Canterbury Earthquakes Royal Commission Te Komihana Rūwhenua o Waitaha Canterbury Earthquakes Royal Commission – Te Komihana Rūwhenua o Waitaha

Those who lost relatives and friends in the 22 February earthquake can be assured that there will be a very thorough inquiry into the failure of buildings that resulted in loss of life.
Chair, Justice Mark Cooper

Document library

Document categories

Additional filter options

Choose 1 or more filters then press 'Apply filter'
Reset

Search results

Published No sorted Title Not sorted Author(s) Not sorted Category Sorted ascending Subject(s) Not sorted Building(s) Not sorted Action
2012-11-27-16- 50-1827 November 2012Letter from GNS Science to Christchurch City Council regarding a student report concerning effects of liquefactionLetter from GNS Science to Christchurch City Council regarding a student report concerning effects of liquefaction
    GNS Science
    Referenced Document
    Geotechnical
    2012-11-27-17- 03-1527 November 2012Estimated Damage and Casualties from Earthquakes Affecting Christchurch, report by GNS Estimated Damage and Casualties from Earthquakes Affecting Christchurch, report by GNS
      GNS Science
      Referenced Document
      Seismicity
      2012-11-27-15- 56-5527 November 2012CTV Building: Email from Willie Palmer of Buddle Findlay, counsel for Alan Reay, to Royal Commission, dated 15 June 2012CTV Building: Email from Willie Palmer of Buddle Findlay, counsel for Alan Reay, to Royal Commission, dated 15 June 2012
      • Buddle Findlay
      • Palmer, Willie
        Referenced Document
        Buildings - Representative Sample
        Madras 249
      2012-11-27-16- 00-3227 November 2012Notices of Motion, 21 October 1985, Christchurch City CouncilNotices of Motion, 21 October 1985, Christchurch City Council
        Christchurch City Council
        Referenced Document
        Standards and Regulation
        2012-11-27-15- 43-4027 November 2012Greater Christchurch Recovery Update, Issue 14Greater Christchurch Recovery Update, Issue 14
          Canterbury Earthquake Recovery Authority (CERA)
          Referenced Document
          Christchurch Recovery
          2012-11-27-16- 09-3227 November 2012New Zealand Society for Earthquake Engineering, Assessment and Improvement of the Structural Performance of Buildings in Earthquakes: Including Corregendum No.1New Zealand Society for Earthquake Engineering, Assessment and Improvement of the Structural Performance of Buildings in Earthquakes: Including Corregendum No.1
            New Zealand Society for Earthquake Engineering
            Referenced Document
          • Engineering
          • Standards and Regulation
          • Structural Performance
            2012-09-06-16- 17-4406 September 2012CTV Building hearing: Schedule – Summary of ARCE time records for Job 2503. CTV Building hearing: Schedule – Summary of ARCE time records for Job 2503.
            • Buddle Findlay
            • Reay, Alan
              Referenced Document
              Buildings - Representative Sample
              Madras 249
            2012-09-06-16- 25-4406 September 2012CTV Building hearing: Structural detail drawings by Michael BrooksCTV Building hearing: Structural detail drawings by Michael Brooks
              Brooks, Michael
              Referenced Document
              Engineering
              Madras 249
            2012-11-27-16- 15-1427 November 2012Post-Earthquake Building Safety Evaluation Procedures - Preparedness Checklist and Response plan for Territorial Authorities, by New Zealand Society for Earthquake Engineering, January 1998Post-Earthquake Building Safety Evaluation Procedures - Preparedness Checklist and Response plan for Territorial Authorities, by New Zealand Society for Earthquake Engineering, January 1998
              New Zealand Society for Earthquake Engineering
              Referenced Document
            • Building assessments after earthquakes
            • Engineering
            • Placarding (Stickering)
            • Safety Evaluation
            • Standards and Regulation
              2012-11-27-15- 47-0727 November 2012 CTV Building: Investigation into the Influence of Strain-Ageing on the Seismic Performance of the Reinforcing Steel from the CTV Building CTV Building: Investigation into the Influence of Strain-Ageing on the Seismic Performance of the Reinforcing Steel from the CTV Building
              • Allington, Chris
              • Holmes Solutions
                Referenced Document
                Buildings - Representative Sample
                Madras 249
              2012-09-06-16- 33-3306 September 2012CTV Building hearing: Letter reply from IPENZ to the Royal Commission's requests of 20 October 2011 and 2 April 2012 for information in relation to the engineering credentials of Graeme Tapper, Bryan Bluck and Gerald ShirtcliffCTV Building hearing: Letter reply from IPENZ to the Royal Commission's requests of 20 October 2011 and 2 April 2012 for information in relation to the engineering credentials of Graeme Tapper, Bryan Bluck and Gerald Shirtcliff
                Institution of Professional Engineers New Zealand (IPENZ)
                Referenced Document
                Buildings - Representative Sample
                Madras 249
              2012-09-06-16- 38-2006 September 2012CTV Building hearing: Press clipping reporting on the sale of the building after being vacant after completion in 1991CTV Building hearing: Press clipping reporting on the sale of the building after being vacant after completion in 1991
                The Press
                Referenced Document
                Buildings - Representative Sample
                Madras 249
              2011-12-02-15- 26-4302 December 2011Standards and Regulation for Building Construction in New Zealand by the Institution of Professional Engineers New Zealand, August 2011Standards and Regulation for Building Construction in New Zealand by the Institution of Professional Engineers New Zealand, August 2011
                Institution of Professional Engineers New Zealand (IPENZ)
                Referenced Document
                Standards and Regulation
                2012-11-28-12- 10-0728 November 2012Update to GNS Science/University of Canterbury July 2011 Report entitled The Canterbury Earthquake Sequence and Implications for Seismic Design Levels, dated 2 April 2012Update to GNS Science/University of Canterbury July 2011 Report entitled The Canterbury Earthquake Sequence and Implications for Seismic Design Levels, dated 2 April 2012
                • Bannister, Stephen
                • Kaiser, Anna
                • Webb, T H (Terry)
                  Referenced Document
                  Seismicity
                  2012-11-27-15- 39-3627 November 2012Dr John Wilson's Contextual Historical Overview of Christchurch City, 2005.Dr John Wilson's Contextual Historical Overview of Christchurch City, 2005.
                    Wilson, John
                    Referenced Document
                  • Architecture
                  • Central Business District (CBD)
                  • Christchurch Recovery
                  • Culture and Heritage
                    2012-11-27-16- 07-3127 November 2012 Development of seismic vulnerability assessment methodologies over the past 30 years Development of seismic vulnerability assessment methodologies over the past 30 years
                    • Bommer, J J
                    • Calvi, Gian Michele
                    • Crowley, H
                    • Magenes, G
                    • Pinho, R
                    • Restrepo-Vélez, L F
                      Referenced Document
                    • Building assessments after earthquakes
                    • Engineering
                    • Placarding (Stickering)
                    • Safety Evaluation
                      2012-11-27-16- 22-4427 November 2012Rapid Evaluation of Building Safety: Learnings from the December 2007 Gisborne Earthquake, presentation by David BrunsdonRapid Evaluation of Building Safety: Learnings from the December 2007 Gisborne Earthquake, presentation by David Brunsdon
                        Brunsdon, Dave
                        Referenced Document
                      • Building assessments after earthquakes
                      • Placarding (Stickering)
                      • Safety Evaluation
                        2012-11-27-16- 48-5627 November 2012Planning for Development of Land on or Close to Active Faults, report by GNS SciencePlanning for Development of Land on or Close to Active Faults, report by GNS Science
                        • Brunsdon, Dave
                        • GNS Science
                        • Kerr, Janine
                        • King, A B
                        • Nathan, Simon
                        • Van Dissen, Russ
                        • Webb, Peter
                          Referenced Document
                        • Seismicity
                        • Standards and Regulation
                          2012-11-27-16- 05-1627 November 2012Building Safety Evaluation During a State of Emergency: Guidelines for Territorial AuthoritiesBuilding Safety Evaluation During a State of Emergency: Guidelines for Territorial Authorities
                            New Zealand Society for Earthquake Engineering
                            Referenced Document
                            Safety Evaluation
                            2012-09-06-16- 41-3406 September 2012CTV Building hearing: RAPID Assessment Form - Level 1 dated 5 September 2010CTV Building hearing: RAPID Assessment Form - Level 1 dated 5 September 2010
                              Christchurch City Council
                              Referenced Document
                              Buildings - Representative Sample
                              Madras 249

                            Search results navigation

                            Displaying 929 - 948 of 1356 items arrow left First arrow left Prev arrow right Next arrow right Last