner, Fred
                                    • Referenced Document
                                    • Submission
                                    • Building assessments after earthquakes
                                    • Placarding (Stickering)
                                    • Safety Evaluation
                                      2011-12-02-15- 26-4302 December 2011Standards and Regulation for Building Construction in New Zealand by the Institution of Professional Engineers New Zealand, August 2011Standards and Regulation for Building Construction in New Zealand by the Institution of Professional Engineers New Zealand, August 2011
                                        Institution of Professional Engineers New Zealand (IPENZ)
                                      • Referenced Document
                                      • Submission
                                      • Technical Report
                                        Standards and Regulation
                                        2012-03-30-17- 39-4030 March 2012Colombo 593 hearing: Post hearing submission from Holmes Consulting Group to the Royal CommissionColombo 593 hearing: Post hearing submission from Holmes Consulting Group to the Royal Commission
                                          Holmes Consulting Group
                                        • Post hearing submission
                                        • Submission
                                          Buildings - Representative Sample
                                          Colombo 593
                                        2012-03-30-17- 41-1830 March 2012Colombo 593 hearing: Post hearing submission from NAI Harcourts to the Royal CommissionColombo 593 hearing: Post hearing submission from NAI Harcourts to the Royal Commission
                                          NAI Harcourts Real Estate
                                        • Post hearing submission
                                        • Submission
                                          Buildings - Representative Sample
                                          Colombo 593
                                        2012-04-02-11- 02-0402 April 2012PGC Building hearing: Post-hearing submission of Holmes Consulting Group in relation to the PGC BuildingPGC Building hearing: Post-hearing submission of Holmes Consulting Group in relation to the PGC Building
                                          Holmes Consulting Group
                                        • Post hearing submission
                                        • Submission
                                          Buildings - Representative Sample
                                          Cambridge 233
                                        2012-03-30-17- 40-3130 March 2012Colombo 593 hearing: Post hearing submission of Simon Wall to the Royal CommissionColombo 593 hearing: Post hearing submission of Simon Wall to the Royal Commission
                                          Wall, Simon
                                        • Post hearing submission
                                        • Submission
                                          Buildings - Representative Sample
                                          Colombo 593

                                        Search results navigation

                                        Displaying 15 - 34 of 1327 Items arrow left First arrow left Prev arrow right Next arrow right Last