Canterbury Earthquakes Royal Commission Te Komihana Rūwhenua o Waitaha Canterbury Earthquakes Royal Commission – Te Komihana Rūwhenua o Waitaha

Those who lost relatives and friends in the 22 February earthquake can be assured that there will be a very thorough inquiry into the failure of buildings that resulted in loss of life.
Chair, Justice Mark Cooper

Document library

Document categories

Additional filter options

Choose 1 or more filters then press 'Apply filter'
Reset

Search results

Published No sorted Title Sorted descending Author(s) Not sorted Category Not sorted Subject(s) Not sorted Building(s) Not sorted Action
2011-11-02-12- 47-3602 November 2011Canterbury Earthquakes Royal Commission summary of the IPENZ report 'Standards and Regulation for Building Construction in New Zealand'Canterbury Earthquakes Royal Commission summary of the IPENZ report 'Standards and Regulation for Building Construction in New Zealand'
    Canterbury Earthquakes Royal Commission
    Technical Report
    Standards and Regulation
    2011-10-28-10- 50-1128 October 2011Canterbury Earthquakes - Scientific Answers to Critical Questions: Submission by The Royal Society of New Zealand, October 2011Canterbury Earthquakes - Scientific Answers to Critical Questions: Submission by The Royal Society of New Zealand, October 2011
      The Royal Society of New Zealand
      Submission
      Seismicity
      2011-10-27-16- 56-5627 October 2011Canterbury Earthquakes - Implications for Building and Construction Standards: Submission by Dr David Hopkins, October 2011Canterbury Earthquakes - Implications for Building and Construction Standards: Submission by Dr David Hopkins, October 2011
        Hopkins, David
        Submission
      • Engineering
      • Unreinforced Masonry Buildings (URM)
        2011-10-28-10- 51-0428 October 2011Canterbury Earthquakes - Answers to Critical Questions About Buildings: Submission by The Royal Society of New Zealand, October 2011Canterbury Earthquakes - Answers to Critical Questions About Buildings: Submission by The Royal Society of New Zealand, October 2011
          The Royal Society of New Zealand
          Submission
          Engineering
          2011-10-21-13- 17-3521 October 2011Canterbury Earthquake Sequence and Implications for Seismic Design Levels: Technical Report compiled by Dr Terry Webb of GNS Science, July 2011Canterbury Earthquake Sequence and Implications for Seismic Design Levels: Technical Report compiled by Dr Terry Webb of GNS Science, July 2011
          • GNS Science
          • Webb, T H (Terry)
            Technical Report
            Seismicity
            2011-10-21-13- 19-5221 October 2011Canterbury Earthquake Sequence and Implications for Seismic Design Levels: Peer Review by Professor Ralph J Archuleta, September 2011Canterbury Earthquake Sequence and Implications for Seismic Design Levels: Peer Review by Professor Ralph J Archuleta, September 2011
              Archuleta, Ralph J
              Technical Report
              Seismicity
              2011-10-21-13- 21-3721 October 2011Canterbury Earthquake Sequence and Implications for Seismic Design Levels: Peer Review by Professor Norman Abrahamson, July 2011Canterbury Earthquake Sequence and Implications for Seismic Design Levels: Peer Review by Professor Norman Abrahamson, July 2011
                Abrahamson, Norman
                Technical Report
                Seismicity
                2011-10-19-17- 16-1219 October 2011Canterbury Earthquake Sequence and Implications for Seismic Design Levels: GNS Science Consultancy Report 2011/183, July 2011 -graphs presented at the hearings into seismicity presented by Dr G McVerryCanterbury Earthquake Sequence and Implications for Seismic Design Levels: GNS Science Consultancy Report 2011/183, July 2011 -graphs presented at the hearings into seismicity presented by Dr G McVerry
                • GNS Science
                • Webb, T H (Terry)
                  Exhibit
                  Seismicity
                  2011-10-20-11- 15-4420 October 2011Canterbury Earthquake Sequence and Implications for Seismic Design Levels: GNS Science Consultancy Report 2011/183, July 2011- Report Extract - pages 34-36Canterbury Earthquake Sequence and Implications for Seismic Design Levels: GNS Science Consultancy Report 2011/183, July 2011- Report Extract - pages 34-36
                  • GNS Science
                  • Webb, T H (Terry)
                    Exhibit
                    Seismicity
                    2011-10-21-13- 05-1421 October 2011Canterbury Earthquake Sequence and Implications for Seismic Design Levels: Peer Review by Professor Ralph Archuleta, October 2011Canterbury Earthquake Sequence and Implications for Seismic Design Levels: Peer Review by Professor Ralph Archuleta, October 2011
                      Archuleta, Ralph J
                    • Exhibit
                    • Technical Report
                      Seismicity
                      2011-11-29-16- 24-4929 November 2011Cambridge 233 PGC Building: Statutory Declaration Given by Henry John Hare to DLA Phillips FoxCambridge 233 PGC Building: Statutory Declaration Given by Henry John Hare to DLA Phillips Fox
                        Hare, John
                        Exhibit
                        Buildings - Representative Sample
                        Cambridge 233
                      2012-03-12-13- 26-1612 March 2012Cambridge 233 PGC Building: Standard producer statement - design is not appropriate for building consentCambridge 233 PGC Building: Standard producer statement - design is not appropriate for building consent
                      • Holmes Consulting Group
                      • Wilkinson, Grant
                        Exhibit
                        Buildings - Representative Sample
                        Cambridge 233
                      2011-11-28-17- 33-5728 November 2011Cambridge 233 PGC building: seismic evaluation of existing building in April 1997 by Holmes Consulting GroupCambridge 233 PGC building: seismic evaluation of existing building in April 1997 by Holmes Consulting Group
                        Kelly, Trevor Edward
                        Exhibit
                        Buildings - Representative Sample
                        Cambridge 233
                      2011-11-30-12- 29-0530 November 2011Cambridge 233 PGC Building: Rapid Structural Assessment and Re-inspection after 4 September 2010Cambridge 233 PGC Building: Rapid Structural Assessment and Re-inspection after 4 September 2010
                      • Holmes Consulting Group
                      • Whiteside, Mark
                        Exhibit
                        Buildings - Representative Sample
                        Cambridge 233
                      2011-11-28-18- 26-1428 November 2011Cambridge 233 PGC Building: Rapid assessment form - Level 1 and Christchurch City Council inspection form templateCambridge 233 PGC Building: Rapid assessment form - Level 1 and Christchurch City Council inspection form template
                        Christchurch City Council
                        Exhibit
                        Buildings - Representative Sample
                        Cambridge 233
                      2011-12-06-11- 12-0706 December 2011Cambridge 233 PGC Building: Progress Report by Beca with comments by Nigel Priestley, June 2011Cambridge 233 PGC Building: Progress Report by Beca with comments by Nigel Priestley, June 2011
                        Priestley, Nigel
                        Exhibit
                        Buildings - Representative Sample
                        Cambridge 233
                      2011-11-28-15- 12-2928 November 2011Cambridge 233 PGC Building: Photographs showing building comparison before and after 22 February 2011 earthquakeCambridge 233 PGC Building: Photographs showing building comparison before and after 22 February 2011 earthquake
                        Canterbury Earthquakes Royal Commission
                        Exhibit
                        Buildings - Representative Sample
                        Cambridge 233
                      2011-11-30-14- 41-1330 November 2011Cambridge 233 PGC Building: Photographic summary of primary damage observed from Department of Building and Housing, 16 September 2010Cambridge 233 PGC Building: Photographic summary of primary damage observed from Department of Building and Housing, 16 September 2010
                        Department of Building and Housing
                          Buildings - Representative Sample
                          Cambridge 233
                        2011-11-29-12- 18-0729 November 2011Cambridge 233 PGC Building: Memorandum from John Hare, Holmes Consulting Group, to Ian Bisman, Warren & Mahoney Ltd regarding study findingsCambridge 233 PGC Building: Memorandum from John Hare, Holmes Consulting Group, to Ian Bisman, Warren & Mahoney Ltd regarding study findings
                        • Hare, John
                        • Holmes Consulting Group
                          Exhibit
                          Buildings - Representative Sample
                          Cambridge 233
                        2011-11-28-15- 15-4428 November 2011Cambridge 233 PGC Building: Level one structural plan and inferred collapse sequenceCambridge 233 PGC Building: Level one structural plan and inferred collapse sequence
                          Beca Carter Hollings and Ferner Ltd (BECA)
                          Exhibit
                          Buildings - Representative Sample
                          Cambridge 233

                        Search results navigation