Canterbury Earthquakes Royal Commission Te Komihana Rūwhenua o Waitaha Canterbury Earthquakes Royal Commission – Te Komihana Rūwhenua o Waitaha

Those who lost relatives and friends in the 22 February earthquake can be assured that there will be a very thorough inquiry into the failure of buildings that resulted in loss of life.
Chair, Justice Mark Cooper

Document library

Document categories

Additional filter options

Choose 1 or more filters then press 'Apply filter'
Reset

Search results

Published No sorted Title Sorted descending Author(s) Not sorted Category Not sorted Subject(s) Not sorted Building(s) Not sorted Action
2012-03-12-12- 55-1612 March 2012Canterbury earthquakes sequence and implications for seismic design levels: submission by Department of Building and Housing, September 2011Canterbury earthquakes sequence and implications for seismic design levels: submission by Department of Building and Housing, September 2011
  • Department of Building and Housing
  • Kelly, David
    Submission
    Seismicity
    2011-11-02-12- 47-3602 November 2011Canterbury Earthquakes Royal Commission summary of the IPENZ report 'Standards and Regulation for Building Construction in New Zealand'Canterbury Earthquakes Royal Commission summary of the IPENZ report 'Standards and Regulation for Building Construction in New Zealand'
      Canterbury Earthquakes Royal Commission
      Technical Report
      Standards and Regulation
      2011-10-28-10- 50-1128 October 2011Canterbury Earthquakes - Scientific Answers to Critical Questions: Submission by The Royal Society of New Zealand, October 2011Canterbury Earthquakes - Scientific Answers to Critical Questions: Submission by The Royal Society of New Zealand, October 2011
        The Royal Society of New Zealand
        Submission
        Seismicity
        2011-10-27-16- 56-5627 October 2011Canterbury Earthquakes - Implications for Building and Construction Standards: Submission by Dr David Hopkins, October 2011Canterbury Earthquakes - Implications for Building and Construction Standards: Submission by Dr David Hopkins, October 2011
          Hopkins, David
          Submission
        • Engineering
        • Unreinforced Masonry Buildings (URM)
          2011-10-28-10- 51-0428 October 2011Canterbury Earthquakes - Answers to Critical Questions About Buildings: Submission by The Royal Society of New Zealand, October 2011Canterbury Earthquakes - Answers to Critical Questions About Buildings: Submission by The Royal Society of New Zealand, October 2011
            The Royal Society of New Zealand
            Submission
            Engineering
            2011-10-21-13- 17-3521 October 2011Canterbury Earthquake Sequence and Implications for Seismic Design Levels: Technical Report compiled by Dr Terry Webb of GNS Science, July 2011Canterbury Earthquake Sequence and Implications for Seismic Design Levels: Technical Report compiled by Dr Terry Webb of GNS Science, July 2011
            • GNS Science
            • Webb, T H (Terry)
              Technical Report
              Seismicity
              2011-10-21-13- 19-5221 October 2011Canterbury Earthquake Sequence and Implications for Seismic Design Levels: Peer Review by Professor Ralph J Archuleta, September 2011Canterbury Earthquake Sequence and Implications for Seismic Design Levels: Peer Review by Professor Ralph J Archuleta, September 2011
                Archuleta, Ralph J
                Technical Report
                Seismicity
                2011-10-21-13- 21-3721 October 2011Canterbury Earthquake Sequence and Implications for Seismic Design Levels: Peer Review by Professor Norman Abrahamson, July 2011Canterbury Earthquake Sequence and Implications for Seismic Design Levels: Peer Review by Professor Norman Abrahamson, July 2011
                  Abrahamson, Norman
                  Technical Report
                  Seismicity
                  2011-10-19-17- 16-1219 October 2011Canterbury Earthquake Sequence and Implications for Seismic Design Levels: GNS Science Consultancy Report 2011/183, July 2011 -graphs presented at the hearings into seismicity presented by Dr G McVerryCanterbury Earthquake Sequence and Implications for Seismic Design Levels: GNS Science Consultancy Report 2011/183, July 2011 -graphs presented at the hearings into seismicity presented by Dr G McVerry
                  • GNS Science
                  • Webb, T H (Terry)
                    Exhibit
                    Seismicity
                    2011-10-20-11- 15-4420 October 2011Canterbury Earthquake Sequence and Implications for Seismic Design Levels: GNS Science Consultancy Report 2011/183, July 2011- Report Extract - pages 34-36Canterbury Earthquake Sequence and Implications for Seismic Design Levels: GNS Science Consultancy Report 2011/183, July 2011- Report Extract - pages 34-36
                    • GNS Science
                    • Webb, T H (Terry)
                      Exhibit
                      Seismicity
                      2011-10-21-13- 05-1421 October 2011Canterbury Earthquake Sequence and Implications for Seismic Design Levels: Peer Review by Professor Ralph Archuleta, October 2011Canterbury Earthquake Sequence and Implications for Seismic Design Levels: Peer Review by Professor Ralph Archuleta, October 2011
                        Archuleta, Ralph J
                      • Exhibit
                      • Technical Report
                        Seismicity
                        2011-11-29-16- 24-4929 November 2011Cambridge 233 PGC Building: Statutory Declaration Given by Henry John Hare to DLA Phillips FoxCambridge 233 PGC Building: Statutory Declaration Given by Henry John Hare to DLA Phillips Fox
                          Hare, John
                          Exhibit
                          Buildings - Representative Sample
                          Cambridge 233
                        2012-03-12-13- 26-1612 March 2012Cambridge 233 PGC Building: Standard producer statement - design is not appropriate for building consentCambridge 233 PGC Building: Standard producer statement - design is not appropriate for building consent
                        • Holmes Consulting Group
                        • Wilkinson, Grant
                          Exhibit
                          Buildings - Representative Sample
                          Cambridge 233
                        2011-11-28-17- 33-5728 November 2011Cambridge 233 PGC building: seismic evaluation of existing building in April 1997 by Holmes Consulting GroupCambridge 233 PGC building: seismic evaluation of existing building in April 1997 by Holmes Consulting Group
                          Kelly, Trevor Edward
                          Exhibit
                          Buildings - Representative Sample
                          Cambridge 233
                        2011-11-30-12- 29-0530 November 2011Cambridge 233 PGC Building: Rapid Structural Assessment and Re-inspection after 4 September 2010Cambridge 233 PGC Building: Rapid Structural Assessment and Re-inspection after 4 September 2010
                        • Holmes Consulting Group
                        • Whiteside, Mark
                          Exhibit
                          Buildings - Representative Sample
                          Cambridge 233
                        2011-11-28-18- 26-1428 November 2011Cambridge 233 PGC Building: Rapid assessment form - Level 1 and Christchurch City Council inspection form templateCambridge 233 PGC Building: Rapid assessment form - Level 1 and Christchurch City Council inspection form template
                          Christchurch City Council
                          Exhibit
                          Buildings - Representative Sample
                          Cambridge 233
                        2011-12-06-11- 12-0706 December 2011Cambridge 233 PGC Building: Progress Report by Beca with comments by Nigel Priestley, June 2011Cambridge 233 PGC Building: Progress Report by Beca with comments by Nigel Priestley, June 2011
                          Priestley, Nigel
                          Exhibit
                          Buildings - Representative Sample
                          Cambridge 233
                        2011-11-28-15- 12-2928 November 2011Cambridge 233 PGC Building: Photographs showing building comparison before and after 22 February 2011 earthquakeCambridge 233 PGC Building: Photographs showing building comparison before and after 22 February 2011 earthquake
                          Canterbury Earthquakes Royal Commission
                          Exhibit
                          Buildings - Representative Sample
                          Cambridge 233
                        2011-11-30-14- 41-1330 November 2011Cambridge 233 PGC Building: Photographic summary of primary damage observed from Department of Building and Housing, 16 September 2010Cambridge 233 PGC Building: Photographic summary of primary damage observed from Department of Building and Housing, 16 September 2010
                          Department of Building and Housing
                            Buildings - Representative Sample
                            Cambridge 233
                          2011-11-29-12- 18-0729 November 2011Cambridge 233 PGC Building: Memorandum from John Hare, Holmes Consulting Group, to Ian Bisman, Warren & Mahoney Ltd regarding study findingsCambridge 233 PGC Building: Memorandum from John Hare, Holmes Consulting Group, to Ian Bisman, Warren & Mahoney Ltd regarding study findings
                          • Hare, John
                          • Holmes Consulting Group
                            Exhibit
                            Buildings - Representative Sample
                            Cambridge 233

                          Search results navigation

                          Displaying 1103 - 1122 of 1327 Items arrow left First arrow left Prev arrow right Next arrow right Last