Canterbury Earthquakes Royal Commission Te Komihana Rūwhenua o Waitaha Canterbury Earthquakes Royal Commission – Te Komihana Rūwhenua o Waitaha

Those who lost relatives and friends in the 22 February earthquake can be assured that there will be a very thorough inquiry into the failure of buildings that resulted in loss of life.
Chair, Justice Mark Cooper

Document library

Document categories

Additional filter options

Choose 1 or more filters then press 'Apply filter'
Reset

Search results

Published No sorted Title Not sorted Author(s) Not sorted Category Not sorted Subject(s) Sorted ascending Building(s) Not sorted Action
2012-06-26-17- 11-4826 June 2012CTV Building hearing: Level 5 photographs provided by ContechCTV Building hearing: Level 5 photographs provided by Contech
    Higgins, Peter
    Exhibit
    Engineering
    Madras 249
2012-11-27-16- 09-3227 November 2012New Zealand Society for Earthquake Engineering, Assessment and Improvement of the Structural Performance of Buildings in Earthquakes: Including Corregendum No.1New Zealand Society for Earthquake Engineering, Assessment and Improvement of the Structural Performance of Buildings in Earthquakes: Including Corregendum No.1
    New Zealand Society for Earthquake Engineering
    Referenced Document
    Engineering
    2012-09-06-16- 25-4406 September 2012CTV Building hearing: Structural detail drawings by Michael BrooksCTV Building hearing: Structural detail drawings by Michael Brooks
      Brooks, Michael
      Referenced Document
      Engineering
      Madras 249
    2012-11-23-12- 03-1023 November 2012CTV Building hearing: Table of Contents for CTV Non-linear Time-History Analyses (ERSA)CTV Building hearing: Table of Contents for CTV Non-linear Time-History Analyses (ERSA)
      Canterbury Earthquakes Royal Commission
      Exhibit
      Engineering
      Madras 249
    2012-11-27-16- 15-1427 November 2012Post-Earthquake Building Safety Evaluation Procedures - Preparedness Checklist and Response plan for Territorial Authorities, by New Zealand Society for Earthquake Engineering, January 1998Post-Earthquake Building Safety Evaluation Procedures - Preparedness Checklist and Response plan for Territorial Authorities, by New Zealand Society for Earthquake Engineering, January 1998
      New Zealand Society for Earthquake Engineering
      Referenced Document
      Engineering
      2012-09-13-10- 00-2113 September 2012IPENZ Code of Ethics IPENZ Code of Ethics
        Institution of Professional Engineers New Zealand (IPENZ)
        Post hearing submission
        Engineering
        2012-03-12-12- 39-5512 March 2012Review of Expert Panel Report Chapter 4 - Context: Presentation by William T. HolmesReview of Expert Panel Report Chapter 4 - Context: Presentation by William T. Holmes
          Holmes, William T
          Exhibit
          Engineering
          Cambridge 233
        2012-09-13-10- 00-4913 September 2012IPENZ practice notes issued 2003 and 2007IPENZ practice notes issued 2003 and 2007
          Institution of Professional Engineers New Zealand (IPENZ)
          Post hearing submission
          Engineering
          2012-08-07-16- 58-5907 August 2012CTV Building hearing: Composite statement of evidence of Alan Reay - Permit issues CTV Building hearing: Composite statement of evidence of Alan Reay - Permit issues
            Reay, Alan
            Exhibit
            Engineering
            2012-06-28-16- 25-0428 June 2012 CTV Building hearing: Floor plan marking location of beams, spandrels, North core, and South shear wall CTV Building hearing: Floor plan marking location of beams, spandrels, North core, and South shear wall
              Canterbury Earthquakes Royal Commission
              Exhibit
              Engineering
              Madras 249
            2012-08-17-16- 28-4517 August 2012CTV Building hearing: Composite Statement of Evidence of Alan Reay - Holmes Report and Retrofit IssuesCTV Building hearing: Composite Statement of Evidence of Alan Reay - Holmes Report and Retrofit Issues
              Reay, Alan
              Exhibit
              Engineering
              Madras 249
            2012-07-10-12- 00-1510 July 2012CTV Building hearing: Diagram for building, including walls, internal column support, and shear wall loadsCTV Building hearing: Diagram for building, including walls, internal column support, and shear wall loads
              Fenwick, Richard
              Exhibit
              Engineering
              Madras 249
            2012-02-13-11- 42-3313 February 2012Submission by Malcolm Flain, October 2011Submission by Malcolm Flain, October 2011
              Flain, Malcolm
              Submission
              Engineering
              2012-11-27-16- 07-3127 November 2012 Development of seismic vulnerability assessment methodologies over the past 30 years Development of seismic vulnerability assessment methodologies over the past 30 years
              • Bommer, J J
              • Calvi, Gian Michele
              • Crowley, H
              • Magenes, G
              • Pinho, R
              • Restrepo-Vélez, L F
                Referenced Document
                Engineering
                2012-08-15-12- 10-4915 August 2012Training and Education of Engineers and Organisation of the Engineering Profession and Building Assessments after Earthquakes: Submission by the New Zealand Historic Places Trust on the Royal Commission Discussion Papers, July 2012 Training and Education of Engineers and Organisation of the Engineering Profession and Building Assessments after Earthquakes: Submission by the New Zealand Historic Places Trust on the Royal Commission Discussion Papers, July 2012
                  New Zealand Historic Places Trust
                  Submission
                  Engineering
                  2012-07-24-16- 12-1824 July 2012CTV Building hearing: Section 2 of presentation by John Mander: Progressive Damage Accumulation in Earthquakes within the context of the CTV BuildingCTV Building hearing: Section 2 of presentation by John Mander: Progressive Damage Accumulation in Earthquakes within the context of the CTV Building
                    Mander, John
                    Exhibit
                    Engineering
                    Madras 249
                  2012-07-10-12- 03-3410 July 2012CTV Building hearing: Tables from CTV Non-Linear Seismic Analysis Report, by Compusoft Engineering Limited, showing diaphragm connection forces - LytteltonCTV Building hearing: Tables from CTV Non-Linear Seismic Analysis Report, by Compusoft Engineering Limited, showing diaphragm connection forces - Lyttelton
                  • Bradley, Derek
                  • Compusoft Engineering
                  • Stuart, Tony
                    Exhibit
                    Engineering
                    2012-09-13-10- 06-4013 September 2012IPENZ engineering ethics webinar slidesIPENZ engineering ethics webinar slides
                      Institution of Professional Engineers New Zealand (IPENZ)
                      Post hearing submission
                      Engineering
                      2012-08-17-14- 40-3217 August 2012CTV Building hearing: Report by Charles Clifton on the Analysis of the CTV Floor Diaphragm Adequacy prepared for Hyland Consultant Ltd CTV Building hearing: Report by Charles Clifton on the Analysis of the CTV Floor Diaphragm Adequacy prepared for Hyland Consultant Ltd
                      • Clifton, Charles
                      • University of Auckland
                        Exhibit
                        Engineering
                        Madras 249
                      2012-07-10-12- 29-1110 July 2012CTV Building hearing: CTV Building Collapse Technical Investigation - presentation by Dr Clark Hyland and Ashley SmithCTV Building hearing: CTV Building Collapse Technical Investigation - presentation by Dr Clark Hyland and Ashley Smith
                      • Hyland, Clark
                      • Smith, Ashley
                        Exhibit
                        Engineering
                        Madras 249

                      Search results navigation

                      Displaying 1038 - 1057 of 1689 items arrow left First arrow left Prev arrow right Next arrow right Last