Canterbury Earthquakes Royal Commission Te Komihana Rūwhenua o Waitaha Canterbury Earthquakes Royal Commission – Te Komihana Rūwhenua o Waitaha

Those who lost relatives and friends in the 22 February earthquake can be assured that there will be a very thorough inquiry into the failure of buildings that resulted in loss of life.
Chair, Justice Mark Cooper

Document library

Document categories

Additional filter options

Choose 1 or more filters then press 'Apply filter'
Reset

Search results

Published No sorted Title Not sorted Author(s) Not sorted Category Sorted ascending Subject(s) Not sorted Building(s) Not sorted Action
2011-12-02-09- 22-3202 December 2011Department of Building and Housing Expert Panel Report on the PGC, Forsyth Barr and Hotel Grand Chancellor Buildings, released 30 September 2011Department of Building and Housing Expert Panel Report on the PGC, Forsyth Barr and Hotel Grand Chancellor Buildings, released 30 September 2011
    Department of Building and Housing
    Technical Report
  • Building Failure
  • Buildings - Representative Sample
  • Cambridge 233
  • Cashel 161
  • Colombo 764
2011-10-21-13- 19-5221 October 2011Canterbury Earthquake Sequence and Implications for Seismic Design Levels: Peer Review by Professor Ralph J Archuleta, September 2011Canterbury Earthquake Sequence and Implications for Seismic Design Levels: Peer Review by Professor Ralph J Archuleta, September 2011
    Archuleta, Ralph J
    Technical Report
    Seismicity
    2011-10-21-14- 38-1521 October 2011Foundations on Deep Alluvial Soils: Technical Report by Professor Misko Cubrinovski and Ian McCahon, August 2011Foundations on Deep Alluvial Soils: Technical Report by Professor Misko Cubrinovski and Ian McCahon, August 2011
    • Cubrinovski, Misko
    • Geotech Consulting Ltd
    • McCahon, Ian
    • University of Canterbury
      Technical Report
      Geotechnical
      2012-02-10-15- 12-2410 February 2012Ground Motion and Seismicity Aspects of 4 September 2010 Darfield and 22 February 2011 Christchurch Earthquakes: Technical report by Brendon Bradley of Bradley Seismic Ltd, January 2012Ground Motion and Seismicity Aspects of 4 September 2010 Darfield and 22 February 2011 Christchurch Earthquakes: Technical report by Brendon Bradley of Bradley Seismic Ltd, January 2012
      • Bradley Seismic Ltd
      • Bradley, Brendon
        Technical Report
        Seismicity
        2011-10-21-14- 25-0921 October 2011Performance of Unreinforced Masonry in the 2010/2011 Canterbury Earthquake Swarm: Peer Review by Fred Turner, August 2011Performance of Unreinforced Masonry in the 2010/2011 Canterbury Earthquake Swarm: Peer Review by Fred Turner, August 2011
          Turner, Fred
          Technical Report
          Unreinforced Masonry Buildings (URM)
          2011-10-21-14- 30-3321 October 2011System of Building Controls - Appendix A, Section 4: Building Act tools for the upgrading of the structural performance of buildings - Earthquake-Prone Building Provisions of the Building Act 2004: Policy Guidance for Territorial Authorities: Technical Report by Department of Building and Housing, June 2005System of Building Controls - Appendix A, Section 4: Building Act tools for the upgrading of the structural performance of buildings - Earthquake-Prone Building Provisions of the Building Act 2004: Policy Guidance for Territorial Authorities: Technical Report by Department of Building and Housing, June 2005
            Department of Building and Housing
            Technical Report
            Standards and Regulation
            2012-02-28-16- 23-0028 February 2012Base Isolation and Damage-Resistant Technologies for Improved Seismic Performance of Buildings: Technical Report by Andrew H Buchanan, Des Bull, Rajesh P Dhakal, Gregory MacRae, Alessandro Palermo and Stefano Pampanin, August 2011Base Isolation and Damage-Resistant Technologies for Improved Seismic Performance of Buildings: Technical Report by Andrew H Buchanan, Des Bull, Rajesh P Dhakal, Gregory MacRae, Alessandro Palermo and Stefano Pampanin, August 2011
            • Buchanan, Andrew H
            • Bull, Des
            • Dhakal, Rajesh P
            • MacRae, Gregory
            • Palermo, Alessandro
            • Pampanin, Stefano
              Technical Report
            • Building Failure
            • Engineering
            • New Building Technologies
              2011-10-21-14- 34-5821 October 2011Preliminary Observations from Christchurch Earthquakes: Technical Report by John Hare in conjunction with Structural Engineering Society of New Zealand, August 2011Preliminary Observations from Christchurch Earthquakes: Technical Report by John Hare in conjunction with Structural Engineering Society of New Zealand, August 2011
                Structural Engineering Society of New Zealand
                Technical Report
                Engineering
                2012-02-14-08- 13-2414 February 2012CTV Building Collapse Investigation reports prepared for the Department of Building and Housing CTV Building Collapse Investigation reports prepared for the Department of Building and Housing
                • Department of Building and Housing
                • Hyland Consultants Ltd
                • Structure Smith Consulting Engineers
                  Technical Report
                • Building Failure
                • Buildings - Representative Sample
                  Madras 249
                2011-10-21-14- 11-0421 October 2011System of Building Controls - Appendix A, Section 5: rapid assessment of buildings during a state of emergency - Building safety evaluation during a state of emergency - Guidelines for Territorial Authorities: Technical Report by New Zealand Society for Earthquake Engineering, August 2009System of Building Controls - Appendix A, Section 5: rapid assessment of buildings during a state of emergency - Building safety evaluation during a state of emergency - Guidelines for Territorial Authorities: Technical Report by New Zealand Society for Earthquake Engineering, August 2009
                • Department of Building and Housing
                • New Zealand Society for Earthquake Engineering
                  Technical Report
                • Emergency Powers and Procedures
                • Safety Evaluation
                • Standards and Regulation
                  2012-04-05-14- 02-2405 April 2012Heritage Buildings, Earthquake Strengthening and Damage: The Canterbury Earthquakes September 2010-January 2012: Technical report by Robert McClean and NZHPTHeritage Buildings, Earthquake Strengthening and Damage: The Canterbury Earthquakes September 2010-January 2012: Technical report by Robert McClean and NZHPT
                    New Zealand Historic Places Trust
                    Technical Report
                    Unreinforced Masonry Buildings (URM)
                    2011-11-07-13- 16-1707 November 2011Independent Review of the Response to the Canterbury Earthquake, 4 September 2010: Technical report commissioned by Ministry of Civil Defence & Emergency Management, May 2011Independent Review of the Response to the Canterbury Earthquake, 4 September 2010: Technical report commissioned by Ministry of Civil Defence & Emergency Management, May 2011
                    • Middleton, David
                    • Westlake, Richard
                      Technical Report
                      Christchurch Recovery
                      2011-10-21-12- 50-0821 October 2011System of Building Controls: Letter by Department of Building and Housing to Royal Commission regarding requested documents relating to building failure caused by Canterbury earthquakes, May 2011System of Building Controls: Letter by Department of Building and Housing to Royal Commission regarding requested documents relating to building failure caused by Canterbury earthquakes, May 2011
                      • Bach, Katrina
                      • Department of Building and Housing
                        Technical Report
                      • Building Failure
                      • Engineering
                      • Standards and Regulation
                        2011-10-21-14- 23-0421 October 2011Heritage earthquake prone building strengthening cost study: Technical report by John Hare of Holmes Consulting Group, June 2009Heritage earthquake prone building strengthening cost study: Technical report by John Hare of Holmes Consulting Group, June 2009
                        • Hare, John
                        • Holmes Consulting Group
                          Technical Report
                        • Culture and Heritage
                        • Engineering
                          2012-02-28-16- 23-5828 February 2012Structural Design for Earthquake Resistance - Past, Present and Future of Seismic Design: Technical Report by Associate Professor Rajesh P Dhakal, August 2011Structural Design for Earthquake Resistance - Past, Present and Future of Seismic Design: Technical Report by Associate Professor Rajesh P Dhakal, August 2011
                            Dhakal, Rajesh P
                            Technical Report
                          • Engineering
                          • New Building Technologies
                            2011-10-21-13- 54-5921 October 2011Stairs and Access Ramps Between Floors in Multi-Storey Buildings: Technical Report by Des Bull, August 2011Stairs and Access Ramps Between Floors in Multi-Storey Buildings: Technical Report by Des Bull, August 2011
                            • Bull, Des
                            • Holmes Consulting Group
                              Technical Report
                            • Engineering
                            • Stairs and Floors
                              2011-11-04-15- 00-0004 November 2011The Civil Defence Emergency Management Framework and Response to the 22 February Christchurch Earthquake: Technical report by the Ministry of Civil Defence & Emergency Management, October 2011The Civil Defence Emergency Management Framework and Response to the 22 February Christchurch Earthquake: Technical report by the Ministry of Civil Defence & Emergency Management, October 2011
                                Ministry of Civil Defence and Emergency
                                Technical Report
                              • Emergency Powers and Procedures
                              • Safety Evaluation
                              • Standards and Regulation
                                2011-11-03-16- 05-4003 November 2011Performance of Unreinforced Masonry in the 2010/2011 Canterbury Earthquake Swarm: Technical Report by Associate Professor Jason M Ingham and Professor Michael C Griffith, August 2011Performance of Unreinforced Masonry in the 2010/2011 Canterbury Earthquake Swarm: Technical Report by Associate Professor Jason M Ingham and Professor Michael C Griffith, August 2011
                                • Griffith, Michael C
                                • Ingham, Jason M
                                  Technical Report
                                  Unreinforced Masonry Buildings (URM)
                                  2011-10-21-13- 58-1421 October 2011System of Building Controls - Appendix A, Section 6 - Investigation by the Department of Building and Housing into the building collapses - Technical investigation into the performance of buildings in the Christchurch CBD in the 22 February Christchurch aftershock: Technical Report by Department of Building and Housing, September 2011System of Building Controls - Appendix A, Section 6 - Investigation by the Department of Building and Housing into the building collapses - Technical investigation into the performance of buildings in the Christchurch CBD in the 22 February Christchurch aftershock: Technical Report by Department of Building and Housing, September 2011
                                    Department of Building and Housing
                                    Technical Report
                                  • Building Failure
                                  • Standards and Regulation
                                    2011-11-04-14- 48-5304 November 2011Building Evaluation Transition Team - Processes Used and Lessons Learnt Following the Darfield Earthquake of 4 September 2010: Technical Report by Esther Griffiths of Sisirc Consulting Limited and Deane McNulty of McNulty Engineering Management Limited, January 2011 Building Evaluation Transition Team - Processes Used and Lessons Learnt Following the Darfield Earthquake of 4 September 2010: Technical Report by Esther Griffiths of Sisirc Consulting Limited and Deane McNulty of McNulty Engineering Management Limited, January 2011
                                    • Griffiths, Esther
                                    • McNulty, Deane
                                      Technical Report
                                      Christchurch Recovery

                                      Search results navigation

                                      Displaying 1129 - 1148 of 1327 Items arrow left First arrow left Prev arrow right Next arrow right Last