Published No sorted Title Not sorted Author(s) Not sorted Category Not sorted Subject(s) Sorted descending Building(s) Not sorted Action
2012-01-25-11- 24-2525 January 2012Hereford 194 hearing: Producer statement - PS1 designHereford 194 hearing: Producer statement - PS1 design
    Christchurch City Council
    Exhibit
    Buildings - Representative Sample
    Hereford 194
2012-02-14-12- 49-4614 February 2012Colombo 601/601A hearing: Aerial map of Colombo StreetColombo 601/601A hearing: Aerial map of Colombo Street
    Christchurch City Council
    Exhibit
    Buildings - Representative Sample
  • Colombo 601
  • Colombo 601A
2012-07-13-09- 51-3913 July 2012CTV Building hearing: Statement of Evidence of Andrew William AyersCTV Building hearing: Statement of Evidence of Andrew William Ayers
    Ayers, Andrew William
    Exhibit
    Buildings - Representative Sample
    Madras 249
2012-12-05-23- 38-4605 December 2012Site Investigation Report (Geotech Consulting, November 2011 ) and Structural engineering inspections and assessments (Buchanan & Fletcher Ltd, May 2011) for 79 Cambridge Terrace, Bradley Nuttal HouseSite Investigation Report (Geotech Consulting, November 2011 ) and Structural engineering inspections and assessments (Buchanan & Fletcher Ltd, May 2011) for 79 Cambridge Terrace, Bradley Nuttal House
  • Buchanan Fletcher Ltd
  • Geotech Consulting Ltd
      Buildings - Representative Sample
      Cambridge 79
    2012-07-10-11- 45-2210 July 2012CTV Building hearing: CTV Building Collapse Investigation for CEBPTI Panel - draft report by Dr Clark Hyland and Ashley SmithCTV Building hearing: CTV Building Collapse Investigation for CEBPTI Panel - draft report by Dr Clark Hyland and Ashley Smith
    • Hyland Consultants Ltd
    • Hyland, Clark
    • Smith, Ashley
    • Structure Smith Consulting Engineers
      Exhibit
      Buildings - Representative Sample
      Madras 249
    2012-02-15-17- 59-0215 February 2012High 246 hearing: Architectural plans from Warren & Mahoney Architects Ltd including floor plans, elevation, technical details, and structural designs, part 3 of 5High 246 hearing: Architectural plans from Warren & Mahoney Architects Ltd including floor plans, elevation, technical details, and structural designs, part 3 of 5
    • Holmes Wood Poole & Johnstone Ltd
    • Warren & Mahoney Architects Ltd
      Exhibit
      Buildings - Representative Sample
      Hereford 152
    2012-01-26-15- 37-1126 January 20122012-01-23 Individual Buildings (Except CTV and PGC) Whose Failure Resulted in Loss of Life hearing transcript2012-01-23 Individual Buildings (Except CTV and PGC) Whose Failure Resulted in Loss of Life hearing transcript
      Speakers - Various
      Transcript
      Buildings - Representative Sample
      Lichfield 116
    2012-11-22-16- 49-5222 November 2012CTV Building hearing - Letter from Alan Reay to Clark Hyland dated 21 April 2011confirming information request.CTV Building hearing - Letter from Alan Reay to Clark Hyland dated 21 April 2011confirming information request.
    • Alan Reay Consultants Ltd
    • Reay, Alan
      Exhibit
      Buildings - Representative Sample
      Madras 249
    2012-11-08-15- 23-0908 November 2012CTV Building hearing - Photograph taken on the site of the western wall of the collapsed building on 22 February 2011CTV Building hearing - Photograph taken on the site of the western wall of the collapsed building on 22 February 2011
    • Christchurch Star, The
    • Sloan, Geoff
      Exhibit
      Buildings - Representative Sample
      Madras 249
    2012-07-10-12- 22-3710 July 2012CTV Building hearing: GF Calculations relating to possible collapse scenarios and interior beam-column joint diagramCTV Building hearing: GF Calculations relating to possible collapse scenarios and interior beam-column joint diagram
      Various
      Exhibit
      Buildings - Representative Sample
      Madras 249
    2012-02-14-12- 51-1414 February 2012Colombo 601/601A hearing: Statement of Paul Arthur CampbellColombo 601/601A hearing: Statement of Paul Arthur Campbell
      Campbell, Paul
      Exhibit
      Buildings - Representative Sample
      Colombo 601
    2012-11-23-10- 08-4823 November 2012CTV Building - First statement of evidence of Ashley Henry SmithCTV Building - First statement of evidence of Ashley Henry Smith
      Smith, Ashley
      Exhibit
      Buildings - Representative Sample
      Madras 249
    2012-02-15-17- 58-5015 February 2012High 246 hearing: Architectural plans from Warren & Mahoney Architects Ltd including floor plans, elevation, technical details, and structural designs, part 1 of 5High 246 hearing: Architectural plans from Warren & Mahoney Architects Ltd including floor plans, elevation, technical details, and structural designs, part 1 of 5
    • Holmes Wood Poole & Johnstone Ltd
    • Warren & Mahoney Architects Ltd
      Exhibit
      Buildings - Representative Sample
      Hereford 152
    2012-02-16-12- 20-5516 February 2012Colombo 382 hearing: Statement of Peter AvnellColombo 382 hearing: Statement of Peter Avnell
      Avnell, Peter
      Exhibit
      Buildings - Representative Sample
    • Colombo 380
    • Colombo 382
    2011-12-13-14- 08-3013 December 2011Coleridge 90 hearing: Statement of Marc HobsonColeridge 90 hearing: Statement of Marc Hobson
      Hobson, Marc
      Exhibit
      Buildings - Representative Sample
      Coleridge 90
    2012-08-09-15- 33-0309 August 2012CTV Building hearing: Third Statement of Evidence of Ashley Henry SmithCTV Building hearing: Third Statement of Evidence of Ashley Henry Smith
      Smith, Ashley
      Exhibit
      Buildings - Representative Sample
      Madras 249
    2012-11-23-11- 17-4323 November 2012CTV Building hearing: Second Statement of Evidence of Derek Scott Bradley in relation to the non-linear seismic analysis of the CTV BuildingCTV Building hearing: Second Statement of Evidence of Derek Scott Bradley in relation to the non-linear seismic analysis of the CTV Building
      Bradley, Derek
      Exhibit
      Buildings - Representative Sample
      Madras 249
    2011-11-28-15- 50-3828 November 2011Cambridge 233 PGC Building: Conversion plans and costs for PGC Group from Holmes Consulting Group to Warren and Mahoney, 17 February 1997Cambridge 233 PGC Building: Conversion plans and costs for PGC Group from Holmes Consulting Group to Warren and Mahoney, 17 February 1997
    • Holmes Consulting Group
    • Wilkinson, Grant
      Exhibit
      Buildings - Representative Sample
      Cambridge 233
    2012-07-24-16- 12-1824 July 2012CTV Building hearing: Section 2 of presentation by John Mander: Progressive Damage Accumulation in Earthquakes within the context of the CTV BuildingCTV Building hearing: Section 2 of presentation by John Mander: Progressive Damage Accumulation in Earthquakes within the context of the CTV Building
      Mander, John
      Exhibit
      Buildings - Representative Sample
      Madras 249
    2012-08-16-17- 09-2316 August 2012CTV Building hearing: Statement of Evidence of Grant WilkinsonCTV Building hearing: Statement of Evidence of Grant Wilkinson
      Wilkinson, Grant
      Exhibit
      Buildings - Representative Sample
      Madras 249