Canterbury Earthquakes Royal Commission Te Komihana Rūwhenua o Waitaha Canterbury Earthquakes Royal Commission – Te Komihana Rūwhenua o Waitaha

Those who lost relatives and friends in the 22 February earthquake can be assured that there will be a very thorough inquiry into the failure of buildings that resulted in loss of life.
Chair, Justice Mark Cooper

Document library

Document categories

Additional filter options

Choose 1 or more filters then press 'Apply filter'
Reset

Search results

Published No sorted Title Not sorted Author(s) Not sorted Category Sorted ascending Subject(s) Not sorted Building(s) Not sorted Action
2012-11-26-16- 55-5026 November 2012CTV Building hearing: An Alternative Collapse Scenario for the CTV Building: Submission to the Royal Commission from John ManderCTV Building hearing: An Alternative Collapse Scenario for the CTV Building: Submission to the Royal Commission from John Mander
    Mander, John
  • Exhibit
  • Submission
    Buildings - Representative Sample
    Madras 249
2011-11-28-16- 20-1128 November 2011Building Safety Evaluation Following the Canterbury Earthquakes: Technical report by the New Zealand Society for Earthquake Engineering, September 2011Building Safety Evaluation Following the Canterbury Earthquakes: Technical report by the New Zealand Society for Earthquake Engineering, September 2011
  • Brunsdon, Dave
  • New Zealand Society for Earthquake Engineering
  • Exhibit
  • Technical Report
  • Building Failure
  • Safety Evaluation
    2012-03-12-12- 39-1612 March 2012Department of Building and Housing Technical Investigation Reports: Peer review by William Holmes, November 2011Department of Building and Housing Technical Investigation Reports: Peer review by William Holmes, November 2011
    • Holmes, William T
    • Rutherford & Chekene
    • Exhibit
    • Technical Report
    • Building Failure
    • Buildings - Representative Sample
    • Central Business District (CBD)
    • Cambridge 233
    • Cashel 161
    • Colombo 764
    2011-10-21-13- 05-1421 October 2011Canterbury Earthquake Sequence and Implications for Seismic Design Levels: Peer Review by Professor Ralph Archuleta, October 2011Canterbury Earthquake Sequence and Implications for Seismic Design Levels: Peer Review by Professor Ralph Archuleta, October 2011
      Archuleta, Ralph J
    • Exhibit
    • Technical Report
      Seismicity
      2012-03-12-12- 21-2812 March 2012Foundations on Deep Alluvial Soils: Peer Review by Jonathan D Bray, October 2011Foundations on Deep Alluvial Soils: Peer Review by Jonathan D Bray, October 2011
        Bray, Jonathan D
      • Exhibit
      • Technical Report
        Geotechnical
        2011-10-21-12- 52-2221 October 2011Probabilities of aftershocks and larger events for the 2010 Darfield earthquake based on average behaviour of New Zealand earthquakes: Technical Report by GNS Science, 2011Probabilities of aftershocks and larger events for the 2010 Darfield earthquake based on average behaviour of New Zealand earthquakes: Technical Report by GNS Science, 2011
          GNS Science
        • Exhibit
        • Technical Report
          Seismicity
          2012-06-25-15- 39-0425 June 2012CTV Building hearing: CTV Building Collapse Investigation Report by Dr Clark Hyland and Ashley Smith, January 2012CTV Building hearing: CTV Building Collapse Investigation Report by Dr Clark Hyland and Ashley Smith, January 2012
          • Hyland Consultants Ltd
          • Hyland, Clark
          • Smith, Ashley
          • Structure Smith Consulting Engineers
          • Exhibit
          • Technical Report
            Buildings - Representative Sample
            Madras 249
          2011-10-21-11- 33-0721 October 2011Z-factor Graph: Technical Report by GNS Science, October 2011Z-factor Graph: Technical Report by GNS Science, October 2011
          • GNS Science
          • Webb, T H (Terry)
          • Exhibit
          • Technical Report
            Seismicity
            2012-03-30-17- 39-4030 March 2012Colombo 593 hearing: Post hearing submission from Holmes Consulting Group to the Royal CommissionColombo 593 hearing: Post hearing submission from Holmes Consulting Group to the Royal Commission
              Holmes Consulting Group
            • Post hearing submission
            • Submission
              Buildings - Representative Sample
              Colombo 593
            2012-03-30-17- 41-1830 March 2012Colombo 593 hearing: Post hearing submission from NAI Harcourts to the Royal CommissionColombo 593 hearing: Post hearing submission from NAI Harcourts to the Royal Commission
              NAI Harcourts Real Estate
            • Post hearing submission
            • Submission
              Buildings - Representative Sample
              Colombo 593
            2012-03-30-17- 40-3130 March 2012Colombo 593 hearing: Post hearing submission of Simon Wall to the Royal CommissionColombo 593 hearing: Post hearing submission of Simon Wall to the Royal Commission
              Wall, Simon
            • Post hearing submission
            • Submission
              Buildings - Representative Sample
              Colombo 593
            2012-04-02-11- 01-1202 April 2012PGC Building hearing: Post-hearing submission in relation to the PGC Building from Christchurch City CouncilPGC Building hearing: Post-hearing submission in relation to the PGC Building from Christchurch City Council
            • Christchurch City Council
            • Daines, Nadine
            • Laing, Duncan
            • Post hearing submission
            • Submission
              Buildings - Representative Sample
              Cambridge 233
            2012-04-02-11- 02-0402 April 2012PGC Building hearing: Post-hearing submission of Holmes Consulting Group in relation to the PGC BuildingPGC Building hearing: Post-hearing submission of Holmes Consulting Group in relation to the PGC Building
              Holmes Consulting Group
            • Post hearing submission
            • Submission
              Buildings - Representative Sample
              Cambridge 233
            2012-04-02-11- 02-4602 April 2012PGC Building hearing: Post-hearing submission on behalf of Grenadier Real Estate Ltd in relation to the PGC buildingPGC Building hearing: Post-hearing submission on behalf of Grenadier Real Estate Ltd in relation to the PGC building
              NAI Harcourts Real Estate
            • Post hearing submission
            • Submission
              Buildings - Representative Sample
              Cambridge 233
            2012-04-02-11- 04-0902 April 2012PGC Building hearing: Post-hearing submission from Holmes Consulting Group in relation to the PGC Building PGC Building hearing: Post-hearing submission from Holmes Consulting Group in relation to the PGC Building
            • Hannan, John
            • Holmes Consulting Group
            • Post hearing submission
            • Submission
              Buildings - Representative Sample
              Cambridge 233
            2011-12-02-15- 26-4302 December 2011Standards and Regulation for Building Construction in New Zealand by the Institution of Professional Engineers New Zealand, August 2011Standards and Regulation for Building Construction in New Zealand by the Institution of Professional Engineers New Zealand, August 2011
              Institution of Professional Engineers New Zealand (IPENZ)
            • Referenced Document
            • Submission
            • Technical Report
              Standards and Regulation
              2012-11-27-16- 08-4627 November 2012Comparison of international post-earthquake building safety evaluation programsComparison of international post-earthquake building safety evaluation programs
                Turner, Fred
              • Referenced Document
              • Submission
              • Building assessments after earthquakes
              • Placarding (Stickering)
              • Safety Evaluation
                2012-11-27-16- 30-3527 November 2012New Zealand Building Code Handbook Third Edition by the Department of Building and HousingNew Zealand Building Code Handbook Third Edition by the Department of Building and Housing
                  Department of Building and Housing
                • Referenced Document
                • Technical Report
                • Standards and Regulation
                • Unreinforced Masonry Buildings (URM)
                  2011-12-21-14- 12-0121 December 2011Practice Note - Design of Conventional Structural Systems Following Canterbury Earthquakes: Submission by Structural Engineering Society of New Zealand, December 2011Practice Note - Design of Conventional Structural Systems Following Canterbury Earthquakes: Submission by Structural Engineering Society of New Zealand, December 2011
                    Structural Engineering Society of New Zealand
                  • Submission
                  • Technical Report
                    Engineering
                    2012-02-03-08- 41-2503 February 2012Education of Structural and Geotechnical Engineers at the University of Canterbury: Report by Professor Andy Buchanan and Associate Professor Roger Nokes, August 2011Education of Structural and Geotechnical Engineers at the University of Canterbury: Report by Professor Andy Buchanan and Associate Professor Roger Nokes, August 2011
                      University of Canterbury
                    • Submission
                    • Technical Report
                      Training and Education

                      Search results navigation

                      Displaying 1283 - 1302 of 1327 Items arrow left First arrow left Prev arrow right Next arrow right Last