Canterbury Earthquakes Royal Commission Te Komihana Rūwhenua o Waitaha Canterbury Earthquakes Royal Commission – Te Komihana Rūwhenua o Waitaha

Those who lost relatives and friends in the 22 February earthquake can be assured that there will be a very thorough inquiry into the failure of buildings that resulted in loss of life.
Chair, Justice Mark Cooper

Document library

Document categories

Additional filter options

Choose 1 or more filters then press 'Apply filter'
Reset

Search results

Published No sorted Title Not sorted Author(s) Not sorted Category Sorted ascending Subject(s) Not sorted Building(s) Not sorted Action
2012-09-13-10- 06-4013 September 2012IPENZ engineering ethics webinar slidesIPENZ engineering ethics webinar slides
    Institution of Professional Engineers New Zealand (IPENZ)
    Post hearing submission
  • Engineering
  • Training and Education
    2012-09-13-09- 59-2813 September 2012Table of actions initiated by IPENZ following the 2003 Structural TaskforceTable of actions initiated by IPENZ following the 2003 Structural Taskforce
      Institution of Professional Engineers New Zealand (IPENZ)
      Post hearing submission
    • Engineering
    • Training and Education
      2012-04-02-11- 04-0902 April 2012PGC Building hearing: Post-hearing submission from Holmes Consulting Group in relation to the PGC Building PGC Building hearing: Post-hearing submission from Holmes Consulting Group in relation to the PGC Building
      • Hannan, John
      • Holmes Consulting Group
        Post hearing submission
        Buildings - Representative Sample
        Cambridge 233
      2012-09-13-11- 21-1913 September 2012National Building Consent Authority Competency Assessment System: Department of Building and Housing guidance documentNational Building Consent Authority Competency Assessment System: Department of Building and Housing guidance document
        Department of Building and Housing
        Post hearing submission
        Roles and Responsibilities
        2012-09-13-11- 00-3413 September 2012 IPENZ collection of published articles IPENZ collection of published articles
          Institution of Professional Engineers New Zealand (IPENZ)
          Post hearing submission
        • Engineering
        • Training and Education
          2012-04-02-11- 02-4602 April 2012PGC Building hearing: Post-hearing submission on behalf of Grenadier Real Estate Ltd in relation to the PGC buildingPGC Building hearing: Post-hearing submission on behalf of Grenadier Real Estate Ltd in relation to the PGC building
            NAI Harcourts Real Estate
            Post hearing submission
            Buildings - Representative Sample
            Cambridge 233
          2012-09-06-16- 40-1906 September 2012CTV Building hearing: Photographs of building interior taken on levels 2-5 by Leonard Pagan, Quantity Surveyor for Rawlinsons, as part of a building inspection on 29 September 2010CTV Building hearing: Photographs of building interior taken on levels 2-5 by Leonard Pagan, Quantity Surveyor for Rawlinsons, as part of a building inspection on 29 September 2010
          • Pagan, Leonard
          • Rawlinsons Ltd
            Referenced Document
            Buildings - Representative Sample
            Madras 249
          2012-11-27-16- 50-1827 November 2012Letter from GNS Science to Christchurch City Council regarding a student report concerning effects of liquefactionLetter from GNS Science to Christchurch City Council regarding a student report concerning effects of liquefaction
            GNS Science
            Referenced Document
            Geotechnical
            2012-11-27-17- 03-1527 November 2012Estimated Damage and Casualties from Earthquakes Affecting Christchurch, report by GNS Estimated Damage and Casualties from Earthquakes Affecting Christchurch, report by GNS
              GNS Science
              Referenced Document
              Seismicity
              2012-11-27-15- 56-5527 November 2012CTV Building: Email from Willie Palmer of Buddle Findlay, counsel for Alan Reay, to Royal Commission, dated 15 June 2012CTV Building: Email from Willie Palmer of Buddle Findlay, counsel for Alan Reay, to Royal Commission, dated 15 June 2012
              • Buddle Findlay
              • Palmer, Willie
                Referenced Document
                Buildings - Representative Sample
                Madras 249
              2012-11-27-16- 00-3227 November 2012Notices of Motion, 21 October 1985, Christchurch City CouncilNotices of Motion, 21 October 1985, Christchurch City Council
                Christchurch City Council
                Referenced Document
                Standards and Regulation
                2012-11-27-15- 43-4027 November 2012Greater Christchurch Recovery Update, Issue 14Greater Christchurch Recovery Update, Issue 14
                  Canterbury Earthquake Recovery Authority (CERA)
                  Referenced Document
                  Christchurch Recovery
                  2012-11-27-16- 09-3227 November 2012New Zealand Society for Earthquake Engineering, Assessment and Improvement of the Structural Performance of Buildings in Earthquakes: Including Corregendum No.1New Zealand Society for Earthquake Engineering, Assessment and Improvement of the Structural Performance of Buildings in Earthquakes: Including Corregendum No.1
                    New Zealand Society for Earthquake Engineering
                    Referenced Document
                  • Engineering
                  • Standards and Regulation
                  • Structural Performance
                    2012-09-06-16- 17-4406 September 2012CTV Building hearing: Schedule – Summary of ARCE time records for Job 2503. CTV Building hearing: Schedule – Summary of ARCE time records for Job 2503.
                    • Buddle Findlay
                    • Reay, Alan
                      Referenced Document
                      Buildings - Representative Sample
                      Madras 249
                    2012-09-06-16- 25-4406 September 2012CTV Building hearing: Structural detail drawings by Michael BrooksCTV Building hearing: Structural detail drawings by Michael Brooks
                      Brooks, Michael
                      Referenced Document
                      Engineering
                      Madras 249
                    2012-11-27-16- 15-1427 November 2012Post-Earthquake Building Safety Evaluation Procedures - Preparedness Checklist and Response plan for Territorial Authorities, by New Zealand Society for Earthquake Engineering, January 1998Post-Earthquake Building Safety Evaluation Procedures - Preparedness Checklist and Response plan for Territorial Authorities, by New Zealand Society for Earthquake Engineering, January 1998
                      New Zealand Society for Earthquake Engineering
                      Referenced Document
                    • Building assessments after earthquakes
                    • Engineering
                    • Placarding (Stickering)
                    • Safety Evaluation
                    • Standards and Regulation
                      2012-11-27-15- 47-0727 November 2012 CTV Building: Investigation into the Influence of Strain-Ageing on the Seismic Performance of the Reinforcing Steel from the CTV Building CTV Building: Investigation into the Influence of Strain-Ageing on the Seismic Performance of the Reinforcing Steel from the CTV Building
                      • Allington, Chris
                      • Holmes Solutions
                        Referenced Document
                        Buildings - Representative Sample
                        Madras 249
                      2012-09-06-16- 33-3306 September 2012CTV Building hearing: Letter reply from IPENZ to the Royal Commission's requests of 20 October 2011 and 2 April 2012 for information in relation to the engineering credentials of Graeme Tapper, Bryan Bluck and Gerald ShirtcliffCTV Building hearing: Letter reply from IPENZ to the Royal Commission's requests of 20 October 2011 and 2 April 2012 for information in relation to the engineering credentials of Graeme Tapper, Bryan Bluck and Gerald Shirtcliff
                        Institution of Professional Engineers New Zealand (IPENZ)
                        Referenced Document
                        Buildings - Representative Sample
                        Madras 249
                      2012-09-06-16- 38-2006 September 2012CTV Building hearing: Press clipping reporting on the sale of the building after being vacant after completion in 1991CTV Building hearing: Press clipping reporting on the sale of the building after being vacant after completion in 1991
                        The Press
                        Referenced Document
                        Buildings - Representative Sample
                        Madras 249
                      2011-12-02-15- 26-4302 December 2011Standards and Regulation for Building Construction in New Zealand by the Institution of Professional Engineers New Zealand, August 2011Standards and Regulation for Building Construction in New Zealand by the Institution of Professional Engineers New Zealand, August 2011
                        Institution of Professional Engineers New Zealand (IPENZ)
                        Referenced Document
                        Standards and Regulation

                        Search results navigation

                        Displaying 922 - 941 of 1356 items arrow left First arrow left Prev arrow right Next arrow right Last