Canterbury Earthquakes Royal Commission Te Komihana Rūwhenua o Waitaha Canterbury Earthquakes Royal Commission – Te Komihana Rūwhenua o Waitaha

Those who lost relatives and friends in the 22 February earthquake can be assured that there will be a very thorough inquiry into the failure of buildings that resulted in loss of life.
Chair, Justice Mark Cooper

Document library

Document categories

Additional filter options

Choose 1 or more filters then press 'Apply filter'
Reset

Search results

Published Sorted ascending Title Not sorted Author(s) Not sorted Category Not sorted Subject(s) Not sorted Building(s) Not sorted Action
2011-12-05-15- 08-4805 December 2011Preliminary Observations from Christchurch Earthquakes: Report by Structural Engineering Society of New Zealand, September 2011Preliminary Observations from Christchurch Earthquakes: Report by Structural Engineering Society of New Zealand, September 2011
    Structural Engineering Society of New Zealand
      Engineering
      2011-12-05-15- 08-4805 December 2011Preliminary Observations from Christchurch Earthquakes: Report by Structural Engineering Society of New Zealand, September 2011Preliminary Observations from Christchurch Earthquakes: Report by Structural Engineering Society of New Zealand, September 2011
        Structural Engineering Society of New Zealand
          Engineering
          2011-12-05-15- 04-2205 December 2011Guidance on detailed engineering evaluation of earthquake affected non-residential buildings in Canterbury - Part 2: Evaluation procedure (revision 5Guidance on detailed engineering evaluation of earthquake affected non-residential buildings in Canterbury - Part 2: Evaluation procedure (revision 5
            Engineering Advisory Group
            Exhibit
          • Engineering
          • Standards and Regulation
            2011-12-05-13- 31-4405 December 2011PGC Building hearing: Investigation into collapse of Pyne Gould Corporation building: presentation by Rob Jury and Richard Sharpe of BecaPGC Building hearing: Investigation into collapse of Pyne Gould Corporation building: presentation by Rob Jury and Richard Sharpe of Beca
            • Beca Carter Hollings & Ferner Ltd (Beca)
            • Jury, Rob
            • Sharpe, Richard
              Exhibit
              Buildings - Representative Sample
              Cambridge 233
            2011-12-05-11- 09-5905 December 2011Cambridge 233 PGC Building: Department of Building and Housing Investigation of Key Building Performance Report - Appendix 4: Communication letter regarding refurbishmentCambridge 233 PGC Building: Department of Building and Housing Investigation of Key Building Performance Report - Appendix 4: Communication letter regarding refurbishment
              Pyne Gould Corporation Ltd
              Exhibit
              Buildings - Representative Sample
              Cambridge 233
            2011-12-05-11- 08-5905 December 2011Template form 'Statement by Chartered Professional Engineer in respect of the building at:.....'Template form 'Statement by Chartered Professional Engineer in respect of the building at:.....'
              Hare, John
              Exhibit
              Buildings - Representative Sample
              Cambridge 233
            2011-12-05-11- 01-0705 December 2011PGC Building hearing: Presentation to the Royal Commission hearing by Nigel Priestley, Deputy Chair Department of Building and Housing Expert PanelPGC Building hearing: Presentation to the Royal Commission hearing by Nigel Priestley, Deputy Chair Department of Building and Housing Expert Panel
              Priestley, Nigel
              Exhibit
              Buildings - Representative Sample
              Cambridge 233
            2011-12-02-15- 26-4302 December 2011Standards and Regulation for Building Construction in New Zealand by the Institution of Professional Engineers New Zealand, August 2011Standards and Regulation for Building Construction in New Zealand by the Institution of Professional Engineers New Zealand, August 2011
              Institution of Professional Engineers New Zealand (IPENZ)
            • Referenced Document
            • Submission
            • Technical Report
              Standards and Regulation
              2011-12-02-15- 08-1602 December 20112011-12-01 PGC building hearing transcript2011-12-01 PGC building hearing transcript
              • Canterbury Earthquakes Royal Commission
              • Cooper, Justice
                Transcript
                Buildings - Representative Sample
                Cambridge 233
              2011-12-02-09- 22-3202 December 2011Department of Building and Housing Expert Panel Report on the PGC, Forsyth Barr and Hotel Grand Chancellor Buildings, released 30 September 2011Department of Building and Housing Expert Panel Report on the PGC, Forsyth Barr and Hotel Grand Chancellor Buildings, released 30 September 2011
                Department of Building and Housing
                Technical Report
              • Building Failure
              • Buildings - Representative Sample
              • Cambridge 233
              • Cashel 161
              • Colombo 764
              2011-12-01-16- 32-0801 December 20112011-11-28 PGC Building opening statement by Stephen Mills 2011-11-28 PGC Building opening statement by Stephen Mills
              • Canterbury Earthquakes Royal Commission
              • Mills, Stephen
                Opening Statement
                Opening Statement
                Cambridge 233
              2011-12-01-16- 30-3501 December 20112011-11-28 PGC building hearing transcript2011-11-28 PGC building hearing transcript
                Various
                Transcript
                Buildings - Representative Sample
                Cambridge 233
              2011-12-01-16- 24-3501 December 20112011-11-29 PGC Building hearing transcript2011-11-29 PGC Building hearing transcript
                Various
                Transcript
                Buildings - Representative Sample
                Cambridge 233
              2011-12-01-13- 41-0501 December 20112011-11-14 Unreinforced Masonry (URM) Buildings and Earthquake-Prone Policies hearing transcript2011-11-14 Unreinforced Masonry (URM) Buildings and Earthquake-Prone Policies hearing transcript
                Speakers - Various
                Transcript
                Unreinforced Masonry Buildings (URM)
                2011-12-01-13- 25-0101 December 2011Submission by Kenneth Sibly, November 2011 Submission by Kenneth Sibly, November 2011
                  Sibly, Ken
                  Submission
                  Buildings - Representative Sample
                  Cambridge 233
                2011-12-01-09- 09-1901 December 2011Management of Earthquake Risk by Canterbury Regional Council and Christchurch City Council - Obligations and Responses under RMA: Technical Report by Enfocus Ltd, November 2011Management of Earthquake Risk by Canterbury Regional Council and Christchurch City Council - Obligations and Responses under RMA: Technical Report by Enfocus Ltd, November 2011
                  Enfocus Ltd
                  Technical Report
                  Standards and Regulation
                  2011-11-30-14- 41-1330 November 2011Cambridge 233 PGC Building: Photographic summary of primary damage observed from Department of Building and Housing, 16 September 2010Cambridge 233 PGC Building: Photographic summary of primary damage observed from Department of Building and Housing, 16 September 2010
                    Department of Building and Housing
                      Buildings - Representative Sample
                      Cambridge 233
                    2011-11-30-12- 29-0530 November 2011Cambridge 233 PGC Building: Rapid Structural Assessment and Re-inspection after 4 September 2010Cambridge 233 PGC Building: Rapid Structural Assessment and Re-inspection after 4 September 2010
                    • Holmes Consulting Group
                    • Whiteside, Mark
                      Exhibit
                      Buildings - Representative Sample
                      Cambridge 233
                    2011-11-29-16- 24-4929 November 2011Cambridge 233 PGC Building: Statutory Declaration Given by Henry John Hare to DLA Phillips FoxCambridge 233 PGC Building: Statutory Declaration Given by Henry John Hare to DLA Phillips Fox
                      Hare, John
                      Exhibit
                      Buildings - Representative Sample
                      Cambridge 233
                    2011-11-29-12- 18-0729 November 2011Cambridge 233 PGC Building: Memorandum from John Hare, Holmes Consulting Group, to Ian Bisman, Warren & Mahoney Ltd regarding study findingsCambridge 233 PGC Building: Memorandum from John Hare, Holmes Consulting Group, to Ian Bisman, Warren & Mahoney Ltd regarding study findings
                    • Hare, John
                    • Holmes Consulting Group
                      Exhibit
                      Buildings - Representative Sample
                      Cambridge 233

                    Search results navigation

                    Displaying 1126 - 1145 of 1327 Items arrow left First arrow left Prev arrow right Next arrow right Last