Canterbury Earthquakes Royal Commission Te Komihana Rūwhenua o Waitaha Canterbury Earthquakes Royal Commission – Te Komihana Rūwhenua o Waitaha

Those who lost relatives and friends in the 22 February earthquake can be assured that there will be a very thorough inquiry into the failure of buildings that resulted in loss of life.
Chair, Justice Mark Cooper

Document library

Document categories

Additional filter options

Choose 1 or more filters then press 'Apply filter'
Reset

Search results

Published No sorted Title Not sorted Author(s) Not sorted Category Sorted descending Subject(s) Not sorted Building(s) Not sorted Action
2012-11-27-16- 08-4627 November 2012Comparison of international post-earthquake building safety evaluation programsComparison of international post-earthquake building safety evaluation programs
    Turner, Fred
    Referenced Document
  • Building assessments after earthquakes
  • Placarding (Stickering)
  • Safety Evaluation
    2012-03-30-17- 39-4030 March 2012Colombo 593 hearing: Post hearing submission from Holmes Consulting Group to the Royal CommissionColombo 593 hearing: Post hearing submission from Holmes Consulting Group to the Royal Commission
      Holmes Consulting Group
      Post hearing submission
      Buildings - Representative Sample
      Colombo 593
    2012-03-30-17- 41-1830 March 2012Colombo 593 hearing: Post hearing submission from NAI Harcourts to the Royal CommissionColombo 593 hearing: Post hearing submission from NAI Harcourts to the Royal Commission
      NAI Harcourts Real Estate
      Post hearing submission
      Buildings - Representative Sample
      Colombo 593
    2012-04-02-11- 02-0402 April 2012PGC Building hearing: Post-hearing submission of Holmes Consulting Group in relation to the PGC BuildingPGC Building hearing: Post-hearing submission of Holmes Consulting Group in relation to the PGC Building
      Holmes Consulting Group
      Post hearing submission
      Buildings - Representative Sample
      Cambridge 233
    2012-03-30-17- 40-3130 March 2012Colombo 593 hearing: Post hearing submission of Simon Wall to the Royal CommissionColombo 593 hearing: Post hearing submission of Simon Wall to the Royal Commission
      Wall, Simon
      Post hearing submission
      Buildings - Representative Sample
      Colombo 593
    2012-04-02-11- 01-1202 April 2012PGC Building hearing: Post-hearing submission in relation to the PGC Building from Christchurch City CouncilPGC Building hearing: Post-hearing submission in relation to the PGC Building from Christchurch City Council
    • Christchurch City Council
    • Daines, Nadine
    • Laing, Duncan
      Post hearing submission
      Buildings - Representative Sample
      Cambridge 233
    2012-09-13-10- 00-2113 September 2012IPENZ Code of Ethics IPENZ Code of Ethics
      Institution of Professional Engineers New Zealand (IPENZ)
      Post hearing submission
    • Engineering
    • Training and Education
      2012-09-13-10- 00-4913 September 2012IPENZ practice notes issued 2003 and 2007IPENZ practice notes issued 2003 and 2007
        Institution of Professional Engineers New Zealand (IPENZ)
        Post hearing submission
      • Engineering
      • Training and Education
        2012-09-13-10- 06-4013 September 2012IPENZ engineering ethics webinar slidesIPENZ engineering ethics webinar slides
          Institution of Professional Engineers New Zealand (IPENZ)
          Post hearing submission
        • Engineering
        • Training and Education
          2012-09-13-09- 59-2813 September 2012Table of actions initiated by IPENZ following the 2003 Structural TaskforceTable of actions initiated by IPENZ following the 2003 Structural Taskforce
            Institution of Professional Engineers New Zealand (IPENZ)
            Post hearing submission
          • Engineering
          • Training and Education
            2012-04-02-11- 04-0902 April 2012PGC Building hearing: Post-hearing submission from Holmes Consulting Group in relation to the PGC Building PGC Building hearing: Post-hearing submission from Holmes Consulting Group in relation to the PGC Building
            • Hannan, John
            • Holmes Consulting Group
              Post hearing submission
              Buildings - Representative Sample
              Cambridge 233
            2012-09-13-11- 21-1913 September 2012National Building Consent Authority Competency Assessment System: Department of Building and Housing guidance documentNational Building Consent Authority Competency Assessment System: Department of Building and Housing guidance document
              Department of Building and Housing
              Post hearing submission
              Roles and Responsibilities
              2012-09-13-11- 00-3413 September 2012 IPENZ collection of published articles IPENZ collection of published articles
                Institution of Professional Engineers New Zealand (IPENZ)
                Post hearing submission
              • Engineering
              • Training and Education
                2012-04-02-11- 02-4602 April 2012PGC Building hearing: Post-hearing submission on behalf of Grenadier Real Estate Ltd in relation to the PGC buildingPGC Building hearing: Post-hearing submission on behalf of Grenadier Real Estate Ltd in relation to the PGC building
                  NAI Harcourts Real Estate
                  Post hearing submission
                  Buildings - Representative Sample
                  Cambridge 233
                2012-07-10-12- 13-0710 July 2012CTV Building hearing: Non Linear Time Analysis Model of CTV BuildingCTV Building hearing: Non Linear Time Analysis Model of CTV Building
                • Hyland Consultants Ltd
                • Hyland, Clark
                • Smith, Ashley
                • Structure Smith Consulting Engineers
                  Physical copy only
                  Buildings - Representative Sample
                  Madras 249
                2012-11-30-14- 20-5030 November 2012CTV Building hearing: CTV interactive simulation model created for the Royal Commission by Truescape Consulting & Visual Facilitation CTV Building hearing: CTV interactive simulation model created for the Royal Commission by Truescape Consulting & Visual Facilitation
                  Truescape
                  Physical copy only
                  Buildings - Representative Sample
                  Madras 249
                2012-02-28-09- 32-2628 February 2012Manchester 265-271 (Gloucester 173) hearing: Summary for the hearingManchester 265-271 (Gloucester 173) hearing: Summary for the hearing
                • Canterbury Earthquakes Royal Commission
                • Zarifeh, Mark
                  Opening Statement
                  Buildings - Representative Sample
                • Gloucester 173
                • Manchester 265-271
                2012-03-01-14- 15-1601 March 2012Colombo 738 hearing: Documents in the ChronologyColombo 738 hearing: Documents in the Chronology
                  Various
                  Opening Statement
                  Buildings - Representative Sample
                  Colombo 738
                2012-02-15-10- 24-1815 February 2012Gloucester 194 hearing: Chronology of documentsGloucester 194 hearing: Chronology of documents
                  Canterbury Earthquakes Royal Commission
                  Opening Statement
                  Buildings - Representative Sample
                  Gloucester 194
                2012-08-06-16- 43-3806 August 2012CTV Building hearing: Opening Submission for Christchurch City CouncilCTV Building hearing: Opening Submission for Christchurch City Council
                  Christchurch City Council
                  Opening Statement
                  Buildings - Representative Sample
                  Madras 249

                Search results navigation

                Displaying 429 - 448 of 1356 items arrow left First arrow left Prev arrow right Next arrow right Last